Loading...
HomeMy WebLinkAboutEstimate SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Castlegate II Subdivision- Section 105 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity General Items 1 Mobilization,Overhead and Construction Staking LS 1 $ 7,500.00 $ 7,500.00 2 Topsoil Removal and Replacement,complete in place LS 1 $ 6,000.00 $ 6,000.00 3 Install End of Street Signs,complete in place EA 9 $ 150.00 $ 1,350.00 4 Street Name Signs,complete in place EA 3 $ 350.00 $ 1,400.00 5 Stop Signs,complete in place EA 3 $ 400.00 $ 1,600.00 6 Pavement Striping and Markings,complete in place LS 1 $ 4,500.00 $ 5,000.00 7 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt LS l $ 2,500.00 $ 2,500.00 Fence,Construction Exit,Rock Filter Dam,etc.,complete in place 8 Hydroseed and Hydromulch,complete in place SY 3,300 $ 0.50 $ 1,650.00 General Items Subtotal $ 27,000.00 Street Construction Items Concrete Pavement 9 Excavation&Grading,complete in place LS 1 $ 17,500.00 $ 17,500.00 10 Mixing&incorporation of lime,6"deep,complete in place SY 4,400 $ 2.30 $ 10,120.00 11 Mixing&incorporation of lime,8"deep,complete in place SY 2,730 $ 2.90 $ 7,917.00 12 Hydrated Lime,complete in place(27 Ib/sy for 6"deep&36 Ib/sy for 8"deep) Ton 110 $ 180.00 $ 19,800.00 13 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,446 $ 32.00 $ 110,272.00 14 7"Reinforced Concrete Pavement w/Curb,complete in place SY 2,406 $ 35.00 $ 84,210.00 15 Reinforced Concrete Pavement-Aprons-6"Thick w/Monolithic Standard Curb, SF 4,390 $ 4.50 $ 19,755.00 complete in place 16 Concrete Sidewalk&Ramps-4"thick,complete in place&WS Phillips SF 13,230 $ 3.60 $ 47,628.00 Sidewalk 17 ADA Ramps-Detectable Warning Surfaces,complete in place EA 12 $ 500.00 $ 6,000.00 Street Construction Concrete Pavement Items Subtotal $ 323,202.00 Page 1 of 3 Castlegate II Subdivision - Section 105 Engineer's Estimate of Construction Item Description Estimated P Unit Unit Price Total Quantity Storm Sewer Construction Items 18 36"RCP Pipe,complete in place-Structural Backfill,complete in place LF 403 $ 80.00 $ 32,240.00 19 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 360 $ 65.00 $ 23,400.00 20 24"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 210 $ 50.00 $ 10,500.00 21 18"RCP Pipe,complete in place-Structural Backfill,complete in place LF 146 $ 40.00 $ 5,840.00 22 Curb Inlet- 10'wide,complete in place EA 6 $ 3,500.00 $ 21,000.00 23 Curb Inlet-5'wide,complete in place EA 2 $ 2,500.00 $ 5,000.00 24 4'x4'Junction Box,complete in place EA 2 $ 3,000.00 $ 6,000.00 25 TV Testing and Inspection,complete in place LF 1,119 $ 2.00 $ 2,238.00 Storm Sewer Construction Items Subtotal $ 106,218.00 Water Construction Items 26 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 170 $ 28.00 $ 4,760.00 27 8"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 409 $ 23.00 $ 9,407.00 28 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 214 $ 28.00 $ 5,992.00 29 6"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 1099 $ 23.00 $ 25,277.00 29 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 40 $ 28.00 $ 1,120.00 30 Connect to Existing 8"Water Line EA 1 $ 1,000.00 $ 1,000.00 31 Connect to Existing 6" Water Line EA 2 $ 1,000.00 $ 2,000.00 32 Fire Hydrant Assembly(w/valve,vert.extension),complete in place EA 4 $ 3,500.00 $ 14,000.00 33 6"x 6"M.J.Tee,complete in place EA 4 $ 500.00 $ 2,000.00 34 8"x 8"M.J.Cross,complete in place EA 2 $ 600.00 $ 1,200.00 35 8"x 6"M.J.Reducer,complete in place EA 4 $ 400.00 $ 1,600.00 36 6"x 4"M.J.Reducer,complete in place EA 2 $ 400.00 $ 800.00 37 8"x 45°M.J.Bend,complete in place EA 4 $ 400.00 $ 1,600.00 38 6"x 45°M.J.Bend,complete in place EA 8 $ 350.00 $ 2,800.00 39 8"M.J.Gate Valve,complete in place EA 3 $ 1,050.00 $ 3,150.00 40 6"M.J.Gate Valve,complete in place EA 4 $ 850.00 $ 3,400.00 41 4"M.J.Gate Valve,complete in place EA 2 $ 600.00 $ 1,200.00 42 1" Water Service,< 15 ft(avg length=2 ft)(6"Line) EA 4 $ 650.00 $ 2,600.00 43 1" Water Service,< 15 ft(avg length=2 ft)(4"Line) EA 2 $ 650.00 $ 1,300.00 44 1" Water Service,> 15 ft(avg length=48 ft)(6"Line) EA 8 $ 1,000.00 $ 8,000.00 45 I" Water Service,> 15 ft(avg length=48 ft)(4"Line) EA 2 $ 1,000.00 $ 2,000.00 46 1.5"Water Service,< 15 ft(avg length=2 ft)(6"Line) EA 8 $ 800.00 $ 6,400.00 47 1.5" Water Service,> 15 ft(avg length=48 ft)(6"Line) EA 6 $ 1,200.00 $ 7,200.00 48 2"Blowoff Assembly,complete in place EA 3 $ 1,000.00 $ 3,000.00 Water Construction Items Subtotal $ 111,806.00 Page 2 of 3 Castlegate II Subdivision- Section 105 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity Sanitary Sewer Construction Items 49 6"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 134 $ 21.00 $ 2,814.00 50 6" PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 58 $ 17.00 $ 986.00 51 6"PVC Sewer Line-ASTM D-2241 -Structural Backfill,complete in place LF 20 $ 24.00 $ 480.00 52 8"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 1,127 $ 24.00 $ 27,048.00 53 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 56 $ 20.00 $ 1,120.00 54 8"PVC Sewer Line-ASTM D-2241 -Non-Structural Backfill,complete in place LF 20 $ 26.00 $ 520.00 55 6"PVC Cap,complete in place EA I $ 100.00 $ 100.00 56 8"PVC Cap,complete in place EA 1 $ 100.00 $ 100.00 57 4"Sewer Service-Double(avg length=4 ft),complete in place EA 12 $ 400.00 $ 4,800.00 58 4" Sewer Service-Double(avg length=48 ft),complete in place EA 12 $ 950.00 $ 11,400.00 59 Tie-In to Existing Manhole,complete in place EA 2 $ 3,000.00 $ 6,000.00 60 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,800.00 $ 11,200.00 61 TV Testing and Inspection,complete in place LF 1,415 $ 2.00 $ 2,830.00 Sanitary Sewer Construction Items Subtotal $ 69,398.00 General Items Subtotal $ 27,000.00 Street Construction Concrete Pavement Items Subtotal $ 323,202.00 Storm Sewer Construction Items Subtotal $ 106,218.00 Water Construction Items Subtotal $ 111,806.00 Sanitary Sewer Construction Items Subtotal $ 69,398.00 TOTAL CONSTRUCTION $ 637,624.00 ;APIS'siFif "...*****6\ .1.111�. JOSEPH P. SCHULTZ 6588 A ; SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Castlegate 1I Subdivision - Section 105 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity General Items 1 Mobilization,Overhead and Construction Staking LS 1 $ 7,500.00 $ 7,500.00 2 Topsoil Removal and Replacement,complete in place LS 1 $ 6,000.00 $ 6,000.00 3 Install End of Street Signs,complete in place EA 9 $ 150.00 $ 1,350.00 4 Street Name Signs,complete in place EA 3 $ 350.00 $ 1,400.00 5 Stop Signs,complete in place EA 3 $ 400.00 $ 1,600.00 6 Pavement Striping and Markings,complete in place LS l $ 4,500.00 $ 5,000.00 7 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt LS 1 $ 2,500.00 $ 2,500.00 Fence,Construction Exit,Rock Filter Dam,etc.,complete in place 8 Hydroseed and Hydromulch,complete in place SY 3,300 $ 0.50 $ 1,650.00 General Items Subtotal $ 27,000.00 Street Construction Items Concrete Pavement 9 Excavation&Grading,complete in place LS 1 $ 17,500.00 $ 17,500.00 10 Mixing&incorporation of lime,6"deep,complete in place SY 4,400 $ 2.30 $ 10,120.00 11 Mixing&incorporation of lime,8"deep,complete in place SY 2,730 $ 2.90 $ 7,917.00 12 Hydrated Lime,complete in place(27 Ib/sy for 6"deep&361b/sy for 8"deep) Ton 110 $ 180.00 $ 19,800.00 13 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,446 $ 32.00 $ 110,272.00 14 7"Reinforced Concrete Pavement w/Curb,complete in place SY 2,406 $ 35.00 $ 84,210.00 15 Reinforced Concrete Pavement-Aprons-6"Thick w/Monolithic Standard Curb, SF 4,390 $ 4.50 $ 19,755.00 complete in place 16 Concrete Sidewalk&Ramps-4"thick,complete in place&WS Phillips SF 13,230 $ 3.60 $ 47,628.00 Sidewalk 17 ADA Ramps-Detectable Warning Surfaces,complete in place EA 12 $ 500.00 $ 6.000.00 Street Construction Concrete Pavement Items Subtotal $ 323,202.00 Page 1 of 3 Castlegate II Subdivision- Section 105 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity Storm Sewer Construction Items 18 36"RCP Pipe,complete in place-Structural Backfill,complete in place LF 393 $ 80.00 $ 31,440.00 19 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 270 $ 65.00 $ 17,550.00 20 24" RCP Pipe,complete in place-Structural Backfill,complete in place LF 90 $ 55.00 $ 4,950.00 21 24"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 210 $ 50.00 $ 10,500.00 22 18"RCP Pipe,complete in place-Structural Backfill,complete in place LF 146 $ 40.00 $ 5,840.00 23 Curb Inlet- 10'wide,complete in place EA 6 $ 3,500.00 $ 21,000.00 24 Curb Inlet-5'wide,complete in place EA 2 $ 2,500.00 $ 5,000.00 25 4'x4'Junction Box,complete in place EA 2 $ 3,000.00 $ 6,000.00 26 TV Testing and Inspection,complete in place LF 1,109 $ 2.00 $ 2,218.00 Storm Sewer Construction Items Subtotal $ 104,498.00 Water Construction Items 27 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 170 $ 28.00 $ 4,760.00 28 8"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 398 $ 23.00 $ 9,154.00 29 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 214 $ 28.00 $ 5,992.00 30 6"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 1094 $ 23.00 $ 25,162.00 30 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 40 $ 28.00 $ 1,120.00 31 Connect to Existing 8" Water Line EA 1 $ 1,000.00 $ 1,000.00 32 Connect to Existing 6"Water Line EA 2 $ 1,000.00 $ 2,000.00 33 Fire Hydrant Assembly(w/valve,vert.extension),complete in place EA 4 $ 3,500.00 $ 14,000.00 34 6"x 6"M.J.Tee,complete in place EA 4 $ 500.00 $ 2,000.00 35 8"x 8"M.J.Cross,complete in place EA 2 $ 600.00 $ 1,200.00 36 8"x 6" M.J.Reducer,complete in place EA 4 $ 400.00 $ 1,600.00 37 6"x 4"M.J.Reducer,complete in place EA 2 $ 400.00 $ 800.00 38 8"M.J.Gate Valve,complete in place EA 2 $ 1,050.00 $ 2,100.00 39 6"M.J.Gate Valve,complete in place EA 4 $ 850.00 $ 3,400.00 40 4"M.J.Gate Valve,complete in place EA 2 $ 600.00 $ 1,200.00 41 1" Water Service,< 15 ft(avg length=2 ft)(6"Line) EA 4 $ 650.00 $ 2,600.00 42 1" Water Service,< 15 ft(avg length=2 ft)(4" Line) EA 2 $ 650.00 $ 1,300.00 43 1"Water Service,> 15 ft(avg length=48 ft)(6"Line) EA 8 $ 1,000.00 $ 8,000.00 44 1" Water Service,> 15 ft(avg length=48 ft)(4"Line) EA 2 $ 1,000.00 $ 2,000.00 45 1.5" Water Service,< 15 ft(avg length=2 ft)(6"Line) EA 8 $ 800.00 $ 6,400.00 46 1.5" Water Service,> 15 ft(avg length=48 ft)(6" Line) EA 6 $ 1,200.00 $ 7,200.00 47 2"Blowoff Assembly,complete in place EA 3 $ 1.000.00 $ 3,000.00 Water Construction Items Subtotal $ 105,988.00 Page 2 of 3 Castlegate II Subdivision - Section 105 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity Sanitary Sewer Construction Items 48 6" PVC Sewer Line-D3034-Structural Backfill,complete in place LF 134 $ 21.00 $ 2.814.00 49 6" PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 58 $ 17.00 $ 986.00 50 6"PVC Sewer Line-ASTM D-2241 -Structural Backfill,complete in place LF 20 $ 24.00 $ 480.00 51 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 1,127 $ 24.00 $ 27,048.00 52 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 56 $ 20.00 $ 1,120.00 53 8"PVC Sewer Line-ASTM D-2241 -Non-Structural Backfill,complete in place LF 20 $ 26.00 $ 520.00 54 6"PVC Cap,complete in place EA I $ 100.00 $ 100.00 55 8"PVC Cap,complete in place EA 1 $ 100.00 $ 100.00 56 4"Sewer Service-Double(avg length=4 ft),complete in place EA 12 $ 400.00 $ 4,800.00 57 4"Sewer Service-Double(avg length=48 ft),complete in place EA 12 $ 950.00 $ 11,400.00 58 Tie-In to Existing Manhole,complete in place EA 2 $ 3,000.00 $ 6,000.00 59 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,800.00 $ 11,200.00 60 TV Testing and Inspection,complete in place LF 1,415 $ 2.00 $ 2,830.00 Sanitary Sewer Construction Items Subtotal $ 69,398.00 General Items Subtotal $ 27,000.00 Street Construction Concrete Pavement Items Subtotal $ 323,202.00 Storm Sewer Construction Items Subtotal $ 104,498.00 Water Construction Items Subtotal $ 105,988.00 Sanitary Sewer Construction Items Subtotal $ 69,398.00 TOTAL CONSTRUCTION $ 630,086.00 OF r .i * ni JOSEPH P. SCHULTZ • ,\ 6588' eftto 17� / 1 F-12327 r( 0 4 �( SCHULTZ ENGINEERING. LLC. Page 3 of 3