MEMORANDUM
DATE: September 11, 2014
TO: Craig Browne, via: craig(a@craigbrowne.com
FROM: Mark Bombek, Staff Planner
SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP)
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36"copy of the revised final plat;
Thirteen (13) 11"x17"copies of the revised final plat;
Five (5) copies of the revised construction documents
One (1) copy of the engineering cost estimate and;
One (1) copy of the digital file of the final plat on diskette or e-mail to
pdsdiqitalsubmittal@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.cstx.qov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
PC: Charles & Mary Turner, via: diamondt3375Pyahoo.com
Joe Schultz, P.E., Schultz Engineering, via: joeschultz84Averizon.net
P&DS Project No. 14-00900181
Planning d Development Services
P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STkru)N •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
STAFF REVIEW COMMENTS NO. 2
Project: EQUINOX SUBDIVISION PH 1 (FP) - 14-00900181
PLANNING COMMENTS NO. 2
1. No comments
Reviewed by: Mark Bombek Date: September 10, 2014
ENGINEERING COMMENTS NO. 2
2. Sorry for the confusion on the first set of comments. Note 4 on construction sheet 3/16
should say:
PAVEMENT STRUCTURE FOR TOWERS PARKWAY SHALL BE AS FOLLOWS:
6" LIME STABILIZED SUBGRADE OR CEMENT STABILIZED SUBRADE AS
REQUIRED BY SOIL P.I.
5" HMAC BASE OR 8" CRUSHED LIMESTONE BASE MATERIAL
2" HOT MIX ASPHALTIC CONRETE
Please fix and update cost estimate reflecting this.
3. Please fix culvert details on construction sheet 10/16. The units shown on the cross section
detail are in feet.
4. Confirm that all the flow from Bueda Vida & Williamsgate Phase 1 subdivision have been
taken into account in the Sewer report.
5. Define the cross drainage swale between the lots and lead the concentrated flow under the
sidewalk.
6. Please grade outfall of emergency spillway of the Detention Pond 2 away from existing
homes.
7. Appendix B3 for Addendum to Drainage Report is showing the concrete flume slope as
75%. The slope typo seem to have no effect to the ith-year storm calculations. Is this cell not
linked to the flow calculation? Please double check and fix.
8. Double check engineering estimate for street construction items. Subtotal do not match on
page 1 and 4.
Reviewed by: Kevin Ferrer Date: September 9, 2014
ear
CITY OF COLLEGE STATION
Home of TexasA6M University°
MEMORANDUM
DATE: August 22, 2014
TO: Craig Browne, via: craiqcraigbrowne.com
FROM: Mark Bombek, Staff Planner
SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP)
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
One (1) 24"x36" grading and erosion control plan;
Thirteen (13) 11"x17" copies of the revised final plat;
Parkland Dedication in the amount of $64,311 must be submitted prior to the
filing of the final plat;
Easement Dedication Sheet for Temporary Turnaround;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
pdsdigitalsubmittal(a cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff Review Comments
PC: Charles & Mary Turner, via: diamondt3375 c(Dyahoo.com v`
Joe Schultz, P.E., Schultz Engineering, via: joeschultz84@verizon.net
P&DS Project No. 14-00900181
Planning&Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE S IATION •TEXAS •77842
TEL.979.764.3570 •FAX. 97 9.764.3496
cstx.gov/d evservi ce s
STAFF REVIEW COMMENTS NO. 1
Project: Equinox Subdivision Ph 1 (Fp) (14-00900181)
PLANNING
1. Please correct the label for Rock Prairie Road to read as Rock Prairie Road W.
2. Please include the Common Area Acreage in the Title Block.
3. Please insert the proper scale range in the Title Block. Scale range should be 1"=40'
4. Please note that any changes made to the plans, which have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made aware of
will constitute a completely new review.
5. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
6. The construction documents and reports are still under review and may affect the plat.
7. Please be aware that each lot will be required to provide a minimum of two (2) trees of at
least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No.
3222.
Reviewed by: Mark Bombek, Staff Planner Date: 08/21/2014
ENGINEERING COMMENTS NO. 1
1. Please label existing pavement widths of Rock Prairie Road & Kate Ln on Final
Plat.
2. Please fix the following street name Sophies Lane, street is shown as
Summerway Drive on Preliminary Plat.
3. Please provide a temporary turn around with temporary access easement at the
end of Papa Bear Drive on Final Plat.
4. Please use updated FEMA Maps April 2, 2014 when determining if property lies
within the 100-year floodplain, and update your note reflecting this.
5. Please provide adequate Private Drainage Easement reflecting the construction
grading plan on all Blocks on Final Plat. Also, please change Public Drainage
easement between lot 6 & 5 on Block 1 to Private Drainage Easement.
Additionally, change Public Drainage easement between lot 10 on block 1 &
Diamond Storage Property to Private Drainage Easement.
6. Please add one of the following notes to the Final Plat:
a. Private drainage easement to be maintained by individual lot owners.
Fences, grading, and landscape cannot impede the flow of the private
drainage easement.
b. Private drainage easement to be maintained by HOA. Fences, grading,
and landscape cannot impede the flow of the private drainage easement.
7. Tie a corner of the property to a City of College Station horizontal control
Monument on the Final Plat.
8. Please add a note on Final plat specifying that the area is in Impact fee area,
Steeplechase-Wellborn.
9. Please fix note 4 on construction sheet 3/16. "6" Crushed Limestone Base
material" should be 8".
10. Please add TW to the Legend on sheet 7/16 of the construction plans.
11.Please verify Storm sewer pipe 101 slope. Construction sheet 8/16 shows pipe
101 slope as 1.80%, while on Appendix B4 of the Drainage Report pipe 101
slope is shown as 2.25%.
12.Please fix Drainage Report. Combined Outfall on table Runoff Flow Direction 2
does not add up. Fix the Freeboard column on Table 3. Please answer questions
on Part 4 Appendix D pg.20 of 26. Please confirm the 100 year flow for Detention
Pond 1, summary table shows 6.9 while the Hydrograph is showing 7.03.
13.Please confirm that Detention Pond 1's outflow to Rock Prairie Road drainage
swale has adequate armoring.
14.Please provide the flow depth and velocity at mid-block cross drainage valley
gutter, and cross lot drainage swale.
15.Please Justify and explain how the flow in the Private Drainage on all Blocks is
being discharge to the street.
16.Please fix, the drainage along Block 1 adjacent to Buena Vida Subdivision. It
seems to flow into the rear lot of Buena Vida Subdivision.
17.Please confirm that existing structures on Diamond Storage property is not
adjacent to the proposed drainage swale.
18.Please verify that the elevation of Diamond Storage property adjacent to
Detention Pond 1 & common area is at least 327 feet. If not please provide a 327
feet high Berm along Detention Pond 1 & common area adjacent to Diamond
Storage property.
19.The proposed street intersection does not meet the "dried up" guideline, please
provide additional justification.
20.Please define the flow path for emergency spillway of Detention Pond 2. In the
future development of Phase 2, what's the orientation and flow path for the
emergency Spillway of Detention Pond 2?
21.Please redesign concrete flume 1 & 2 in such a way that the flow through the
channel is sub-critical flow. Design flow depth must be greater than critical depth.
Also please label each concrete flume uniquely on the construction plan.
22.Please base culvert design on TxDOT minimum details, or provide a structural
analysis with justification of the proposed box culvert.
23.Please verify and place note on the plan that water services will be left between 2
feet and maximum of 3 feet deep at the point of terminus by developer's
contractor. Also note that a ball valve is required at the point of terminus.
24.Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 in such
a way that the centerline of the sewer lines are no closer than 5.5 feet to the
edge of easement, and that the wyes do not pass the easement.
25.Please Note that the existing sewer line on Kate Lane is 6". Please fix the
construction plans & Sewer report reflecting this. Please provide documentation
that the existing 6" line through Buena Vida Subdivision has sufficient Capacity to
serve the increase flow from Equinox Subdivision.
26.Please fix the Stationing for Sewer Line S-3. The stationing on profile are not
matching the plan.
27.Due to the depth of Sewer Line S-3 & S-2, we would require an additional 5 feet
easement totaling to 15 feet Public Utility Easement on all the lots adjacent to
these sewer lines.
28.Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS
minimum slope, please provide justification.
29. Provide a typical layout detail of water meter, cleanout, and transformer. To ensure that
adequate fits within proposed easement when you include other private utilities. Please
confirm with BTU.
30. Please provide Street Sign table. If you have not received block ranges, contact Robin
rkrause@cstx.gov.
31. Should there not be a streetlight on Towers Parkway and Rock Prairie Road?
32. Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane.
33. On block 3, the finish floor elevation for the lots seems to be the same elevation as the
top of Katie Lane's pavement. We recommend to raise the finish floor elevation by at
least 6".
Reviewed by: Kevin Ferrer Date: August 19, 2014
FIRE
1) No more than thirty (30) dwelling units without two points of egress.
Reviewed by: Steve Smith Date: 08/11/2014
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 12, 2014
(1111frir
CITY OF COLLEGE STATION
Home of Texas A&M University'
MEMORANDUM
DATE: August 8, 2014
TO: Craig Browne, via: craig@craigbrowne.com
FROM: Mark Bombek, Staff Planner
SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP)
Thank you for the submittal of your Final Plat - Residential application. Jason Schubert,
Principal Planner, Kevin Ferrer, Graduate Civil Engineer, and I have been assigned to review
this project. It is anticipated that the review will be completed and any staff comments returned
to you on or before Friday, August 22, 2014. If you have questions in the meantime, please feel
free to contact us.
PC: Charles & Mary Turner, via: diamondt3375@yahoo.com
Joe Schultz, P.E., Schultz Engineering, via: joeschultz84@verizon.net
P&DS Project No. 14-00900181
Planning e'`Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE•COLLEGE STATION •TEXAS •77842
TEL.979.764.357.0•FAX. 979.764.3496
(*ff1144
CITY OF COLLEGE[.G.E STATION
Home of texas A&M University*
MEMORANDUM 1./��\\
TO: Craig Browne, via: craiq cr craigbrowne.com
FROM: Jason Schubert, Principal Planner
SUBJECT: EQUINOX SUBDIVISION PHASE 1 (FP)
I reviewed the above-mentioned Final Plat - Residential application and determined it to be
incomplete. The following is the preliminary list of items needed to complete the submittal.
Please submit the following information so this application can be forwarded for review:
In accordance with the requirements for processing applications, the
Preliminary Plan for this project has not been approved by the Planning &
Zoning Commission to enable this application to be forwarded for review.
Please be aware that if this application is not completed before Monday, September 15, 2014, it
will expire and a new application and fees will be necessary to continue the platting process.
If you have any questions or need additional information, please call me at 979.764.3570.
PC: Charles & Mary Turner, via:
Joe Schultz, P.E., Schultz Engineering, via:
P&DS Project No. 14-00900181
Planning dr Development Services
P.O.BOX 9960 • 1 101 TEXAS AVENUE•COI..LEGE STATION •TEXAS •77842
TEL.979.764.3570•FAX. 979.764.3496
cstx.gov/devservices
STAFF REVIEW COMMENTS NO. 1
Project: Equinox Subdivision Ph 1 (Fp) (14-00900181)
PLANNING
1. Please correct the label for Rock Prairie Road to read as Rock Prairie Road W.
The label has been changed.
2. Please include the Common Area Acreage in the Title Block.
The total common area acreage has been added to the title block. Also, the
individual acreage of the 2 common areas has been added to the plan view.
3. Please insert the proper scale range in the Title Block. Scale range should be 1"=40'
The title block has been revised.
4. Please note that any changes made to the plans, which have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made aware of
will constitute a completely new review.
Noted.
5. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Noted.
6. The construction documents and reports are still under review and may affect the plat.
Noted.
7. Please be aware that each lot will be required to provide a minimum of two (2) trees of at
least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No.
3222.
Noted. Note 13 is on the final plat
ENGINEERING COMMENTS NO. 1
Please label existing pavement widths of Rock Prairie Road & Kate Ln on Final Plat.
The pavement widths are now labeled on the Final Plat and on the
construction documents.
Please fix the following street name Sophies Lane, street is shown as Summerway
Drive on Preliminary Plat.
The street names now match the Preliminary Plat.
Please provide a temporary turn around with temporary access easement at the end
of Papa Bear Drive on Final Plat.
The construction plans now show a temporary turn around at the end of
Papa Bear Drive. Also, a temporary access easement is shown at the end
of Papa Bear Drive on the Final Plat. The addition of a temporary
turnaround made it necessary to extend Pipe 200. Appendix B4 was
updated to reflect this change. The additional base material and the
additional pipe is reflected in the attached revised Engineer's Estimate.
i! Please use updated FEMA Maps April 2, 2014 when determining if property lies
within the 100-year floodplain, and update your note reflecting this.
The FEMA flood information has been updated.
X. Please provide adequate Private Drainage Easement reflecting the construction
grading plan on all Blocks on Final Plat. Also, please change Public Drainage
` easement between lot 6 & 5 on Block 1 to Private Drainage Easement. Additionally,
change Public Drainage easement between lot 10 on block 1 & Diamond Storage
Property to Private Drainage Easement.
Private Drainage Easements have been added between the lots at various
locations. The Public Drainage Easements between Lots 6 & 5, Block 1 and
adjacent to the diamond storage property have both been changed to
Private Drainage Easements.
,. . Please add one of the following notes to the Final Plat:
a. Private drainage easement to be maintained by individual lot owners. Fences,
grading, and landscape cannot impede the flow of the private drainage easement.
b. Private drainage easement to be maintained by HOA. Fences, grading, and
landscape cannot impede the flow of the private drainage easement.
Option A has been added as note 14
7 Tie a corner of the property to a City of College Station horizontal control Monument
on the Final Plat.
The plat is now shown to be tied to monument#117
f Please add a note on Final plat specifying that the area is in Impact fee area,
Steeplechase-Wellborn.
Note #10 is updated to show the project is in the Steeplechase-Wellborn
ci) Sanitary Sewer Impact Fee Area
Please fix note 4 on construction sheet 3/16. "6" Crushed Limestone Base material"
should be 8".
Note #4 has been updated.
1/Please add TW to the Legend on sheet 7/16 of the construction plans.
TW has been added to the Legend.
.Please verify Storm sewer pipe 101 slope. Construction sheet 8/16 shows pipe 101
slope as 1.80%, while on Appendix B4 of the Drainage Report pipe 101 slope is
shown as 2.25%.
The information in Appendix B4 is incorrect. It has been updated to fix the
flowlines and the slopes of Pipes 100 and 101. A copy of Appendix B4 is
included in this submittal.
12.Please fix Drainage Report. Combined Outfall on table Runoff Flow Direction 2 does
not add up. Fix the Freeboard column on Table 3. Please answer questions on Part
4 Appendix D pg.20 of 26. Please confirm the 100 year flow for Detention Pond 1,
summary table shows 6.9 while the Hydrograph is showing 7.03.
The Combined Outfall for Flow Direction 2 is not the sum of the Detention
Pond 1 Outfall and Drainage Area 230. The Combined Outfall for Flow
Direction 2 is a combination of the hydrographs and takes into account
timing in the watershed. The Freeboard column on Table 3 has been
updated. Questions on Part 4 Appendix D pg. 20 of 26 have been
answered. The 100 year flow for Detention Pond 1 is 7.03, the summary
table has been revised.
Vv'Please confirm that Detention Pond 1's outflow to Rock Prairie Road drainage swale
has adequate armoring.
Additional Concrete and rock riprap was added at this location to provide
additional armoring.
X14 Please provide the flow depth and velocity at mid-block cross drainage valley gutter,
and cross lot drainage swale.
A drainage addendum is included in this submittal with an Appendix E
showing depth of flow and velocity at this location. An Appendix F is
included evaluating the cross lot drainage Swale.
1 .Please Justify and explain how the flow in the Private Drainage on all Blocks is being
discharge to the street.
Drainage will flow over the sidewalk as sheet flow and into the curb and
_ gutter. Appendix F evaluates depth of flow over sidewalk.
;'16'.Please fix, the drainage along Block 1 adjacent to Buena Vida Subdivision. It seems
to flow into the rear lot of Buena Vida Subdivision.
A drainage swale is proposed in this location taking drainage over the
sidewalk into the Kate Lane curb and gutter. Spot elevations are shown on
the grading plan to indicate intent.
Please confirm that existing structures on Diamond Storage property is not adjacent
to the proposed drainage swale.
The berm from the pond is proposed to extend between the drainage swale
and the Diamond Storage property.
Please verify that the elevation of Diamond Storage property adjacent to Detention
Pond 1 & common area is at least 327 feet. If not please provide a 327 feet high
Berm along Detention Pond 1 & common area adjacent to Diamond Storage
property.
The detention pond berm is proposed in this area.
19.The proposed street intersection does not meet the "dried up" guideline, please
provide additional justification.
The intersections in this project are either "local-local" or "collector-local"
in which case valley gutters are acceptable. On Towers Parkway the valley
gutters are proposed parallel to Towers Parkway. Appendix B1 and Exhibit
C have been updated to evaluate the depth of flow at the curve return of the
Kate Lane and Summerway Drive intersection.
20.Please define the flow path for emergency spillway of Detention Pond 2. In the future
development of Phase 2, what's the orientation and flow path for the emergency
Spillway of Detention Pond 2?
The emergency spillway will only be used in the clogged condition of the
outflow structure. It is not intended for use unless under extreme
conditions. In the case that the outflow structure is clogged, the runoff will
continue in a northerly direction towards The Barracks Subdivision similar
to existing conditions. In the future the detention pond will be re-designed
and likely connect to the infrastructure into a future section of the Barracks
Subdivision and the future overflow spillway will likely be directed to a
street right of way.
y.Please redesign concrete flume 1 & 2 in such a way that the flow through the
channel is sub-critical flow. Design flow depth must be greater than critical depth.
Also please label each concrete flume uniquely on the construction plan.
The slope of concrete flume is now 0.75%. The cross-section of concrete
flume 2 and the slope have changed so that the flow depth is greater than ,
the critical depth. A revised appendix B3 is included in this submittal.
2'.Please base culvert design on TxDOT minimum details, or provide a structural
analysis with justification of the proposed box culvert.
The 24" x 15" box culvert design exceeds the minimum TXDOT design
requirements and details for Single Box Culverts, Cast in Place, 0' fill,
Detail SCC-3 & 4. A comparison to a 3'x 2' box for the wall thickness and
rebar spacing is as follows:
Concrete
Design TxDOT Detail
Top Slab Thickness 7"+ 7"
Wall Thickness 8" 7"
Bottom Thickness 8" 7"
Reinforcing Steel
Design TxDOT Detail
Top Slab Thickness Top Material #4@12" #4@13"
Bottom Material #4@6" _ #4@7"
Transverse Material #4@12" #4@18"
Wall Thickness Top Material #4@10" #4@10"
Bottom Material #4@12" _ #4@18"
Transverse Material #4@12" #4@18"
Bottom Thickness Top Material #4@7" #4@7"
Bottom Material #4@10" #4@10"
Transverse Material #4@12" #4@18"
This design for a direct travel box culvert has previously been constructed
with a greater span than the 24"span proposed for this box culvert and has
performed well. The box culvert design will support the anticipated loads
for the street.
X.Please verify and place note on the plan that water services will be left between 2
feet and maximum of 3 feet deep at the point of terminus by developer's contractor.
Also note that a ball valve is required at the point of terminus.
Notes have been added to all of the water construction sheets.
r4.Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 in such a
way that the centerline of the sewer lines are no closer than 5.5 feet to the edge of
easement, and that the wyes do not pass the easement.
A 15'PUE is shown on the plat and the plans.
76.Please Note that the existing sewer line on Kate Lane is 6". Please fix the
construction plans & Sewer report reflecting this. Please provide documentation that
the existing 6" line through Buena Vida Subdivision has sufficient Capacity to serve
the increase flow from Equinox Subdivision.
The plans have been corrected to show the sewer line at Kate Lane being
6". A revised sewer report is included in this submittal. The 6" line
through Buena Vida Subdivision is analyzed in the revised report.
A.Please fix the Stationing for Sewer Line S-3. The stationing on profile are not
matching the plan.
The stationing has been fixed for this line.
, .Due to the depth of Sewer Line S-3 & S-2, we would require an additional 5 feet
easement totaling to 15 feet Public Utility Easement on all the lots adjacent to these
sewer lines.
A 15'PUE is added to all lots adjacent to sewer lines
*Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS minimum
slope, please provide justification.
Minimum slope for an 8"pipe is 0.55%. Since the outflow pipe is a 6"pipe,
the sewer system in this project will all be 6"pipe
"4. Provide a typical layout detail of water meter, cleanout, and transformer. To ensure that
adequate fits within proposed easement when you include other private utilities. Please
confirm with BTU. Wei(
Due to the wider street an additional 5' was added to the PUE mauve necessary. A
detail was added to sheet 2 showing the proposed layout. This detail was sent to
Walter Williams BTU and an email with his approval is attached to this submittal.
The detail is in accordance with BTU's•16. Please provide Street Sign table. If you have not received block ranges, contact Robin
rkrause(a�cstx.gov.
A street sign table is included in the plans.
. Should there not be a streetlight on Towers Parkway and Rock Prairie Road?
A street light has been added at this location.
Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane.
These ADA ramps have been removed from the plans.
On block 3, the finish floor elevation for the lots seems to be the same elevation as the top
of Katie Lane's pavement. We recommend to raise the finish floor elevation by at least 6".
The finished floor of all the lots on this block has been raised 6".
FIRE
1) No more than thirty (30) dwelling units without two points of egress.
Noted.
SANITATION
1. Sanitation is ok with this project.
Noted.
Ricky Flores
From: Walter Williams <williams@btutilities.com>
Sent: Tuesday, August 26, 2014 3:43 PM
To: Ricky Flores
Subject: RE: Equinox Phase 1
Hey Ricky,
I'm sorry for the delayed response. I am just getting back to the office. David and I reviewed the layout and it looks fine.
Thank you,
Walter Williams
BTU Line Design
979-821-5766 office
979-200-0441 cell
979-821-5796 fax
This e-mail and/or attachment is for the sole use of the intended recipient(s)
and may contain confidential and/or legally privileged information. Any
unauthorized review, use, disclosure or distribution is prohibited. If you are
not the intended recipient, please contact the sender by reply e-mail and
destroy all electronic and paper copies of the original message and any
attachments.
From: Ricky Flores [mailto:ricky@schultzengineeringllc.com]
Sent: Tuesday, August 26, 2014 2:59 PM
To: Walter Williams
Subject: Equinox Phase 1
Walter,
Can I get your blessing on this detail I made for our construction plans? I followed the details from BTU's guideline I just
proposed a set distance off of the ROW. I couldn't find a set distance in the guidelines.
Thanks
Ricky Flores
This e-mail and/or attachment is for the sole use of the intended recipient(s)
and may contain confidential and/or legally privileged information. Any
unauthorized review, use, disclosure or distribution is prohibited. If you are
not the intended recipient, please contact the sender by reply e-mail and
destroy all electronic and paper copies of the original message and any
attachments.
1
STAFF REVIEW COMMENTS NO. 1
Prniact• Fni ihriivicinn Ph 1 (Fn' (1 d_nngnnl Al)
PLANNING
1. Please correct the label for Rock Prairie Road to read as Rock Prairie Road W.
The label has been changed.
2. Please include the Common Area Acreage in the Title Block.
The total common area acreage has been added to the title block. Also, the
individual acreage of the 2 common areas has been added to the plan view.
3. Please insert the proper scale range in the Title Block. Scale range should be 1"=40'
The title block has been revised.
4. Please note that any changes made to the plans, which have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made aware of
will constitute a completely new review.
Noted.
5. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Noted.
6. The construction documents and reports are still under review and may affect the plat.
Noted.
7. Please be aware that each lot will be required to provide a minimum of two (2) trees of at
least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No.
3222.
Noted. Note 13 is on the final plat
ENGINEERING COMMENTS NO. 1
Please label existing pavement widths of Rock Prairie Road & Kate Ln on Final Plat.
The pavement widths are now labeled on the Final Plat and on the
construction documents.
Please fix the following street name Sophies Lane, street is shown as Summerway
Drive on Preliminary Plat.
The street names now match the Preliminary Plat.
Please provide a temporary turn around with temporary access easement at the end
of Papa Bear Drive on Final Plat.
The construction plans now show a temporary turn around at the end of
Papa Bear Drive. Also, a temporary access easement is shown at the end
of Papa Bear Drive on the Final Plat. The addition of a temporary
turnaround made it necessary to extend Pipe 200. Appendix B4 was
updated to reflect this change. The additional base material and the
additional pipe is reflected in the attached revised Engineer's Estimate.
i! Please use updated FEMA Maps April 2, 2014 when determining if property lies
within the 100-year floodplain, and update your note reflecting this.
The FEMA flood information has been updated.
Please provide adequate Private Drainage Easement reflecting the construction
`vrnrl nn r,lnr, nn nI1 DIni+Ln nn Cinnl Dln1 Alnn nlnnnn nknn` n Daiklin Ilrnirinrn
yicaul!t pal I vi I aII un_A,r,.o VI I I r..a. I IaL. i�iov I✓ica�c L I tai IJL. i uuII'., vi an Iayc
easement between lot 6 & 5 on Block 1 to Private Drainage Easement. Additionally,
change Public Drainage easement between lot 10 on block 1 & Diamond Storage
Property to Private Drainage Easement.
Private Drainage Easements have been added between the lots at various
locations. The Public Drainage Easements between Lots 6 & 5, Block 1 and
adjacent to the diamond storage property have both been changed to
Private Drainage Easements.
Please add one of the following notes to the Final Plat:
a. Private drainage easement to be maintained by individual lot owners. Fences,
grading, and landscape cannot impede the flow of the private drainage easement.
b. Private drainage easement to be maintained by HOA. Fences, grading, and
landscape cannot impede the flow of the private drainage easement.
Option A has been added as note 14
Tie a corner of the property to a City of College Station horizontal control Monument
on the Final Plat.
The plat is now shown to be tied to monument#117
f! Please add a note on Final plat specifying that the area is in Impact fee area,
Steeplechase-Wellborn.
Note #10 is updated to show the project is in the Steeplechase-Wellborn
Sanitary Sewer Impact Fee Area
1(A
Please fix note 4 on construction sheet 3/16. "6" Crushed Limestone Base material"
should be 8".
Note #4 has been updated.
i/Please add TW to the Legend on sheet 7/16 of the construction plans.
TW has been added to the Legend.
/.Please verify Storm sewer pipe 101 slope. Construction sheet 8/16 shows pipe 101
slope as 1.80%, while on Appendix B4 of the Drainage Report pipe 101 slope is
shown as 2.25%.
The information in Appendix B4 is incorrect. It has been updated to fix the
flowlines and the slopes of Pipes 100 and 101. A copy of Appendix B4 is
included in this submittal.
12.Please fix Drainage Report. Combined Outfall on table Runoff Flow Direction 2 does
not add up. Fix the Freeboard column on Table 3. Please answer questions on Part
4 Appendix D pg.20 of 26. Please confirm the 100 year flow for Detention Pond 1,
summary table shows 6.9 while the Hydrograph is showing 7.03.
The Combined Outfall for Flow Direction 2 is not the sum of the Detention
Pond 1 Outfall and Drainage Area 230. The Combined Outfall for Flow
Direction 2 is a combination of the hydrographs and takes into account
timing in the watershed. The Freeboard column on Table 3 has been
updated. Questions on Part 4 Appendix D pg. 20 of 26 have been
answered. The 100 year flow for Detention Pond 1 is 7.03, the summary
table has been revised.
/,�.Please confirm that Detention Pond 1's outflow to Rock Prairie Road drainage swale
I IdJ dUCliUd1C di I Homily.
Additional Concrete and rock riprap was added at this location to provide
additional armoring.
X14 Please provide the flow depth and velocity at mid-block cross drainage valley gutter,
and cross lot drainage swale.
A drainage addendum is included in this submittal with an Appendix E
showing depth of flow and velocity at this location. An Appendix F is
Ol1included evaluating the cross lot drainage swale.
.Please Justify and explain how the flow in the Private Drainage on all Blocks is being
discharge to the street.
Drainage will flow over the sidewalk as sheet flow and into the curb and
gutter. Appendix F evaluates depth of flow over sidewalk.
,''16.Please fix, the drainage along Block 1 adjacent to Buena Vida Subdivision. It seems
to flow into the rear lot of Buena Vida Subdivision.
A drainage swale is proposed in this location taking drainage over the
sidewalk into the Kate Lane curb and gutter. Spot elevations are shown on
the grading plan to indicate intent.
Please confirm that existing structures on Diamond Storage property is not adjacent
to the proposed drainage swale.
The berm from the pond is proposed to extend between the drainage swale
and the Diamond Storage property.
3.Please verify that the elevation of Diamond Storage property adjacent to Detention
Pond 1 & common area is at least 327 feet. If not please provide a 327 feet high
Berm along Detention Pond 1 & common area adjacent to Diamond Storage
property.
The detention pond berm is proposed in this area.
19.The proposed street intersection does not meet the "dried up" guideline, please
provide additional justification.
The intersections in this project are either "local-local" or "collector-local"
in which case valley gutters are acceptable. On Towers Parkway the valley
gutters are proposed parallel to Towers Parkway. Appendix B1 and Exhibit
C have been updated to evaluate the depth of flow at the curve return of the
Kate Lane and Summerway Drive intersection.
20.Please define the flow path for emergency spillway of Detention Pond 2. In the future
development of Phase 2, what's the orientation and flow path for the emergency
Spillway of Detention Pond 2?
The emergency spillway will only be used in the clogged condition of the
outflow structure. It is not intended for use unless under extreme
conditions. In the case that the outflow structure is clogged, the runoff will
continue in a northerly direction towards The Barracks Subdivision similar
to existing conditions. In the future the detention pond will be re-designed
and likely connect to the infrastructure into a future section of the Barracks
Subdivision and the future overflow spillway will likely be directed to a
street right of way.
;A.Please redesign concrete flume 1 & 2 in such a way that the flow through the
LI el U Iii'., .1 FI...., Pl....:,..... FI...., GIJLI I LJ AGI I I I '+:....1 U�..JLI I.
Is JU V-l.l llll�Ql IIVVV. L/GJll�.11 IIV VV UG�.I III IIIUsI VG glGalGl II 1011 VIItII�QI UC'.l ll 1.
Also please label each concrete flume uniquely on the construction plan.
The slope of concrete flume is now 0.75%. The cross-section of concrete
flume 2 and the slope have changed so that the flow depth is greater than ,
the critical depth. A revised appendix B3 is included in this submittal.
22 Please base culvert design on TxDOT minimum details, or provide a structural
analysis with justification of the proposed box culvert.
The 24" x 15" box culvert design exceeds the minimum TXDOT design
requirements and details for Single Box Culverts, Cast in Place, 0' fill,
Detail SCC-3 & 4. A comparison to a 3' x 2' box for the wall thickness and
rebar spacing is as follows:
Concrete
Design TxDOT Detail
Top Slab Thickness 7"+ 7"
Wall Thickness 8" 7"
Bottom Thickness 8" 7"
Reinforcing Steel
Design TxDOT Detail
Top Slab Thickness Top Material #4@12" #4@13"
Bottom Material #4@6" #4@7"
Transverse Material #4@12" #4@18"
Wall Thickness Top Material #4@10" #4@10"
Bottom Material #4@12" #4@18"
Transverse Material #4@12" #4@18"
Bottom Thickness Top Material #4@7" #4@7"
Bottom Material #4@10" #4@10"
Transverse Material #4@12" #4@18"
This design for a direct travel box culvert has previously been constructed
with a greater span than the 24"span proposed for this box culvert and has
performed well. The box culvert design will support the anticipated loads
for the street.
?c.Please verify and place note on the plan that water services will be left between 2
feet and maximum of 3 feet deep at the point of terminus by developer's contractor.
Also note that a ball valve is required at the point of terminus.
Notes have been added to all of the water construction sheets.
4.Please provide adequate Public Utility easement on Block 1 Lots 9 & 10 in such a
that the
centerline
c the
i:.___ �____ than r r c__� i_ the
�__ t
Way LIIaL thhe centerlIIIC UI LIIC sewer IIIICJ are no close tllall 5.5 feet Lu LM edge of
easement, and that the wyes do not pass the easement.
A 15' PUE is shown on the plat and the plans.
/Zg.Please Note that the existing sewer line on Kate Lane is 6". Please fix the
construction plans & Sewer report reflecting this. Please provide documentation that
the existing 6" line through Buena Vida Subdivision has sufficient Capacity to serve
the increase flow from Equinox Subdivision.
The plans have been corrected to show the sewer line at Kate Lane being
6". A revised sewer report is included in this submittal. The 6" line
through Buena Vida Subdivision is analyzed in the revised report.
A.Please fix the Stationing for Sewer Line S-3. The stationing on profile are not
matching the plan.
The stationing has been fixed for this line.
0.Due to the depth of Sewer Line S-3 & S-2, we would require an additional 5 feet
easement totaling to 15 feet Public Utility Easement on all the lots adjacent to these
sewer lines.
A 15' PUE is added to all lots adjacent to sewer lines
? .Sewer Line 3 from Stationing 3+32 to Stationing 4+50 does not meet B/CS minimum
slope, please provide justification.
Minimum slope for an 8"pipe is 0.55%. Since the outflow pipe is a 6"pipe,
the sewer system in this project will all be 6"pipe
X. Provide a typical layout detail of water meter, cleanout, and transformer. To ensure that
adequate fits within proposed easement when you include other private utilities. Please
confirm with BTU. werf
Due to the wider street an additional 5' was added to the PUE wee necessary. A
detail was added to sheet 2 showing the proposed layout. This detail was sent to
Walter Williams BTU and an email with his approval is attached to this submittal.
The detail is in accordance with BTU's Guidelines.
Y". Please provide Street Sign table. If you have not received block ranges, contact Robin
rkrause(cr�cstx.gov.
A street sign table is included in the plans.
t8(1. Should there not be a streetlight on Towers Parkway and Rock Prairie Road?
A street light has been added at this location.
Please remove ADA crossing ramps for Towers Parkway next to Sophies Lane.
These ADA ramps have been removed from the plans.
On block 3, the finish floor elevation for the lots seems to be the same elevation as the top
of Katie Lane's pavement. We recommend to raise the finish floor elevation by at least 6".
The finished floor of all the lots on this block has been raised 6".
STAFF REVIEW COMMENTS NO. 2
Project: Equinox Subdivision Ph 1 (Fp) (14-00900181)
ENGINEERING COMMENTS NO. 2
1. Sorry for the confusion on the first set of comments. Note 4 on construction sheet
3/16 should say:
PAVEMENT STRUCTURE FOR TOWERS PARKWAY SHALL BE AS FOLLOWS:
6" LIME STABILIZED SUBGRADE OR CEMENT STABILIZED SUBRADE AS
REQUIRED BY SOIL P.I.
5" HMAC BASE OR 8" CRUSHED LIMESTONE BASE MATERIAL
2" HOT MIX ASPHALTIC CONRETE
Please fix and update cost estimate reflecting this.
The note has been corrected and the line item for the cost estimate has
been corrected on an updated engineer's estimate.
2. Please fix culvert details on construction sheet 10/16. The units shown on the cross
section detail are in feet.
The details have been corrected.
3. Confirm that all the flow from Bueda Vida & Williamsgate Phase 1 subdivision have
been taken into account in the Sewer report.
According to the City's GIS there are 95 lots in Bueda Vida and
Williamsgate Phase 1. Manholes EX1 through EX6 have 95 lots taken into
account as shown in the Sewer Report.
4. Define the cross drainage swale between the lots and lead the concentrated flow
under the sidewalk.
Trench drains have been added where the cross drainage swales disperse
water into the streets. A callout has been added to the appropriate street
sheets and the Grading Plan. Also, A trench drain detail has been added to
sheet 5/16. 7 Trench Drains have been added to the revised Engineer's
Estimate
5. Please grade outfall of emergency spillway of the Detention Pond 2 away from
existing homes.
The emergency spillway has been moved so that the outfall is directed
away from the existing homes.
6. Appendix B3 for Addendum to Drainage Report is showing the concrete flume slope
as 75%. The slope typo seem to have no effect to the ith-year storm calculations. Is
this cell not linked to the flow calculation? Please double check and fix.
The typo has been fixed. It did not affect the calculation because the typo
is only in the summary. The Channel Report shows the full calculations.
7. Double check engineering estimate for street construction items. Subtotal do not
match on page 1 and 4.
The Engineer's Estimate has been updated.
ENGINEERING COMMENTS NO. 1
1. Please show the proposed PUE line and waterline that is going through the lot, and ensure that
the portable building is not in the PUE and is at least 20 feet away from the waterline.
The proposed PUE line and waterline is currently being redesigned away from this area,
therefore no easement will exist in this area.
FIRE
1. I couldn't tell if the Portable was covered by a Fire Hydrant.
Existing fire hydrants have been located. Please see attached revised sheet A1.11.
SANITATION
1. Sanitation is ok with this project.
No response required at this time.
If further information is required to address the above listed comments please do not hesitate to
contact the office.
Thank you,
Ben Lamons
Enc: A1.11