Loading...
HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT PERMIT NO. 14-171 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CrrYOFCOLLEGES rArION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE i,.mn;�e�r�lupnnwr Sr.c:n SITE LEGAL DESCRIPTION: SITE ADDRESS: A005401, R Stevenson (ICL) 2716 & 2670 Barron Rd Tract 82 and 100 DRAINAGE BASIN: Barron Crest Subdivision Spring Creek DATE OF ISSUE: 10/28/2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Blake Cathey PO BHox 9517 College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: r/ eY , the Contractor, hereby agree to comply with all conditions herein. _-- /0/-7// 1` Con --ctor Signature Date c27 . 1 - -r6,1 b( ea C�a _ Phone number E-mail ++// 777 -02 the Public Works I hereby grant this permit for development. Contact KPr�� Tihkr r gl Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. fi la_2 k -lout Ci gi er/Representative Date N-...,„11 DEVELOPMENT PERMIT tip,_ PERMIT NO. 14-171 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA OF COLLEGE STATION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A005401, R Stevenson (ICL) 2716 & 2670 Barron Rd Tract 82 and 100 DRAINAGE BASIN: Barron Crest Subdivision Spring Creek DATE OF ISSUE: 10/28/2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Blake Cathey PO BHox 9517 College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: l , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact kP� (1 T111641( 777 -O29Z , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. Ci (gine r/Representative Date DEVELOPMENT PERMIT PERMIT NO. 14-171 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA c:rrvoFcui.t,rcrSIM ION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE i';e•,x;„c t4ieiar<rn,Lauri SITE LEGAL DESCRIPTION: SITE ADDRESS: A005401, R Stevenson (ICL) 2716 & 2670 Barron Rd Tract 82 and 100 DRAINAGE BASIN: Barron Crest Subdivision Phase 1 Spring Creek DATE OF ISSUE: 09-12-2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Blake Cathey PO Box 9517 College Station, TX 77845 TYPE OF DEVELOPMENT: Clearing and Grading Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: Clearing and Grading Permit ONLY for ROW portion of property. I,%vJ ��' 'S/✓L�t� c,_ ' ; the Contractor, hereby agree to comply with all conditions herein. Cont act Signature Date , Phone number 1� E-mail I hereby grant this permit for development. Contact KQt+h 1 iher 777- 0292 , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. 9-)2 - 2o14 City En neer/Representative Date DEVELOPMENT PERMIT PERMIT NO. 14-171 .t vir4 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA COFCOLULESIAIION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A005401, R Stevenson (ICL) 2716 & 2670 Barron Rd Tract 82 and 100 DRAINAGE BASIN: Barron Crest Subdivision Phase 1 Spring Creek DATE OF ISSUE: 09-12-2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Blake Cathey PO Box 9517 College Station, TX 77845 TYPE OF DEVELOPMENT: Clearing and Grading Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: Clearing and Grading Permit ONLY for ROW portion of property. 0 J ,J5 c,__ the Contractor, hereby agree to comply with all conditions herein. .I66 7/-1- 7- Co act Signature Date 7 ? ky 6 7 I 3 ,_,. . Ca (-',‹ rosi--4/6 -----p/ z__ Phone number E-mail I hereby grant this permit for development. Contact .KQ1+h -r,..he 777- 029 2 the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. • s» - 9-)2 - 2614 City En n er/Representative Date ' DEVELOPMENT PERMIT PERMIT NO. 14-171 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CrnOFning ec,FsrAflrpt n»,�n,Sem,;.,,,,,,.s� rRE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A005401, R Stevenson (ICL) 2716 & 2670 Barron Rd Tract 82 and 100 DRAINAGE BASIN: Barron Crest Subdivision Phase 1 Spring Creek DATE OF ISSUE: 09-12-2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Blake Cathey PO Box 9517 College Station, TX 77845 TYPE OF DEVELOPMENT: Clearing and Grading Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: Clearing and Grading Permit ONLY for ROW portion of property. , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact k+ J1 T;$41<ev 777- 0292 , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. 9-)2 - 2014 City En neer/Representative Date