Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COI I.FGE STATION Home of Texas A&M University" MEMORANDUM DATE: July 16, 2014 TO: Heath Phillips, via; heath su•eriorstructures • ahoo.com FROM: Jerry Cuaron, Staff Planner SUBJECT: THE BARRACKS II PH 400 (FP) Thank you for the submittal of your Final Plat - Commercial application. Danielle Singh, Transportation Planning Coordinator, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Wednesday, July 30, 2014. If you have questions in the meantime, please feel free to contact us. PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84averizon.net P&DS Project No. 14-00900167 -PLCC"Ii2. --k-MaCT Planning eq.Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 CITY OF COLLEGE STATION Home ofTexasA6M University' MEMORANDUM DATE: July 31, 2014 TO: Heath Phillips, via; heath superiorstructures(a7yahoo.com FROM: Jerry Cuaron, Staff Planner SUBJECT: THE BARRACKS II PH 400 (FP) Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; One (1) 24"x36" grading and erosion control plan; Thirteen (13) 11"x17" copies of the revised final plat One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal(a�cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will riot be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84Ca verizon.net P&DS Project No. 14-00900167 Attachments: Staff Review Comments Planning 6 Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: The Barracks II Ph 400 (FP) (14-00900167) PLANNING 1. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 2. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Jerry Cuaron Date: 7-29-14 ENGINEERING COMMENTS NO. 1 1. Please fix the scale reference on plat. Scale reference seems to be 1:50 instead of the displayed 1:40. 2. North Arrows of the Plat & Vicinity Map are not pointing in the right direction. 3. Please provide a city's horizontal control monument tied to one of the lot corners. 4. FYI if infrastructure associated with site plan is dependent on utilities being constructed with Phase 108 timing will need to be coordinated. 5. Was it intentional to put 20' Public Utility Easement on top of existing easement? Reviewed by: Kevin Ferrer Date: July 21, 2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 21, 2014