HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT
i� PERMIT NO. 14-167
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
CITY orCOLLEGE 5r TION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
The Barracks II Subdivision Phase 400 Intersection of Deacon Drive and General Pkwy
DRAINAGE BASIN:
Bee Creek Trib. "B"
DATE OF ISSUE: 09/11/2014 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Heath Phillips Investments, LLC
P.O. Box 262
Wellborn, TX 77881
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
, the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature Date
Phone number E-mail
I hereby grant this permit for development. Contact Ts rev' Kpik 777' 447I , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
-1!- 20!4'
City Engi ee R resentative Date
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Barracks II Subdivision Phase 400
Engineer's Estimate of Sidewalk Improvements Construction
Item Description Unit Estimated Unit Price Total
Quantity
General Items
1 Mobilization,Overhead and Construction Staking LS 1 $ 2,500.00 $ 2,500.00
2 Excavation&Grading,complete in place LS 1 $ 2,000.00 $ 2,000.00
3 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,
etc.,complete in place LS 1 $ 1,500.00 $ 1,500.00
4 Hydroseed and Hydromulch,complete in place SY 1,750 $ 0.60 $ 1,050.00
General Items Subtotal $ 7,050.00
Sidewalk Construction Items Concrete Pavement
5 Concrete Sidewalk&Ramps-4"thick,complete in place SF 2,005 $ 4.20 $ 8,421.00
Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00
General Items Subtotal $ 7,050.00
Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00
TOTAL CONSTRUCTION $ 15,471.00
ti\
JOSEPH P. SCHULTZ
WWI +666
65889
fir, ,
1
F-12327 Sr 27`"
�0
SCHULTZ ENGINEERING, LLC.
Page 1 of 1
(4.r.frDEVELOPMENT PERMIT
PERMIT NO. 14-167
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
CIY ccrr.LrArOrr RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
7'i.rxins Gflnxlcfinrni&nca
SITE LEGAL DESCRIPTION: SITE ADDRESS:
The Barracks II Subdivision Phase 400 Intersection of Deacon Drive and General Pkwy
DRAINAGE BASIN:
Bee Creek Trib. "B"
DATE OF ISSUE: 09/11/2014 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Heath Phillips Investments, LLC
P.O. Box 262
Wellborn, TX 77881
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
z„./., /65-- , the Contractor, hereby agree to comply with all conditions herein.
_ ft, /7 /*
'.ntractor Signature Date
Phone number E-mail
I hereby grant this permit for development. Contact Ts r4 p( kpik 777 1071 , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
.201
City Engi ee Re resentative Date
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Barracks II Subdivision Phase 400
Engineer's Estimate of Sidewalk Improvements Construction
Item Description Unit Estimated Unit Price Total
Quantity
General Items
Mobilization,Overhead and Construction Staking LS I $ 2,500.00 $ 2,500.00
2 Excavation&Grading,complete in place LS 1 $ 2,000.00 $ 2,000.00
3 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,
etc.,complete in place LS 1 $ 1,500.00 $ 1,500.00
4 Hydroseed and Hydromulch,complete in place SY 1,750 $ 0.60 $ 1,050.00
General Items Subtotal $ 7,050.00
Sidewalk Construction Items Concrete Pavement
5 Concrete Sidewalk&Ramps-4"thick,complete in place SF 2,005 $ 4.20 $ 8,421.00
Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00
General Items Subtotal $ 7,050.00
Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00
TOTAL CONSTRUCTION $ 15,471.00
It OF
*
JOSEPH P. SCHULTZ
65889
/ F-12327 2`5
SCHULTZ ENGINEERING, LLC.
Page 1 of 1