HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE: 04/15/15
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF Creek Meadows
Section 5 , Phase 3
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Phillips Utility &
and by their subcontractors as indicated by signatures below. Road Construction, LLC
WORK COMPLETED WARRANTY DATE
Water (Wellborn CUD) 04/15/15
•Sanitary 04/15/15
Storm Sewer 04/15/15
Streets and Sidewalks 04/15/15
Owner:Creek Meadows Partners, L.P. Contractor: Phillips Utility & Road
Phone Number:(979)268-2000 Phone Number: (979) 690-7250
Address: 2800 S Texas Ave. Ste 400 Address:4490 Castlegate Drive
Bryan, TX 77802 College Station, TX 77845
•
SignatureAfif RA00. Signature:
ACCEPTANCE & /APPROVAL
•' , R2epr,sentative
PLAT FILED
e• !'A • OFFSE E_SMTS FILED
g-- /0--f(7 <0. TEMr RI_ANKETESMTFILM
it Engine1444/1-1 4i_ NO OTHER ESMTS NEEDED
Revised 1/31/07
LETTER OF COMPLETION
CITY ENGINEER DATE: 04/15/15
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF Creek Meadows
Section 5, Phase 3
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Phillips Utility&
and by their subcontractors as indicated by signatures below. Road Construction, LLC
WORK COMPLETED WARRANTY DATE
Water (Wellborn SUD) 04/15/15
Sanitary Sewer 04/15/15
U 4YY VZ.
Owner:Creek Meadows Partners, L.P. Contractor: Phillips Utility& Road
Phone Number:(979)268-2000 Phone Number:(979)690-7250
Address:2800 S Texas Ave. Ste 400 Address:4490 Castlegate Drive
Bryan,TX 77802 College Station, TX 77845
RP/
/9 ` f - gSi naturef% Signature: t`". -2_,'
ACCEPTANCE APPROVAL PPROVAL
ea-
aCit Represen tive
PLAT FILED
N OFFSITE ESMTS FILED
TEMP BLANKET ESMT FILED
sl- y+1A NO OTHER ESMTS NEEDED
y -ngineer
Revised 1/31/07