Loading...
HomeMy WebLinkAboutStaff Commentsi CITY OF COLLEGE STATION Horne of Texas A&M University® MEMORANDUM RESPONSE TO COMMENTS DATE: August 25, 2014 TO: Peach Creek Partners, LTD, via: jmcfarlane do rockbarncorp.com FROM: Jessica Bullock, Staff Planner SUBJECT: THE HOLLOW PH 1 (PP) Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24" x 36" copy of the revised Preliminary Plan; and Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?paqe=2481 Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Surv., Inc, via: daleb mcclurebrowne.com Robert A. Munger, Brazos County Planning & Traffic, via email RAMunger c(,,brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic, via fax 775.0453 P&DS Project No. 13-00900258 Planning erDevelopment Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS — No. 1 THE HOLLOW PH 1 — 13-00900258 PLANNING (Response provided by: J. Dale Browne, Jr., P.E.) 1. Please change the title block to read Preliminary Plan. As per my conversation with Ms. Bullock, the title will remain as "Preliminary Plat" because the property falls under the vested regulations. 2. Please add note that Old Millican Road is the minor collector indicated on the thoroughfare plan. Note 14 was added to the plat that addresses this comment. 3. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Duly noted. Reviewed by: Jessica Bullock Date: August 25, 2014 ENGINEERING COMMENTS NO. 2 (Response provided by: J. Dale Browne, Jr., P.E.) 1. Old Millican Rd. is required to be constructed to rural collector standards with a 32 -ft pavement width and a 2 -ft ribbon curb along the sides. As per my conversation with Ms. Bridges, a 30' wide pavement with 3' shoulders would be acceptable as per the BCS Unified Design Guidelines. 2. Please show or note the required front, side, and rear lot PUEs. Note 15 was added to the plat that addresses the side and rear lot PUEs. The PUE along the front of each lot is shown on the plat. 3. FYI ... The private gates will need to be located outside of the PUEs. Inset "A" was added to the plat to addresses this comment. Reviewed by: Erika Bridges Date: August 25, 2014 CITY 01, COLLEGE STATION Home of Texas AeM Unive»ity' MEMORANDUMi/� DATE: August 25, 2014 TO: Peach Creek Partners, LTD, via: jmcfarlanena.rockbarncorp.com FROM: Jessica Bullock, Staff Planner SUBJECT: THE HOLLOW PH 1 (PP) Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24" x 36" copy of the revised Preliminary Plan; and Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?paqe=2481 Please note that a Mylar original of the revised preliminary plan will be required after P&Z approval and prior to processing subsequent final plats. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Surv., Inc, via: daleb(a mcclurebrowne.com Robert A. Munger, Brazos County Planning & Traffic, via email, RAMunger(a).brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic, via fax 775.0453! P&DS Project No. 13-00900258 Planning & Development Services P.O. BOX 9960 • 1 101 TEXAS AVENUE • COLLEGE: STATION • TEXAS • 77842 TEL 979.764.3570 • PAX. 979.764.3496 cstm.gov/devservices STAFF REVIEW COMMENTS — No. 1 THE HOLLOW PH 1 —13-00900258 PLANNING 1. Please change the title block to read Preliminary Plan. 2. Please add note that Old Millican Road is the minor collector indicated on the thoroughfare plan. 3. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jessica Bullock Date: August 25, 2014 ENGINEERING COMMENTS NO. 2 1. Old Millican Rd. is required to be constructed to rural collector standards with a 32 -ft pavement width and a 2 -ft ribbon curb along the sides. 2. Please show or note the required front, side, and rear lot PUEs. 3. FYI ... The private gates will need to be located outside of the PUEs. Reviewed by: Erika Bridges Date: August 25, 2014 f/ s"/ CITY OF COLLEGE STATION Home of Texas A&M University* MEMORANDUM RESPONSE TO COMMENTS #2 April 10, 2014 TO: Peach Creek Partners, LTD, via: �mcfarlane(a�rockbarncorp.com FROM: Morgan Hester, Staff Planner SUBJECT: THE HOLLOW PH 1 — Preliminary Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please be aware that the County may have additional comments that will also need to be addressed accordingly. If all comments have been addressed and the following information submitted, your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat; UVL typZF=b• One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(cDcstx.gov; and Not. The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx..qov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Sure., Inc, via email: daleb .mcclurebrowne.com Robert A. Munger, Brazos County Road & Bridge; via email: RAMunger@brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic; via fax: 775.0453 Case file #13-00900258 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: THE HOLLOW PH 1 (PEACH CREEK) (PP) - 13-00900258 PLANNING (Response provided by: J. Dale Browne, Jr., P.E.) 1. As was indicated in the first round of comments, please revise The Hollow to reflect what was shown on the approved Peach Creek Master Plans and provide the minor collector AND adjacent roadway as shown. As an alternative, 1. In order to remove the minor collector as shown on the approved Peach Creek Master Plan, a Comprehensive Plan Amendment to change the Thoroughfare Plan would be required (it is our interpretation that this cannot be simply shifted onto the adjacent tract); a. Please be aware that Staff will not support the above request, but in the event that this is approved, please provide a revised Peach Creek Master Plan to show the removal of the minor collector; and b. In the event that the previous request is approved, please submit The Hollow Preliminary Plan without the minor collector. Please be aware that if the current submittal of The Hollow's Preliminary Plat is not revised to show the minor collector as shown on the approved Peach Creek Master Plan, Staff will not recommend approval. As per our meeting on Monday, August 4'" with Jason Shubert, Jessica Bullock and Erika Bridges, we have made the necessary changes to the "Millican Loop" that will allow it to be compliant with the Thoroughfare Plan. 2. FYI — You will need to remove the gate as shown on Millican Loop as local streets cannot be gated. The gates have been removed from "Millican Loop" now named "Old Millican Road". 3. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Duly noted. Reviewed by: Morgan Hester Date: April 10, 2014 ADDRESSING (Response provided by: J. Dale Browne, Jr., P.E.) 1. Please propose a new street name for Millican Loop. The name, or a similar street name, already exists in College Station, Bryan, and/or the County. Please go to the following web site for a list of street names that already exist, and therefore, cannot be used. http://www.brazos9l l.dst.tx.us/msag/ "Millican Loop" has been renamed to "Old Millican Road". Reviewed by: Robin Krause Date: March 26, 2014 NO TE: Airy changes made to the plans, that have not been requested bj, the Cid, of College Station, niost be elplained ink oar nex7 transmittal letter mtd babbled" onjour plans. Airy additional changes on these plans that have not been pointed out to the Cite, will constitute a complete� nen reviely. 2 of 2 f. CITY OF COLLEGE STATION Home of Terns A&M Univerd y® MEMORANDUM April 10, 2014 TO: Peach Creek Partners, LTD, via: jmcfarlane(c�rockbarncorp.com FROM: Morgan Hester, Staff Planner SUBJECT: THE HOLLOW PH 1 — Preliminary Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please be aware that the County may have additional comments that will also need to be addressed accordingly. If all comments have been addressed and the following information submitted, your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(a)cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Surv., Inc, via email: daleb(a)mcclurebrowne.com Robert A. Munger, Brazos County Road & Bridge; via email. RAMunger@brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic; via fax: 775.0453 Case file #13-00900258 Plnazsaiizg e- Deve,lopuaent Services P.O. 11OX 9964 • 1 101 TEXAS AVENUE • COLLEGE S1:KFION • TEXAS • —/7842 I_ 9-19.'7 64.35-0 • 1 -,AX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 2 Project: THE HOLLOW PH 1 (PEACH CREEK) (PP) - 13-00900258 PLANNING 1. As was indicated in the first round of comments, please revise The Hollow to reflect what was shown on the approved Peach Creek Master Plans and provide the minor collector AND adjacent roadway as shown. As an alternative, 1. In order to remove the minor collector as shown on the approved Peach Creek Master Plan, a Comprehensive Plan Amendment to change the Thoroughfare Plan would be required (it is our interpretation that this cannot be simply shifted onto the adjacent tract); a. Please be aware that Staff will not support the above request, but in the event that this is approved, please provide a revised Peach Creek Master Plan to show the removal of the minor collector; and b. In the event that the previous request is approved, please submit The Hollow Preliminary Plan without the minor collector. Please be aware that if the current submittal of The Hollow's Preliminary Plat is not revised to show the minor collector as shown on the approved Peach Creek Master Plan, Staff will not recommend approval. 2. FYI — You will need to remove the gate as shown on Millican Loop as local streets cannot be gated. 3. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Morgan Hester ADDRESSING Date: April 10, 2014 1. Please propose a new street name for Millican Loop. The name, or a similar street name, already exists in College Station, Bryan, and/or the County. Please go to the following web site for a list of street names that already exist, and therefore, cannot be used. http://www.brazos9l I.dst.tx. us/msag Reviewed by: Robin Krause Date: March 26, 2014 NOTE. Any clmrges made to fle plaits, flat lar)e not Geer iequeded bj, tle Cid, of College Station, mast be explained ink ora• next tiausniittalletter and `Gabbled" onj,orn- plans. Ate additional cl)aages on Hese platys tlat lave not been pointed oat to tle Cite, will constifnfe a cotrrpletejl, nets rwiem. 2 a%2 AL AW Adr MEV AV,, CITY Or COILFGE STATION Home of TexasArM University* MEMORANDUM DATE: December 23, 2013 TO: Peach Creek Partners, LTD, via: jmcfarlane(u�rockbarncorp.com FROM: Morgan Hester, Staff Planner SUBJECT: THE HOLLOW PH 1 — Preliminary Plan Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please be aware that the County may have additional comments that will also need to be addressed accordingly. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(a cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?paqe=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Surv., Inc, via email: daleb(a),mcclurebrowne.com Robert A. Munger, Brazos County Road & Bridge; via email: RAMunger@brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic; via fax: 775.0453 Case file #13-00900258 Planning & Developnnent Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COI .I,EGE STATION • "1TXAS . 77842 TEL. 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: THE HOLLOW PH 1 (PEACH CREEK) (PP) - 13-00900258 PLANNING 1. Please provide a street name for the private road off of Wellborn Road. Please be aware that additional approval will need to come from Brazos 911. 2. Please provide a note that the Final Plat will provide HOA documents for maintenance of the private roadway(s) and the gate. 3. Based on the Peach Creek Master Plan, Phase 1 is shown to be The Meadows off of State Highway 6 and Phase 2 is the Hollow. If the naming and location of the phases is changing, please be aware that the Master Plan will need to be revised. If the intent is to keep The Hollow in the location as shown in this Preliminary Plan, please revise the title block to show that this is Phase 2. 4. Please change the title block to read that this is a Preliminary Plan. 5. Please note that you, the applicant, are responsible for scheduling the plat for consideration by the County Commissioner's Court and for getting the County Judge's signature on the Mylar after they approve the plat. 6. Please note that any changes made to the plans, which have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Morgan Hester Date: December 9, 2013 ENGINEERING COMMENTS NO. 1 1. Please provide letter of intent to serve this property from Wellborn SUD and BTU. 2. Please add a note regarding maintenance of private streets. 3. A minimum 100 -ft right-of-way is needed for the Minor Collector, as shown on the Peach Creek Master Plan, so the western rear lot lines need to be adjusted 10 -ft. FYI... Please note that additional right-of-way may be needed per the County's request due to BTU infrastructure or drainage obstructing the construction of a street in that location. It should be demonstrated that the 100 -ft right-of-way in that location is adequate to construct a minor collector street. 4. Fire flow is required for all lots, so locations of fire hydrants should be shown on the preliminary plan. 5. Per the BCS Unified Design Guidelines, a 6 -inch main can be up to 1500 feet in length and can have no more than 2 fire hydrants. Based on this requirement, a minimum 8 -inch main will be needed. 6. FYI ... The local street may be gated as shown, but other main thoroughfares shown throughout the Peach Creek development will need to be public streets. 7. FYI ... There are several main public thoroughfares shown throughout the Peach Creek Master Plan, and future submissions need to show adequate phasing that will allow for all thoroughfares to be constructed with each subsequent phase. Reviewed by: Erika Bridges Date: December 16, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: December 12, 2013 CITY OF COLL r_,GE STATION Home of Texas ArM University' MEMORANDUM December 23, 2013 TO: Peach Creek Partners, LTD, via: imcfarlane(cDrockbarncorp.com FROM: Morgan Hester, Staff Planner SUBJECT: THE HOLLOW PH 1 — Preliminary Plan Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please be aware that the County may have additional comments that will also need to be addressed accordingly. If all comments have been addressed and the following information submitted by any Monday at 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting held in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Thirteen (13) 11 "x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to pdsdigitalsubmittal(a)-c)and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: J. Dale Browne, Jr, P.E., McClure & Browne Engr./Surv., Inc, via email: daleb _mcclurebrowne.com Robert A. Munger, Brazos County Road & Bridge; via email: RAMunger@brazoscountytx.gov Gary Arnold, Brazos County Planning & Traffic; via fax: 775.0453 Case file #13-00900258 Planning & Development Services P.O. PDX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • 1TXAS • ; 7842 TEL 979.764.3570 • FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: THE HOLLOW PH 1 (PEACH CREEK) (PP) - 13-00900258 PLANNING 1. Please provide a street name for the private road off of Wellborn Road. Please be aware that additional approval will need to come from Brazos 911. 2. Please provide a note that the Final Plat will provide HOA documents for maintenance of the private roadway(s) and the gate. 3. Based on the Peach Creek Master Plan, Phase 1 is shown to be The Meadows off of State Highway 6 and Phase 2 is the Hollow. If the naming and location of the phases is changing, please be aware that the Master Plan will need to be revised. If the intent is to keep The Hollow in the location as shown in this Preliminary Plan, please revise the title block to show that this is Phase 2. 4. Please change the title block to read that this is a Preliminary Plan. 5. Please note that you, the applicant, are responsible for scheduling the plat for consideration by the County Commissioner's Court and for getting the County Judge's signature on the Mylar after they approve the plat. 6. Please note that any changes made to the plans, which have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Morgan Hester Date: December 9, 2013 ENGINEERING COMMENTS NO. 1 1. Please provide letter of intent to serve this property from Wellborn SUD and BTU. 2. Please add a note regarding maintenance of private streets. 3. A minimum 100 -ft right-of-way is needed for the Minor Collector, as shown on the Peach Creek Master Plan, so the western rear lot lines need to be adjusted 10 -ft. FYI... Please note that additional right-of-way may be needed per the County's request due to BTU infrastructure or drainage obstructing the construction of a street in that location. It should be demonstrated that the 100 -ft right-of-way in that location is adequate to construct a minor collector street. 4. Fire flow is required for all lots, so locations of fire hydrants should be shown on the preliminary plan. 5. Per the BCS Unified Design Guidelines, a 6 -inch main can be up to 1500 feet in length and can have no more than 2 fire hydrants. Based on this requirement, a minimum 8 -inch main will be needed. 6. FYI ... The local street may be gated as shown, but other main thoroughfares shown throughout the Peach Creek development will need to be public streets. 7. FYI ... There are several main public thoroughfares shown throughout the Peach Creek Master Plan, and future submissions need to show adequate phasing that will allow for all thoroughfares to be constructed with each subsequent phase. Reviewed by: Erika Bridges Date: December 16, 2013 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: December 12, 2013 CITY OF COLLI ` GF, STATION Home of Texas A&M University' MEMORANDUM DATE: December 3, 2013 TO: Peach Creek Partners, LTD, via: *mcfariane(o)-rockbarncorp.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: THE HOLLOW PH I (PP) Thank you for the submittal of your PRELIMINARY PLAN application. This project will be distributed to staff this week for their review PC: J. Dale Browne, Jr, P.E., McClure ,KBrowne Engr./Surv., Inc, via: daleba-mcclurebrowne.com k P&DS Project No. 13-00900258 Plan tibig 6- Developitiew Services P.O. BOX 9900 - I 1011-17XASAVI-NUE. - COUTICA" ST/V11ONT -'IT\AS . 77842 'I'El_ 979.76,t,357,() - FAX, 9-9.76-1.3496 cstx.gov/devservices