Loading...
HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION CITY ENGINEER DATE: 04/15/15 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF Creek Meadows Section 5 , Phase 3 Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by Phillips Utility & and by their subcontractors as indicated by signatures below. Road Construction, LLC WORK COMPLETED WARRANTY DATE Water (Wellborn CUD) 04/15/15 •Sanitary 04/15/15 Storm Sewer 04/15/15 Streets and Sidewalks 04/15/15 Owner:Creek Meadows Partners, L.P. Contractor: Phillips Utility & Road Phone Number:(979)268-2000 Phone Number: (979) 690-7250 Address: 2800 S Texas Ave. Ste 400 Address:4490 Castlegate Drive Bryan, TX 77802 College Station, TX 77845 • SignatureAfif RA00. Signature: ACCEPTANCE & /APPROVAL •' , R2epr,sentative PLAT FILED e• !'A • OFFSE E_SMTS FILED g-- /0--f(7 <0. TEMr RI_ANKETESMTFILM it Engine1444/1-1 4i_ NO OTHER ESMTS NEEDED Revised 1/31/07 LETTER OF COMPLETION CITY ENGINEER DATE: 04/15/15 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF Creek Meadows Section 5, Phase 3 Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by Phillips Utility& and by their subcontractors as indicated by signatures below. Road Construction, LLC WORK COMPLETED WARRANTY DATE Water (Wellborn SUD) 04/15/15 Sanitary Sewer 04/15/15 U 4YY VZ. Owner:Creek Meadows Partners, L.P. Contractor: Phillips Utility& Road Phone Number:(979)268-2000 Phone Number:(979)690-7250 Address:2800 S Texas Ave. Ste 400 Address:4490 Castlegate Drive Bryan,TX 77802 College Station, TX 77845 RP/ /9 ` f - gSi naturef% Signature: t`". -2_,' ACCEPTANCE APPROVAL PPROVAL ea- aCit Represen tive PLAT FILED N OFFSITE ESMTS FILED TEMP BLANKET ESMT FILED sl- y+1A NO OTHER ESMTS NEEDED y -ngineer Revised 1/31/07