MEMORANDUM
DATE: December 31, 2014
TO: Rusty Richards, via; duddle s77 • ahoo.com
FROM: Mark Bombek, Staff Planner
SUBJECT: ROUGH DRAUGHT (NG)
lowing
Staff reviewed the above-mentioned Northgate Build
that ingneed to be addreview as uested. The essed. Pleasereview
page is a list of staff review comments detailing items
the following at your convenience.
Please note that this application will expire in 90 days from the date of this memo, if the
e
applicant has not provided written responsecomments comments contained hrevised dereun.efts to there are
Administrator that seek to address the staff reviewons, please er attach a leave
omments that you are. If outhavveranying with questionshe revised or need additional information, please call me
explaining the details y
at 979.764.3570.
Attachments: Staff review comments
PC: Letty Benning, via; bennin• • suddenlink.net
Phillip Thomas, via; not thomas • hotmail.com
P&DS Project No. 14-00900233
Planning er Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STAFION •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
cstx.gov/devservices
STAFF REVIEW COMMENTS NO. 4
Rough Draught (NG) — Northgate Building Review
14-00900233
PLANNING
1. The tables for both façades located at the bottom of the drawing are still
indicating percentage calculations for all materials between 0 and 8 feet.
Transparency is the only material that is calculated between 0 and 8 feet. All
other material percentages listed should be calculated using the entire façade
area. An example of the table needed is as follows:
Stucco (amount in square feet) = % of total façade
Brick (amount in square feet) = % of total façade
Transparency (amount in square feet) = % of facade between 0 and 8 feet
Total facade (amount in square feet) = 100%
Please change the tables for both façades to reflect the above table.
2. As discussed on the phone, the front façade facing Church Street is meeting the
requirement to apply for an administrative adjustment of 7.43% which is 16.31
square feet less than the required 219.62 square feet.
3. The Second Street façade, with° the additional brick, is also still deficient.
façade is currently meeting 20% of the required 25% masonry. This percent
deficit equates to 14.55 square feet of brick missing. In order to meet the
maximum request for an administrative adjustment, being 10% of the required
25%, an additional 7.275 square feet of brick needs to be added to the building.
This will leave you with an administrative adjustmenttherequest r addition and the
includeull de Othe
which is also 7.275 square feet. Please make
adjustment in your application with the main façade.
Reviewed by: Mark Bombek
Date: 12-29-2014
0
1101 Texas Avenue, P.O. Box 9960
4-ff" College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COII.F;GI.STATION
Hone ofTexas AdM university MEMORANDUM
DATE: October 3, 2014
TO: Rusty Richards
FROM: Mark Bombek, Staff Planner
SUBJECT: Rough Draught(Ng) NRA Review
Staff reviewed the above-mentioned site do be addressed. Please addres
planowing tge is a he commient and
t of staff
review comments detailing items that nee
submit the following information for further staff review:
One (1) revised set of elevation drawings
Color Samples
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments containedons, herein.
in.atIf therch a e
sed
tter
omments that youaare, If ouothavveranylggwith uestionshe or need additional information, please call me
explaining the details. y
at 979.764.3570.
Attachments: Staff review comments
pc:
Case file #14-00900233
STAFF REVIEW COMMENTS NO. 1
Rough Draught (Ng) — NRA Review
14-00900233
PLANNING
1. As noted in the Unified Devepmentexrdinance in Section 5.8cept those within fifteen es(g5)DfeetDistricts
of
for Exterior Building Materials. All facades, )
another building that screens the faradeo�sn allnmaterials. Parking garages ist of a minimum of twenty-five (ase
percent of on (1) or more of the following building
excluded from this requirement. All other materials except as authorized herein or by the
Design Review Board, are prohibited.
a. Fired brick;
b. Natural stone;
c. Marble;
d. Granite;
e. Tile; and/or
f. Any Concrete product so long as it is an integrated color and is textured or
patterned (not aggregate material or split-face CMU) to look like brick, stone
marble, granite, tile, or a mater fabricated to simulate brick, stone, marble,
granite, or tile.
Please modify the amount of brick material on the building to reflect this requirement.
FYI... some of the calculations of the percentages within the materials tables are off.
Please review those calculations and change as needed. The ones that I noted were
the Side elevation brick percentage and stucco percentage. The brick percentage
states it as 19%, but when calculated as a percentage of the total façade it comes
out as 7.6%. The stucco says it is 55% when it computes to 66%.
2. Reviewed by: Mark Bombek
Date: 10-04-2014
(kr
CITY OF COLLEGE STATION
Home of Texas Ad M University'
MEMORANDUM
DATE: September 12, 2014
TO: Rusty Richards, via; duddle s77 • ahoo.com
FROM: Mark Bombek, Staff Planner
SUBJECT: ROUGH DRAUGHT (NG)
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to raddressed. Please address the comments and
submit the following information for further staff
ew:
One (1) revised set of elevation drawings
Color Samples
te
is
Please note that this application will expire
I response 90 commentsom and the
revased fdohcumentsmemo,
to the
if the
applicant has not provided written p
Administrator that seek to address the staff review comments containedons, plehe herein.atIf theree
explainingetter are
comments that you not
tveanyquestions or need additional information, please call me
addressing
with
the details. If youhave
at 979.764.3570.
Attachments: Staff review comments
PC: Case file #14-00900233
Planning&Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
STAFF REVIEW COM NRA S NO.
Rough Draught (Ng) —
w
14-00900233
PLANNING
1. . Please add to the title block on all pages; the address of the property, and e
licant.
name, address, and phone number of the app
2. On sheets A-2.1 and A-2.2 showing the elevation plans of the building please
provide a table showing the building materials percentage calculations for those
material colors.
materials, and proposed Date: 09-12-2014
Reviewed by: Mark Bombek
.ftwo-
CITY OF COLLEGE STATION
Home of Texas A&M University
MEMORANDUM
DATE: September 5, 2014
TO: Rusty Richards, via; duddleys77@yahoo.com ✓
FROM: Mark Bombeck, Staff Planner
SUBJECT: ROUGH DRAUGHT (NG)
Thank you for the submittal of your Northgate Building Review application. I have been
assigned to review this project and it is anticipated that the review will be completed and any
staff comments returned to you on or before Friday, September 12, 2014. If you have questions
in the meantime, please feel free to contact me.
PC: Letty Benning, via; benning@suddenlink.net ✓
Phillip Thomas, via; rptthomas@hotmail.com
P&DS Project No. 14-00900233
Planning er Development Services