HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT i� PERMIT NO. 14-167 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CITY orCOLLEGE 5r TION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: The Barracks II Subdivision Phase 400 Intersection of Deacon Drive and General Pkwy DRAINAGE BASIN: Bee Creek Trib. "B" DATE OF ISSUE: 09/11/2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Heath Phillips Investments, LLC P.O. Box 262 Wellborn, TX 77881 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact Ts rev' Kpik 777' 447I , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. -1!- 20!4' City Engi ee R resentative Date SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Barracks II Subdivision Phase 400 Engineer's Estimate of Sidewalk Improvements Construction Item Description Unit Estimated Unit Price Total Quantity General Items 1 Mobilization,Overhead and Construction Staking LS 1 $ 2,500.00 $ 2,500.00 2 Excavation&Grading,complete in place LS 1 $ 2,000.00 $ 2,000.00 3 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence, etc.,complete in place LS 1 $ 1,500.00 $ 1,500.00 4 Hydroseed and Hydromulch,complete in place SY 1,750 $ 0.60 $ 1,050.00 General Items Subtotal $ 7,050.00 Sidewalk Construction Items Concrete Pavement 5 Concrete Sidewalk&Ramps-4"thick,complete in place SF 2,005 $ 4.20 $ 8,421.00 Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00 General Items Subtotal $ 7,050.00 Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00 TOTAL CONSTRUCTION $ 15,471.00 ti\ JOSEPH P. SCHULTZ WWI +666 65889 fir, , 1 F-12327 Sr 27`" �0 SCHULTZ ENGINEERING, LLC. Page 1 of 1 (4.r.frDEVELOPMENT PERMIT PERMIT NO. 14-167 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CIY ccrr.LrArOrr RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE 7'i.rxins Gflnxlcfinrni&nca SITE LEGAL DESCRIPTION: SITE ADDRESS: The Barracks II Subdivision Phase 400 Intersection of Deacon Drive and General Pkwy DRAINAGE BASIN: Bee Creek Trib. "B" DATE OF ISSUE: 09/11/2014 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Heath Phillips Investments, LLC P.O. Box 262 Wellborn, TX 77881 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: z„./., /65-- , the Contractor, hereby agree to comply with all conditions herein. _ ft, /7 /* '.ntractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact Ts r4 p( kpik 777 1071 , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. .201 City Engi ee Re resentative Date SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Barracks II Subdivision Phase 400 Engineer's Estimate of Sidewalk Improvements Construction Item Description Unit Estimated Unit Price Total Quantity General Items Mobilization,Overhead and Construction Staking LS I $ 2,500.00 $ 2,500.00 2 Excavation&Grading,complete in place LS 1 $ 2,000.00 $ 2,000.00 3 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence, etc.,complete in place LS 1 $ 1,500.00 $ 1,500.00 4 Hydroseed and Hydromulch,complete in place SY 1,750 $ 0.60 $ 1,050.00 General Items Subtotal $ 7,050.00 Sidewalk Construction Items Concrete Pavement 5 Concrete Sidewalk&Ramps-4"thick,complete in place SF 2,005 $ 4.20 $ 8,421.00 Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00 General Items Subtotal $ 7,050.00 Sidewalk Construction Items Concrete Pavement Subtotal $ 8,421.00 TOTAL CONSTRUCTION $ 15,471.00 It OF * JOSEPH P. SCHULTZ 65889 / F-12327 2`5 SCHULTZ ENGINEERING, LLC. Page 1 of 1