McCLURE & BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Dr.,Suite 103 College Station,Tx.77845•(979)693-3838 Engineer Reg.No.F-458 Survey Reg.No.101033-00 November 6, 2014 Mr. Alan Gibbs, PE City Engineer City of College Station College Station, Texas 77840 Re: Pebble Creek Phase 7D — Oversize Participation Request Dear Alan: I have analyzed the proposed water system for the Pebble Creek Phase 7D Subdivision considering only the flows generated from this property. This analysis has been performed in order to determine the required pipe sizes to serve only this development without offsite contributions. The data generated from this analysis can be used to justify that an 8" line along Royal Adelade and Pebble Creek Parkway is the size that is required to serve this development. The cost difference between the 8" and 12" water line is the cost shown on the attached estimate. As shown in Exhibit A, the 8" line provides adequate flow and pressure for this development. A copy of the water model with the 12" line is included in Exhibit B, and a copy of the Engineer's Estimate for the difference between the two lines is included in Exhibit C. If you need additional information, please contact me at your convenience. Sinc-rely, . Robertson, P.E. F..1.(4,"11 ce President — Engineering r `. ' �•• f l b t<2' * �r JEEF�R'( L. rP.03EF(TSb,V i Pr ,c'• • , ?4i45 : F:\1065-Davis Young\0019-Pebble Creek Phase 7D\Docs\OP Request\CoCS-Gibbsol -OP Justification.doc PEBBLE CREEK PHASE 7D & PEBBLE CREEK PARKWAY MBESI PROJ#: 1065-0019 OVERSIZE PARTICIPATION ESTIMATE October 14, 2014 Item# Description Unit Quantity Unit Price Total 8" Water System Construction 1 12"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 0 46.00 0 2 12"PVC, C909 Cl 200, Water Line, Non-Str. Backfill L.F. 0 43.00 0 3 8" PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 4,519, 38.00 171,722 4 8"PVC, C909 Cl 200, Water Line,Non-Str. Backfill L.F. 2,099 35.00 73,465 5 6"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 738 30.00 22,140 6 4"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 313 22.50 7,043 7 Fire Hydrant Assembly EACH 5 3,800.00 19,000 8 12"x12"M.J. Tee EACH 0 600.00 0 9 12"x8"M.J. Tee EACH 0 500.00 0 10 8"x8"M.J. Tee EACH 6 475.00 2,850 11 8"x6"M.J. Tee EACH 3 400.00 1,200 12 8"x4"M.J. Tee EACH 1 350.00 350 13 12" Gate Valve EACH 0 3,035.00 0 14 12"x8"Reducer EACH 0 500.00 0 15 8"M.J. Gate Valve EACH 13 1,250.00 16,250 16 6"M.J. Gate Valve EACH 3 950.00 2,850 17 12"x13"M.J. Anchor Coupling EACH 0 300.00 0 18 8"x13"M.J. Anchor Coupling EACH 15 250.00 3,750 19 6"x13"M.J. Anchor Coupling EACH 8 250.00 2,000 20 12"x45 deg. Bend EACH 0 250.00 0 21 8"x22.5 deg. Bend EACH 4 250.00 1,000 22 8"x11.25 deg. Bend EACH 1 250.00 250 23 6"x45 deg. Bend EACH 1 250.00 250 23 6"x22.5 deg. Bend EACH 1 250.00 250 24 6"x11.25 deg. Bend EACH 1 250.00 250 23 2"Blow Off Valve Assembly EACH 1 1,100.00 1,100 24 Connect to Existing Waterline EACH 3 1,100.00 3,300 25 Water Service, 1"Type K Copper Short Side(<20') EACH 1 800.00 800 26 Water Service, 1.5" Type K Copper Short Side(<20') EACH 17 950.00 16,150 27 Water Service, 1"Type K Copper Short Side(>20') EACH 1 1,250.00 1,250 28 Water Service, 1.5"Type K Copper Short Side(>20') EACH 20 1,450.00 29,000 8" Water System Subtotal $376,220 TOTAL CONSTRUCTION COST $43,120 BONDING COSTS $4,750 TOTAL OP REQUEST $47,870 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier 'mac -"q i c: NI �-.r A rt'`.:"0-,k. i! i, L4;,,_ 1K) ,04f rJEEFFERY L. h;;SrRTSO;N J: e i . Robertson, P.E. Date r r PI .: 94 7 ,5 ._ s � 2 of 2 •••���..-`-- & • McCLURE & BROWNE ENGINEERING/SURVEYING, INC. p 1008 Woodcreek Dr.,Suite 103•College Station,Tx.77845 (979)693-3838 Engineer Reg.No.F-458 Survey Reg.No.101033-00 EXHIBIT A 8" Water Line Fire Flow Model F:\1065-Davis Young\0019-Pebble Creek Phase 7D\Docs\OP Request\CoCS-Gibbs01 -OP Justification.doc Exhibit A 8" Pipe Fire Flow * * * * * * * * * * KYPI P E 5 * * * * * * * * * * * * * Pipe Network Modeling Software * * * Copyrighted by KYPIPE LLC * * Version 5 - February 2010 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Mon Nov 10 15:57:48 2014 Master File : f:\1065 - davis young\0019 - pebble creek phase 7d\docs\op request\10650019-fire 8- inch.KYP\10650019-fire 8-inch.P2K ************************************************ SUMMARY OF O R I G I NAL DATA ************************************************ UNITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig PIPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N AME #1 #2 (ft) (in) COEFF. LOSS COEFF. P-1 J-21 J-19 135.54 8.00 140.0000 0.00 P-2 J-21 J-22 148.79 4.00 140.0000 0.00 P-3 J-19 J-18 144.81 8.00 140.0000 0.00 P-4 J-19 J-20 317.67 8.00 140.0000 0.00 P-5 J-18 J-17 496.99 8.00 140.0000 0.00 P-6 J-20 J-18 452.72 6.00 140.0000 0.00 P-7 J-20 J-16 152.23 8.00 140.0000 0.00 P-8 J-16 J-6 295.10 8.00 140.0000 0.00 2-9 J-17 J-16 317.11 8.00 140.0000 0.00 P-10 J-17 J-1 163.21 8.00 140.0000 0.00 P-11 J-1 VP-3 1867.79 8.00 140.0000 0.00 P-20 VP-2 J-5 348.00 8.00 135.9163 0.00 P-21 J-5 J-13 264.00 8.00 140.0000 0.00 P-22 J-7 J-6 78.00 8.00 140.0000 0.00 P-23 J-7 J-8 467.00 8.00 140.0000 0.00 P-24 J-8 J-9 275.00 4.00 140.0000 0.00 P-25 J-8 J-10 356.00 8.00 140.0000 0.00 P-26 J-10 J-11 201.00 4.00 140.0000 0.00 P-27 J-10 J-21 229.00 8.00 140.0000 0.00 P-28 J-13 J-7 435.00 8.00 140.0000 0.00 P-29 J-13 J-14 445.00 8.00 140.0000 0.00 P-30 J-5 J-15 515.00 4.00 140.0000 0.00 PUMP/LOSS ELEMENT DATA THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (8) 287.22 0.00 75.00 184.15 1250.00 75.00 -84.84 2500.00 75.00 THERE IS A DEVICE AT NODE VP-3 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (%) 279.23 0.00 75.00 186.92 1500.00 75.00 -54.00 3000.00 75.00 N ODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) J-1 6.00 250.00 J-5 2.25 232.00 J-6 3.50 222.00 J-7 3.75 224.00 J-8 6.75 242.00 J-9 3.75 238.00 J-10 0.00 246.00 J-11 4.50 246.00 J-13 0.00 234.00 J-14 4.50 220.00 J-15 6.75 228.00 J-16 36.00 228.00 J-17 13.50 248.00 J-18 21.00 248.00 J-19 6.00 246.00 J-20 15.00 242.00 J-21 1003.00 248.00 J-22 12.00 248.00 VP-2 ---- 230.00 230.00 VP-3 ---- 258.00 258.00 O UTPUT OPTION DATA OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 5 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 SYSTEM CONFIGURATION NUMBER OF PIPES (p) = 22 NUMBER OF END NODES (j) = 18 NUMBER OF PRIMARY LOOPS (1) = 3 NUMBER OF SUPPLY NODES (f) = 2 NUMBER OF SUPPLY ZONES (z) = 1 Case: 0 RESULTS OBTAINED AFTER 5 TRIALS: ACCURACY = 0.00000 S IMULATION DESCRIPTION (LAB E L) P IPELINE RESULTS STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N AME #1 #2 LOSS LOSS VELO. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) P-1 J-19 J-21 693.97 1.10 0.00 4.43 8.10 8.10 P-2 J-21 J-22 12.00 0.02 0.00 0.31 0.13 0.13 P-3 J-18 J-19 394.08 0.41 0.00 2.52 2.84 2.84 P-4 J-20 J-19 305.90 0.56 0.00 1.95 1.78 1.78 P-5 J-17 J-18 356.46 1.17 0.00 2.28 2.36 2.36 P-6 J-20 J-18 58.62 0.15 0.00 0.67 0.34 0.34 P-7 J-16 J-20 379.52 0.40 0.00 2.42 2.65 2.65 P-8 J-6 J-16 94.56 0.06 0.00 0.60 0.20 0.20 P-9 J-17 J-16 320.95 0.62 0.00 2.05 1.94 1.94 P-10 J-1 J-17 690.91 1.31 0.00 4.41 8.03 8.03 P-11 VP-3 J-1 696.91 15.24 0.00 4.45 8.16 8.16 P-20 VP-2 J-5 451.34 1.34 0.00 2.88 3.86 3.86 P-21 J-5 J-13 442.34 0.93 0.00 2.82 3.52 3.52 P-22 J-7 J-6 98.06 0.02 0.00 0.63 0.22 0.22 P-23 J-7 J-8 336.03 0.99 0.00 2.14 2.11 2.11 P-24 J-8 J-9 3.75 0.00 0.00 0.10 0.01 0.01 P-25 J-8 J-10 325.53 0.71 0.00 2.08 1.99 1.99 P-26 J-10 J-11 4.50 0.00 0.00 0.11 0.02 0.02 P-27 J-10 J-21 321.03 0.44 0.00 2.05 1.94 1.94 P-28 J-13 J-7 437.84 1.50 0.00 2.79 3.45 3.45 P-29 J-13 J-14 4.50 0.00 0.00 0.03 0.00 0.00 P-30 J-5 J-15 6.75 0.02 0.00 0.17 0.04 0.04 PUMP/LOSS ELEMENT RESULTS INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) (%) (Hp) ($) ($) (ft) VP-2 451.34 0.00 271.59 271.6 75.00 0. 0.0 0.0 ** ** 33.2 VP-3 696.91 0.00 256.91 256.9 75.00 0. 0.0 0.0 ** ** 33.2 NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) J-1 6.00 499.67 250.00 249.67 108.19 J-5 2.25 500.25 232.00 268.25 116.24 J-6 3.50 497.81 222.00 275.81 119.52 J-7 3.75 497.82 224.00 273.82 118.66 J-8 6.75 496.84 242.00 254.84 110.43 J-9 3.75 496.83 238.00 258.83 112.16 J-10 0.00 496.13 246.00 250.13 108.39 J-11 4.50 496.12 246.00 250.12 108.39 J-13 0.00 499.32 234.00 265.32 114.97 J-14 4.50 499.32 220.00 279.32 121.04 J-15 6.75 500.23 228.00 272.23 117.97 J-16 36.00 497.75 228.00 269.75 116.89 J-17 13.50 498.36 248.00 250.36 108.49 J-18 21.00 497.19 248.00 249.19 107.98 J-19 6.00 496.78 246.00 250.78 108.67 J-20 15.00 497.34 242.00 255.34 110.65 J-21 1003.00 495.68 248.00 247.68 107.33 J-22 12.00 495.66 248.00 247.66 107.32 VP-2 ---- 501.59 230.00 271.59 117.69 VP-3 ---- 514.91 258.00 256.91 111.33 MAXIMUMAND MINIMUM VALUES PRESSURES JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES (psi) (psi) J-14 121.04 J-22 107.32 J-6 119.52 J-21 107.33 J-7 118.66 J-18 107.98 J-15 117.97 J-1 108.19 VP-2 117.69 J-11 108.39 VELOCITIES PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) (ft/s) P-11 4.45 P-29 0.03 P-1 4.43 P-24 0.10 P-10 4.41 P-26 0.11 P-20 2.88 P-30 0.17 P-21 2.82 P-2 0.31 H L + M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) (ft/ft) P-11 8.16 P-29 0.00 P-1 8.10 P-24 0.01 P-10 8.03 P-26 0.02 P-20 3.86 P-30 0.04 P-21 3.52 P-2 0.13 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 (ft/ft) (ft/ft) P-11 8.16 P-29 0.00 P-1 8.10 P-24 0.01 P-10 8.03 P-26 0.02 P-20 3.86 P-30 0.04 P-21 3.52 P-2 0.13 SUMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE VP-2 451.34 VP-3 696.91 NET SYSTEM INFLOW = 1148.25 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1148.25 ***** HYDRAULIC ANALYSIS COMPLETED ***** p McCLURE & BROWNE ENGINEERING/SURVEYING, INC. \ ot G 11 1008 Woodcreek Dr.,Suite 103•College Station,Tx.77845 (979)693-3838 Engineer Reg.No.F-458 Survey Reg.No.101033-00 EXHIBIT B 12" Water Line Fire Flow Model F:\1065-Davis Young\0019-Pebble Creek Phase 7D\Docs\OP Request\CoCS-Gibbs01 -OP Justification.doc Exhibit B 12" Pipe Fire Flow * * * * * * * * * * K Y P I P E 5 * * * * * * * * * * * * * Pipe Network Modeling Software * * * Copyrighted by KYPIPE LLC * * Version 5 - February 2010 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Mon Nov 10 15:59:55 2014 Master File : f:\1065 - davis young\0019 - pebble creek phase 7d\docs\op request\10650019-fire 12- inch.KYP\10650019-fire 12-inch.P2K ************************************************ SUMMARY OF O R I G I NAL DATA ************************************************ U NITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig P IPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N AME #1 #2 (ft) (in) COEFF. LOSS COEFF. P-1 3-21 J-19 135.54 8.00 140.0000 0.00 P-2 J-21 J-22 148.79 4.00 140.0000 0.00 P-3 J-19 J-18 144.81 8.00 140.0000 0.00 P-4 J-19 J-20 317.67 8.00 140.0000 0.00 P-5 J-18 J-17 496.99 8.00 140.0000 0.00 P-6 J-20 J-18 452.72 6.00 140.0000 0.00 P-7 J-20 J-16 152.23 8.00 140.0000 0.00 P-8 J-16 J-6 295.10 12.00 140.0000 0.00 P-9 J-17 J-16 317.11 8.00 140.0000 0.00 P-10 J-17 J-1 163.21 8.00 140.0000 0.00 P-11 J-1 VP-3 1867.79 8.00 140.0000 0.00 P-20 VP-2 J-5 348.00 8.00 135.9163 0.00 P-21 J-5 J-13 264.00 8.00 140.0000 0.00 P-22 J-7 J-6 78.00 8.00 140.0000 0.00 P-23 J-7 J-8 467.00 8.00 140.0000 0.00 P-24 J-8 J-9 275.00 4.00 140.0000 0.00 P-25 J-8 J-10 356.00 8.00 140.0000 0.00 P-26 J-10 J-11 201.00 4.00 140.0000 0.00 P-27 J-10 3-21 229.00 8.00 140.0000 0.00 P-28 J-13 J-7 435.00 8.00 140.0000 0.00 P-29 J-13 J-14 445.00 12.00 140.0000 0.00 P-30 J-5 J-15 515.00 4.00 140.0000 0.00 P UMP/LOSS ELEMENT DATA THERE IS A DEVICE AT NODE VP-2 DESCRIBED BY THE FOLLOWING DATA: (ID= 1) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (%) 287.22 0.00 75.00 184.15 1250.00 75.00 -84.84 2500.00 75.00 THERE IS A DEVICE AT NODE VP-3 DESCRIBED BY THE FOLLOWING DATA: (ID= 2) HEAD FLOWRATE EFFICIENCY (ft) (gpm) (%) 279.23 0.00 75.00 186.92 1500.00 75.00 -54.00 3000.00 75.00 N ODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) J-1 6.00 250.00 J-5 2.25 232.00 J-6 3.50 222.00 J-7 3.75 224.00 J-8 6.75 242.00 J-9 3.75 238.00 J-10 0.00 246.00 J-11 4.50 246.00 J-13 0.00 234.00 J-14 4.50 220.00 J-15 6.75 228.00 J-16 36.00 228.00 J-17 13.50 248.00 J-18 21.00 248.00 J-19 6.00 246.00 J-20 15.00 242.00 J-21 1003.00 248.00 J-22 12.00 248.00 VP-2 ---- 230.00 230.00 VP-3 ---- 258.00 258.00 O UTPUT OPTION DATA OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT MAXIMUM AND MINIMUM PRESSURES = 5 MAXIMUM AND MINIMUM VELOCITIES = 5 MAXIMUM AND MINIMUM HEAD LOSS/1000 = 5 S YSTEM CONFIGURATION NUMBER OF PIPES (p) = 22 NUMBER OF END NODES (j) = 18 NUMBER OF PRIMARY LOOPS (1) = 3 NUMBER OF SUPPLY NODES (f) = 2 NUMBER OF SUPPLY ZONES (z) = 1 Case: 0 RESULTS OBTAINED AFTER 5 TRIALS: ACCURACY = 0.00000 S IMULATION DESCRIPTION (LAB E L) P IPELINE RESULTS STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NUMBERS FLOWRATE HEAD MINOR LINE HL+ML/ HL/ N AME #1 #2 LOSS LOSS VELO. 1000 1000 (gpm) (ft) (ft) (ft/s) (ft/ft) (ft/ft) P-1 J-19 J-21 696.69 1.11 0.00 4.45 8.15 8.15 P-2 J-21 J-22 12.00 0.02 0.00 0.31 0.13 0.13 P-3 J-18 J-19 395.29 0.41 0.00 2.52 2.85 2.85 P-4 J-20 J-19 307.41 0.57 0.00 1.96 1.79 1.79 P-5 J-17 J-18 357.09 1.18 0.00 2.28 2.36 2.36 P-6 J-20 J-18 59.20 0.16 0.00 0.67 0.34 0.34 P-7 J-16 J-20 381.61 0.41 0.00 2.44 2.67 2.67 P-8 J-6 J-16 97.54 0.01 0.00 0.28 0.03 0.03 P-9 J-17 J-16 320.07 0.61 0.00 2.04 1.93 1.93 P-10 J-1 J-17 690.66 1.31 0.00 4.41 8.02 8.02 P-11 VP-3 J-1 696.66 15.23 0.00 4.45 8.15 8.15 P-20 VP-2 2-5 451.60 1.34 0.00 2.88 3.86 3.86 P-21 J-5 J-13 442.60 0.93 0.00 2.82 3.52 3.52 P-22 J-7 2-6 101.04 0.02 0.00 0.64 0.23 0.23 P-23 J-7 J-8 333.31 0.97 0.00 2.13 2.08 2.08 P-24 J-8 J-9 3.75 0.00 0.00 0.10 0.01 0.01 P-25 J-8 2-10 322.81 0.70 0.00 2.06 1.96 1.96 P-26 J-10 J-11 4.50 0.00 0.00 0.11 0.02 0.02 P-27 J-10 J-21 318.31 0.44 0.00 2.03 1.91 1.91 P-28 J-13 J-7 438.10 1.50 0.00 2.80 3.45 3.45 P-29 3-13 J-14 4.50 0.00 0.00 0.01 0.00 0.00 P-30 J-5 J-15 6.75 0.02 0.00 0.17 0.04 0.04 PUMP/LOSS ELEMENT RESULTS INLET OUTLET PUMP EFFIC- USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) (%) (Hp) (8) ($) (ft) VP-2 451.60 0.00 271.58 271.6 75.00 0. 0.0 0.0 ** ** 33.2 VP-3 696.66 0.00 256.93 256.9 75.00 0. 0.0 0.0 ** ** 33.2 NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE (gpm) (ft) (ft) (ft) (psi) J-1 6.00 499.70 250.00 249.70 108.20 J-5 2.25 500.23 232.00 268.23 116.23 2-6 3.50 497.78 222.00 275.78 119.51 J-7 3.75 497.80 224.00 273.80 118.65 2-8 6.75 496.83 242.00 254.83 110.43 J-9 3.75 496.83 238.00 258.83 112.16 J-10 0.00 496.13 246.00 250.13 108.39 J-11 4.50 496.13 246.00 250.13 108.39 J-13 0.00 499.30 234.00 265.30 114.97 J-14 4.50 499.30 220.00 279.30 121.03 J-15 6.75 500.21 228.00 272.21 117.96 J-16 36.00 497.78 228.00 269.78 116.90 J-17 13.50 498.39 248.00 250.39 108.50 J-18 21.00 497.21 248.00 249.21 107.99 J-19 6.00 496.80 246.00 250.80 108.68 J-20 15.00 497.37 242.00 255.37 110.66 J-21 1003.00 495.69 248.00 247.69 107.33 J-22 12.00 495.67 248.00 247.67 107.33 VP-2 ---- 501.58 230.00 271.58 117.68 VP-3 ---- 514.93 258.00 256.93 111.33 256.93AND MINIMUM VALUES PRESSURES JUNCTION MAXIMUM JUNCTION MINIMUM NUMBER PRESSURES NUMBER PRESSURES (psi) (psi) J-14 121.03 J-22 107.33 J-6 119.51 J-21 107.33 J-7 118.65 J-18 107.99 J-15 117.96 2-1 108.20 VP-2 117.68 J-11 108.39 VELOCITIES • PIPE MAXIMUM PIPE MINIMUM NUMBER VELOCITY NUMBER VELOCITY (ft/s) (ft/s) P-1 4.45 P-29 0.01 P-11 4.45 P-24 0.10 P-10 4.41 P-26 0.11 P-20 2.88 P-30 0.17 P-21 2.82 P-8 0.28 H L + M L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL+ML/1000 NUMBER HL+ML/1000 (ft/ft) (ft/ft) P-1 8.15 P-29 0.00 P-11 8.15 P-24 0.01 P-10 8.02 P-26 0.02 P-20 3.86 P-8 0.03 P-21 3.52 P-30 0.04 H L / 1 0 0 0 PIPE MAXIMUM PIPE MINIMUM NUMBER HL/1000 NUMBER HL/1000 (ft/ft) (ft/ft) P-1 8.15 P-29 0.00 P-11 8.15 P-24 0.01 P-10 8.02 P-26 0.02 P-20 3.86 P-8 0.03 P-21 3.52 P-30 0.04 SUMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE VP-2 451.60 VP-3 696.66 NET SYSTEM INFLOW = 1148.25 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1148.25 ***** HYDRAULIC ANALYSIS COMPLETED ***** McCLURE & BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Dr.,Suite 103•College Station,Tx.77845 (979)6933838 Engineer Reg.No.F-458 Survey Reg.No.101033-00 EXHIBIT C Cost Estimate F:\1065-Davis Young\0019-Pebble Creek Phase 7D\Docs\OP Request\CoCS-Gibbs01 -OP Justification.doc PEBBLE CREEK PHASE 7D & PEBBLE CREEK PARKWAY MBESI PROJ#: 1065-0019 OVERSIZE PARTICIPATION ESTIMATE October 14, 2014 Item# Description Unit Quantity Unit Price Total 12" Water System Construction 1 12"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 1,868 46.00 85,928 2 12"PVC, C909 Cl 200, Water Line,Non-Str. Backfill L.F. 1,931 43.00 83,033 3 8"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 2,651 38.00 100,738 4 8"PVC, C909 Cl 200, Water Line, Non-Str. Backfill L.F. 168 35.00 5,880 5 6"PVC, C909 CI 200, Water Line, Str. Backfill L.F. 738 30.00 22,140 6 4"PVC, C909 Cl 200, Water Line, Str. Backfill L.F. 312 22.50 7,020 7 Fire Hydrant Assembly EACH 6 3,800.00 22,800 8 12"x12"M.J. Tee EACH 1 600.00 600 9 12"x8"M.J. Tee EACH 2 500.00 1,000 10 8"x8"M.J. Tee EACH 1 475.00 475 11 8"x6"M.J. Tee EACH 3 400.00 1,200 12 8"x4"M.J. Tee EACH 1 350.00 350 13 12" Gate Valve EACH 5 3,035.00 15,175 14 12"x8"Reducer EACH 1 500.00 500 14 8"M.J. Gate Valve EACH 8 1,250.00 10,000 15 6"M.J. Gate Valve EACH 3 950.00 2,850 16 12"x13" M.J. Anchor Coupling EACH 6 300.00 1,800 17 8"x13"M.J. Anchor Coupling EACH 9 250.00 2,250 18 6"x13"M.J. Anchor Coupling EACH 8 250.00 2,000 19 12"x45 deg. Bend EACH 2 250.00 500 20 8"x22.5 deg. Bend EACH 2 250.00 500 21 8"x11.25 deg. Bend EACH 1 250.00 250 22 6"x45 deg. Bend EACH 1 250.00 250 22 6"x22.5 deg. Bend EACH 1 250.00 250 23 6"x11.25 deg. Bend EACH 1 250.00 250 22 2"Blow Off Valve Assembly EACH 1 1,100.00 1,100 23 Connect to Existing Waterline EACH 3 1,100.00 3,300 24 Water Service, 1" Type K Copper Short Side(<20') EACH 1 800.00 800 25 Water Service, 1.5" Type K Copper Short Side(<20') EACH 17 950.00 16,150 26 Water Service, 1" Type K Copper Short Side(>20') EACH 1 1,250.00 1,250 27 Water Service, 1.5"Type K Copper Short Side(>20') EACH 20 1,450.00 29,000 12" Water System Subtotal $419,339 1 of 2 PEBBLE CREEK PHASE 7D & PEBBLE CREEK PARKWAY MBESI PROJ#: 1065-0019 OVERSIZE PARTICIPATION ESTIMATE October 14, 2014 Item# Description Unit Quantity Unit Price Total 8" Water System Construction 1 12"PVC, C909 Cl 200, Water Line, Str.Backfill L.F. 0 45.00 0 2 12"PVC,C909 Cl 200,Water Line,Non-Str.Backfill L.F. 0 40.00 0 3 8"PVC, C909 Cl 200,Water Line, Str. Backfill L.F. 4,519 35.00 158,165 4 8"PVC, C909 CI 200,Water Line,Non-Str. Back ill L.F. 2,099 27,00 56,673 5 6"PVC, C909 Cl 200, Water Line,Str.Back-Ell L.F. 738 24.00 17,712 6 4"PVC,C909 Cl 200,Water Line,Str. Backfill L.F. 313 18.00 5,634 7 Fire Hydrant Assembly EACH 5 3,500.00 17,500 8 12"x12"M.J.Tee EACH 0 700.00 0 9 I2"x8"M.J. Tee EACH 0 675.00 0 10 8"x8"M.J.Tee EACH 6 475.00 2,850 11 8"x6"M.J.Tee EACH 3 400.00 1,200 12 8"x4"M.J.Tee EACH 1 350.00 350 13 12" Gate Valve EACH 0 2,200.00 0 14 12"x8"Reducer EACH 0 500.00 0 E 15 8"M.J. Gate Valve EACH 13 1,250.00 16,250 16 6"M.J. Gate Valve EACH 3 950.00 2,850 17 12"x13"M.J. Anchor Coupling EACH 0 250.00 0 f 18 8"x13"M.J. Anchor Coupling EACH 15 250.00 3,750 19 6"x13"M.J. Anchor Coupling EACH 8 250.00 2,000 20 12"x45 deg. Bend EACH 0 250.00 0 21 8"x22.5 deg. Bend EACH 4 250.00 1,000 22 8"x11.25 deg. Bend EACH 1 250.00 250 23 6"x45 deg. Bend EACH 1 250.00 250 23 6"x22.5 deg.Bend EACH 1 250.00 250 24 6"x11.25 deg.Bend EACH 1 250.00 250 23 2"Blow Off Valve Assembly EACH 1 1,100.00 1,100 24 Connect to Existing Waterline EACH 3 1,100.00 3,300 25 Water Service, 1" Type K Copper Short Side(<20') EACH 1 800.00 800 26 Water Service, 1,5"Type K Copper Short Side(<20') EACH 17, 950.00 16,150 27 Water Service, 1"Type K Copper Short Side(>20') EACH 1 1,250.00 1,250 28 Water Service, 1.5"Type K Copper Short Side(>20') EACH 20 1,450.00 29,000 8"Water System Subtotal $338,534 TOTAL CONSTRUCTION COST $52,190 BONDING COSTS $4,750 TOTAL OP REQUEST $56,940 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that „:. .. �,".,m�.� h NI the engineer does not have any control over contractor or supplier .'"3 O� '1';-• * .Z // ;c,-):.. A ..-:),3, 1ji 2- 1 s(a it ` , , EA L. F},7SE Fi..'�' ,1 Jeff:,'a e'ob.., ,en,P.E. ((( Date ee 2 of 2 PEBBLE CREEK PHASE 7D & PEBBLE CREEK PARKWAY MBESI PROJ#: 1065-0019 OVERSIZE PARTICIPATION ESTIMATE October 14, 2014 Item# Description Unit Quantity Unit Price Total 12" Water System Construction 1 12"PVC, C909 Cl 200,Water Line, Str,Backfill L.F. 1,868 45.00 84,060 2 12"PVC, C909 CI 200,Water Line,Non-Str.Bacld11ll L.F. 1,931 40.00 77,240 3 8"PVC,C909 Cl 200, Water Line, Str. Backfill L.F. 2,651 35.00 92,785 4 8"PVC,C909 C1200,Water Line,Non-Str. Backfill L.F. 168 27.00 4,536 5 6"PVC, C909 Cl 200,Water Line, Str.Backfill L.F. 738 24.00 17,712 6 4"PVC,C909 Cl 200, Water Line, Str.Backfill L.F. 312 18.00 5,616 7 Fire Hydrant Assembly EACH 6 3,500.00 21,000 8 12"x12"M.J. Tee EACH 1 700.00 700 9 12"x8"M.J.Tee EACH 2 675.00 1,350 10 8"x8"M.J.Tee EACH 1 475.00 475 11 8"x6"M.J. Tee EACH 3 400.00 1,200 12 8"x4"M.J.Tee EACH 1 350.00 350 13 12"Gate Valve EACH 5 2,200.00 11,000 14 12"x8"Reducer EACH 1 500.00 500 14 8"M.J. Gate Valve EACH 8 1,250,00 10,000 15 6"M.J. Gate Valve EACH 3 950.00 2,850 16 12"x13"M.J. Anchor Coupling EACH 6 250.00 1,500 17 8"x13"M.J. Anchor Coupling EACH 9 250.00 2,250 18 6"x13"M.J. Anchor Coupling EACH 8 250.00 2,000 _ 19 12"x45 deg. Bend EACH 2 250.00 500 • 20 8"x22.5 deg.Bend , EACH 2 250.00 500 21 8"x11.25 deg.Bend EACH 1 250.00 250 22 6"x45 deg. Bend EACH 1 250,00 250 22 6"x22.5 deg.Bend EACH 1 250,00 250 I 23 6"x11.25 deg. Bend EACH 1 250.00 250 j 22 2"Blow Off Valve Assembly EACH 1 1,100.00 1,100 23 Connect to Existing Waterline EACH 3 1,100.00 3,300 24 Water Service, 1"Type K Copper Short Side(<20') EACH 1 800.00 800 25 Water Service, 1.5"Type K Copper Short Side(<20') EACH 17 950.00 16,150 26 Water Service, 1"Type K Copper Short Side(>20') EACH 1 1,250.00 1,250 27 Water Service, 1.5"Type K Copper Short Side(>20') EACH 20 1,450.00 29,000 12"Water System Subtotal $390,724 i l . f 1 of 4