HomeMy WebLinkAboutMisc FOR OFFICE USE ONLY
CASE NO.: ItA 2'33
4.. I pff II'4 14 DATE SUBMITTED: 0671 2G
TIME: \O00
CITY OF COI LEGF,STATION STAFF: 5
Home of Texas AcrM University"
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
07-New Project Submittal
❑ Incomplete Project Submittal -documents needed to complete an application. Case No.:
❑ Existing Project Submittal. Case No.: \q ,2
Project Name `\DoJy`�"4t.n�\--
Contact Name Ost �c-ln.,Nr-L (c\--
Phone Number SMR- 3�'aL31/
We are transmitting the following for Planning & Development Services to review and comment(check all that apply)-
] Comprehensive
pply):❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
❑ Rezoning Application n Irrigation Plan
E Conditional Use Permit ❑ Variance Request
❑ Preliminary Plan Li Development Permit
❑ Final Plat E Development Exaction Appeal
❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan ❑ rading Plan
Special District Site Plan 0/Grading
- Please specify below
P -
E
Special District Building/Sign , >��t}: -\- AA•
❑ Landscape Plan - vb.^- tl' R S c.ts ._, 4t,s.ns,j
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
CComprehensive Plan Amendment ❑ Waterline Construction Documents
❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
—_ Drainage Letter or Report
❑ Easement Application
❑ Fire Flow Analysis n Other- Please specify
11111\14
-----Abil
Special Instructions:
FOR OFFICE USE ONLY
CASE NO.: � C 3
? `3
DATE SUBMITTED: 1 I J I`�
(41)iffir111141 TIME:
CIT\'OF COLLEGE STATION STAFF: 1/
Home ofTexas A&M University" :14_
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
Li New Project Submittal
I I Incomplete Project Submittal - documents needed to complete an application. Case No.:
S] Existing Project Submittal. Case No.: )L+
Project Name l,'ci h ►.J'(o11cj
Contact Name Phone Number
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
Comprehensive Plan Amendment n Non-Residential Architectural Standards
Rezoning Application I I Irrigation Plan
I Conditional Use Permit ( j Variance Request
Preliminary Plan IDevelopment Permit
I Final Plat I Development Exaction Appeal
Development Plat I FEMA CLOMA/CLOMR/LOMA/LOMR
I Site Plan Grading Plan
I Special District Site Plan [ ] Other- Please specify below
I Special District Building / Sign Noy , ' uk C•1i
Landscape PlanPy
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
I I Comprehensive Plan Amendment n Waterline Construction Documents
I I TxDOT Driveway Permit I I Sewerline Construction Documents
I I TxDOT Utility Permit n Street Construction Documents
Drainage Letter or Report I I Easement Application
Fire Flow Analysis I I Other- Please specify
Special Instructions:
10/10 Print Form
Mark Bombek
From: Mark Bombek
Sent: Thursday, November 06, 2014 9:48 AM
To: 'Duddleys77@yahoo.com'
Subject: Rough Draught
Hi Rusty,
I got an email response back saying that Phillips email is not correct.Would you please forward my email to him?
Thank you,
Mark Bombek
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station , TX 77842
Office: 979-764-3570
Fax: 979-764-3496
Email: mbombek@cstx.gov
Website: www.cstx.gov
1
Mark Bombek
From: Mark Bombek
Sent: Thursday, November 06, 2014 9:46 AM
To: 'Rptthomas@hotmail.com'
Cc: 'Duddleys77@yahoo.com'
Subject: Rough Draught Revised Building Elevations
Hi Phillip,
I wanted to follow up with you all for the most recent resubmittal I received for Rough Draught. I took a look at the
drawings. I saw that a new materials table was made for the side elevation, and the line noting 0 to 8 feet was drawn in
as well. Looking at the new table, everything but transparency does not need to be recalculated.The other materials
(stucco, and brick) are based on the entire facade.Transparency is the only material that is calculated for the area lying
within 0 to 8 feet of the facade. In order to clearly identify which waivers need to be submitted we need to have those
calculations clearly identified on the plan for both elevations. A new table isn't needed just revise the transparency
calculation for both facades and note that the calculation is just for the area between 0 and 8 feet. Also please double
check any other material calculations for both elevations and revise as needed. If you have any questions or if this
doesn't seem clear please let me know, I am here to help.
Thank you,
Mark Bombek
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station , TX 77842
Office: 979-764-3570
Fax: 979-764-3496
Email: mbombek@cstx.gov
Website: www.cstx.gov
1
Mark Bombek
From: Mark Bombek
Sent: Friday, September 12, 2014 11:38 AM
To: 'Duddleys77@yahoo.com'
Cc: Benjamin Mccarty; 'benning@suddenlink.net; 'rptthomas@hotmail.com'
Subject: Rough Draught Call for revisions
Attachments: UDO section 12-5.8 Design Districts, B. Northgate Districts NG_ Building Design
Standards.pdf
Good Morning,
I have had the opportunity to review your application for Rough Draught and there are some revisions that I am
requiring. Please add to the title block on all pages;the address of the property, and the name, address, and phone
number of the applicant. On sheets A-2.1 and A-2.2 showing the elevation plans of the building please provide a table
showing the building materials percentage calculations for those materials, and proposed material colors. In this email I
am attaching a portion of our Unified Development Ordinance that pertains to Northgate building design standards.
Please refer to the three subsections that I have highlighted when making your table for the elevation plans. If there are
any further questions regarding this project please contact me.
Respectfully,
Mark Bombek
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station , TX 77842
Office: 979-764-3570
Fax: 979-764-3496
Email: mbombekAcstx.gov
Website: www.cstx.gov
1
(ir-ffr‘4
CITY OF COIT.FGE STATION
Home of Texas AerM University'
January 8, 2015
Rusty Richards
313 Church Avenue
College Station, Texas 77802
RE: Property located at 313 Church Avenue in the Northgate District
Dear Mr. Richards:
This letter is to inform you that the above referenced property has received an Administrative
Adjustment of 203.31 square feet (1.9% adjustment) to decrease the 25% masonry requirement as
required by the Unified Development Ordinance, Section 12-5.8.B.4.b.e, Exterior Building Materials
on the Church Avenue facade.
According to the Unified Development Ordinance Section 12-3.18, the Administrator has the authority
to authorize adjustment of up to ten percent (10%) from any numerical zoning standard set forth in
the Unified Development Ordinance. To approve the application for an Administrative Adjustment,
the Administrator shall make an affirmative finding that specific criteria, as outlined in Section 12-
3.18.E of the Unified Development Ordinance, have been met.
The Administrator has found that:
Granting the adjustment will ensure the same general level of land use compatibility as the
otherwise applicable standards because the decreased requirement does not significantly alter
the intensity of the land use, as an existing building is being renovated into greater compliance
with the existing standards;
Granting the adjustment will not materially or adversely affect adjacent land uses or the physical
character of uses in the immediate vicinity of the proposed development because the reduction in
the required amount of brick does not significantly alter the character of the structure or it's
density; and
Granting the adjustment will be generally consistent with the purposes and intent of this UDO as
the reduction in the requirement is not significant in relation to the compliance otherwise
achieved.
If you have any questions, please feel free to call me at 979.764.3570.
Sincerely,
Lance Simms
Director, Planning & Development Services
pc: File# 15-00900006
Planning er Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION • TEXAS •77842