DATE: November 7, 2014
TO: Kenn Walsh, via; kenn(c�keysandwalsh.com
FROM: Jerry Cuaron, Staff Planner
SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP)
Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review and to be scheduled for a
future Planning & Zoning Commission meeting:
One (1) 24"x 36"copy of the revised Preliminary Plan; and
Thirteen (13) 11"x 17"copies of the revised Preliminary Plan.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed, your project will be
pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed
on a future agenda once all the revisions have been made and the appropriate fees paid. Once
your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.qov/pz
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
PC: KWK Ventures & JDMD Development, via; kenn(p�keysandwalsh.com
Joe Schultz, via; joeschultz84(a�verizon.net
P&DS Project No. 14-00900245
Planning 6' Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
...-4.., r.r,.arinxpenrvitpe
STAFF REVIEW COMMENTS NO. 2
Project: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP) - 14-00900245
PLANNING
1. No comments
Reviewed by: Jerry Cuaron Date: November 7, 2014
ENGINEERING COMMENTS NO. 2
2. FYI the letter from Wickson Creek SUD was not attached with the last submittal, but please
attach it with the construction documents during Development permit application.
Reviewed by: Kevin Ferrer Date: November 3, 2014
Brazos County
Roans Chapel Commercial Subdivision—Preliminary Plan
Brazos County Review
Preliminary Plan Review #2
Comments and Suggestions by Munger
(979) 822-2127
07 November 2014
Sheet No Description
Prelim.Plan Comment: The roadway facility with the best pavement structure to handle commercial development is SH 30. Has
1 of I TxDOT been approached and denied access? While customers and employee parking could be addressed from Roans
Chapel Road-Freight Deliveries,collection of commercial waste,etc.will require wide Driveways, deeper pavement
structure and a denser pavement surface than exists on Roans Chapel Road today. Is the basis for Note 22 a denial
from TxDOT or refusal of applicant to work with TxDOT? Separate response Noted.
Prelim. Plan Comment: With dedication of ROW along Roans Chapel Road—is applicant providing for relocation of utilities within
I of 1 dedication so that roadway improvements can be made? Applicant responded negatively,thus applicant will be
denied plat approval for failure to comply with Article V.A.1.a& b of Brazos County Subdivision Regulations.
Prelim. Plan Comment: For Drainage—provide estimated flows from lots into roadway ditches and analyze possible effects on
1 of 1 existing roadway ditches and downstream cross-culvert. Response indicative that detention will mitigate any
potential increases in runoff. Note 23 is satisfactory.
Prelim. Plan Comment: For Drainage—provide a Private Drainage Easement to convey flows from Lots 3,4,5 to proposed
1 of 1 detention areas. Indicate how detention and other Private Drainage Easements will be maintained. How are detention
areas sized and"apportioned"to each lot? Private Drainage Easement has been added. Note 24 requires County
Review of Detention Pond and Site Review.
Prelim. Plan Comment: Would applicant consider monetary donation to county toward any needed roadway and drainage
1 of 1 improvements in public ROW as determined by further engineering analysis(by applicant)? Separate response noted.
Driveway and Culvert permits may not be approved until utilities have been cleared from ROW and ditch
relocated to permanent location(within dedicated ROW).
Prelim. Plan Comment: Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point. Note 22 is
1 of 1 satisfactory.
Prelim Plan Comment: Applicant needs to provide a letter from TxDOT that development will NOT require the addition of a
1 of 1 dedicated turn lane from SH 30 EB to Roans Chapel Road. Written documentation from TxDOT will be required
as a condition of a plat approval.
Prelim Plan Comment: Meet with County/City?to further discuss items resulting from review comments. We'll be glad to meet
l of l as needed.
Review by: R. Alan Munger Date: November 7, 2014
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
October 27, 2014
Jerry Cuaron
Staff Planner
City of College Station
1101 Texas Avenue
College Station,TX 77840
Re: Roans Chapel Commercial Subdivision(PP) 14-00900245
Dear Mr. Cuaron:
Attached are the responses to the Preliminary Plan Comments and the
following:
• (1) 24"x 36"copies of the revised Preliminary Plan
If you have any questions,please do not hesitate to call.
Very truly yours,
Schultz Engineering,LLC.
1
Deven Doyen,P. .
Civil Engineer
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
Staff Review Comments — No. 1
Roans Chapel Commercial Subdivision (PP) —# 14-00900245
PLANNING
1. Please show the approximate location, size of line, design pressure for the gas pipeline at
the southwest corner of the property.
Energy Transfer Company owns the pipeline and they have been contacted to mark
the location of the line. Once the line location is known it will be added to the
Preliminary Plan. The line is 10.75 inch, low-pressure natural gas gathering line.
2. The existing block length along Roans Chapel Rd between State HWU 30 and Golden Mist
exceeds 1,500 feet. Please revise the plat to provide a street that stubs to the Copus Tract
or revise the application to apply for a subdivision waiver to the block length requirement.
Attached is a revised application with waiver request.
3. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review. Noted.
BRAZOS COUNTY
1. The roadway facility with the best pavement structure to handle commercial
development is SH 30. Has TxDOT been approached and denied access? While
customers and employee parking could be addressed from Roans Chapel Road -
Freight Deliveries, collection of commercial waste, etc. will require wide Driveways,
deeper pavement structure and a denser pavement surface than exists on Roans
Chapel Road today. Is the basis for Note 22 a denial from TxDOT or refusal of applicant
to work with TxDOT? Lot 6 access from SH 30 is hindered by an existing drainage
way and culverts that go under SH 30. There is also inadequate separation
distance from Roans Chapel Road for a proposed driveway. The SH 30 frontage
for this tract is 372'which does not meet the 475'spacing requirement for TxDOT.
2. With dedication of ROW along Roans Chapel Road — is applicant providing for relocation
of utilities within dedication so that roadway improvements can be made? The applicant
is dedicating R.O.W. along Roans Chapel Rd to meet the 70' wide street right-of-
way requirement and is not relocating any utilities.
3. With regard to Note 6 — rural roadway subdivision standards may be an improper design
for a commercial development (as stated in previous review comment):
Can applicant provide an engineering analysis (not full blown TIA)which would provide:
1. Traffic Data. DHV, ADT, Percent Trucks (T) generated to/from the proposed
lots
2. Soil characteristics and strength
3. Traffic growth rates
4. Stage development
5. On-site Parking
6. Drainage
7. Proposed Geometry (Turning Radii and Widths of Driveways Needed)
8. T, Percentage of Trucks, the quantity of trucks during the ADT or DHV,
expressed as a percent of that total traffic. For the purpose here, light delivery
trucks, such as panels and pick-ups, are considered as passenger cars. In lieu of
the actual field data, T can be assumed as 30% for Roans Chapel Road Road.
D. Trucks shall be further identified as follows, during the traffic counting.
2DT - Unit truck, two axles
3SU - Unit truck, three axles
2S1 - Semi truck, two axles on cab, one axle on tailor
2S2 - Semi truck, two axles on cab, two axles on tailor
2AX -Truck with five axles or more
The owners/developers of the subdivision will be developing their businesses on
3 of the lots and will be office/warehouse structures with storage yards and
occasional large trucks coming to the site for deliveries. The building and parking
requirements are not known at this time. The use for the remaining 3 lots is
anticipated to be similar to the others.
4. For Drainage — provide estimated flows from lots into roadway ditches and analyze
possible effects on existing roadway ditches and downstream cross-culvert. Each lot
will provide detention mitigating any increases in peak runoff. Existing roadway
ditches and downstream cross-culverts should function as they do under existing
conditions.
5. For Drainage — provide a Private Drainage Easement to convey flows from Lots 3, 4, 5
to proposed detention areas. Indicate how detention and other Private Drainage
Easements will be maintained. How are detention areas sized and "apportioned" to each
lot? Private Drainage Easement for Lofts 3, 4, & 5 has been added and Note 24 has
been added for maintenance of Private Drainage Easements and detention areas.
6. Would applicant consider monetary donation to county toward any needed roadway and
drainage improvements in public ROW as determined by further engineering analysis
(by applicant)? The developer does not wish to contribute monetarily to roadway
and drainage improvements in the public ROW at this time.
7. Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point.
Note 22 has been revised to address Lot 6 access.
8. Applicant needs to provide a letter from TxDOT that development will NOT require the
addition of a dedicated turn lane from SH 30 EB to Roans Chapel Road. TxDOT has
been contacted by the City of College Station and does not have any comments at
this time.
9. County would desire (can't require) a lot width of 200 feet which would enable each lot to
have individual driveway access. Shared access may otherwise be required to/from
several (not all of the lots). Noted. The proposed use of some of the lots are for
office/warehouse use which will have limited traffic to each lot.
10. Meet with County/City? to further discuss items resulting from review comments. Noted.
Please let us know if you would like to meet with the Owner/Developer.
ENGINEERING COMMENTS NO. 1
1. FYI with the submittal of construction documents, provide a written verification that the
Wickson Creek Special Utility District is able to properly serve the proposed lots.
Wickson Creek SUD letter is attached, but a water main extension will be required
for this project.
2. Please increase the proposed Fire Hydrant symbol size for more legibility. Fire hydrant
symbol size has been increased.
3. FYI the proposed 8" water line along Lot 1 has only a 5' horizontal clearance from the
electrical power pole which may pose maintenance and construction issues. This can be
addressed on Final plat with construction documents. Noted.
4. Please include in note 23 that detention area(s) to be privately maintained by respective
parties/lot owners. Note 24 has been added.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. This project location is outside of CSU certification area. CSU will not provide electric
service to this project location. Noted.
GENERAL ELECTRICAL COMMENTS
1. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255. Noted.
FIRE
1. No comments at this time. Noted.
SANITATION
1. Sanitation is ok with this project. Noted.
440)
(icriff444
CITY OF COLLEGE STATION
Home of-Texas ASM University`
MEMORANDUM
DATE: October 2, 2014
TO: Kenn Walsh, via; kenn(p�keysandwalsh.com
FROM: Jerry Cuaron, Staff Planner
SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP)
Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review and to be scheduled for a
future Planning & Zoning Commission meeting:
One (1) 24" x 36" copy of the revised Preliminary Plan
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed, your project will be
pulled from the scheduled Planning & Zoning Commission agenda. Your project may beplaced
on a future agenda once all the revisions have been made and the appropriate fees paid. Once
your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.qov/home/index.asp?paqe=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
PC: KWK Ventures & JDMD Development, via: kenn(a�keysandwalsh.com
Joe Schultz, via; joeschultz84(c�verizon.net
P&DS Project No. 14-00900245
cc: Alan Munger, Brazos County Planning & Traffic, via fax 775.0453
Case file #14-00900245
Planning 6 Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
Staff Review Comments — No. 1
Roans Chapel Commercial Subdivision (PP) —# 14-00900245
PLANNING
1. Please show the approximate location, size of line, design pressure for the gas pipeline at
the southwest corner of the property.
2. The existing block length along Roans Chapel Rd between State HWU 30 and Golden Mist
exceeds 1,500 feet. Please revise the plat to provide a street that stubs to the Copus Tract
or revise the application to apply for a subdivision waiver to the block length requirement.
3. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Review by: Jerry Cuaron Date: September 30, 2014
BRAZOS COUNTY
1. The roadway facility with the best pavement structure to handle commercial
development is SH 30. Has TxDOT been approached and denied access? While
customers and employee parking could be addressed from Roans Chapel Road -
Freight Deliveries, collection of commercial waste, etc. will require wide Driveways,
deeper pavement structure and a denser pavement surface than exists on Roans
Chapel Road today. Is the basis for Note 22 a denial from TxDOT or refusal of applicant
to work with TxDOT?
2. With dedication of ROW along Roans Chapel Road — is applicant providing for relocation
of utilities within dedication so that roadway improvements can be made?
3. With regard to Note 6 — rural roadway subdivision standards may be an improper design
for a commercial development (as stated in previous review comment):
Can applicant provide an engineering analysis (not full blown TIA) which would provide:
1. Traffic Data. DHV, ADT, Percent Trucks (T) generated to/from the proposed
lots
2. Soil characteristics and strength
3. Traffic growth rates
4. Stage development
5. On-site Parking
6. Drainage
7. Proposed Geometry (Turning Radii and Widths of Driveways Needed)
8. T, Percentage of Trucks, the quantity of trucks during the ADT or DHV,
expressed as a percent of that total traffic. For the purpose here, light delivery
trucks, such as panels and pick-ups, are considered as passenger cars. In lieu of
the actual field data, T can be assumed as 30% for Roans Chapel Road Road.
D. Trucks shall be further identified as follows, during the traffic counting.
2DT - Unit truck, two axles
3SU - Unit truck, three axles
2S1 - Semi truck, two axles on cab, one axle on tailor
2S2 - Semi truck, two axles on cab, two axles on tailor
2AX - Truck with five axles or more
4. For Drainage — provide estimated flows from lots into roadway ditches and analyze
possible effects on existing roadway ditches and downstream cross-culvert.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these p2lans
af 3
that have not been pointed out to the City,will constitute a completely new review.
5. For Drainage — provide a Private Drainage Easement to convey flows from Lots 3, 4, 5
to proposed detention areas. Indicate how detention and other Private Drainage
Easements will be maintained. How are detention areas sized and "apportioned" to each
lot?
6. Would applicant consider monetary donation to county toward any needed roadway and
drainage improvements in public ROW as determined by further engineering analysis
(by applicant)?
7. Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point.
8. Applicant needs to provide a letter from TxDOT that development will NOT require the
addition of a dedicated turn lane from SH 30 EB to Roans Chapel Road.
9. County would desire (can't require) a lot width of 200 feet which would enable each lot to
have individual driveway access. Shared access may otherwise be required to/from
several (not all of the lots).
10. Meet with County/City? to further discuss items resulting from review comments.
Reviewed by: Alan Munger Date: September 26, 2014
ENGINEERING COMMENTS NO. 1
1. FYI with the submittal of construction documents, provide a written verification that the
Wickson Creek Special Utility District is able to properly serve the proposed lots.
2. Please increase the proposed Fire Hydrant symbol size for more legibility.
3. FYI the proposed 8" water line along Lot 1 has only a 5' horizontal clearance from the
electrical power pole which may pose maintenance and construction issues. This can be
addressed on Final plat with construction documents.
4. Please include in note 23 that detention area(s) to be privately maintained by respective
parties/lot owners.
Reviewed by: Kevin Ferrer Date: September 24, 2014
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. This project location is outside of CSU certification area. CSU will not provide electric
service to this project location.
GENERAL ELECTRICAL COMMENTS
1. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: September 29, 2014
FIRE
1) No comments at this time
Reviewed by: Steve Smith Date: September 23, 2014
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: September 23, 2014
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these 3laf 3
that have not been pointed out to the City, will constitute a completely new review.
CITY OP COLLEGE STATION
Home of texas A&M University"
MEMORANDUM
19, 2014 • " 1
DATE: September � 1
TO: Kenn Walsh, via; kenn ,kevsandwaish.com
FROM: Jerry Cuaron, Staff Planner
SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP)
Thank you for the submittal of your Preliminary Plan application. Kevin Ferrer, Graduate Civil
Engineer, and I have been assigned to review this project. It is anticipated that the review will be
completed and any staff comments returned to you on or before Friday, October 3, 2014. If you
have questions in the meantime, please feel free to contact us.
PC: KWK Ventures & JDMD Development, via; kenn(ckeysandwaish.com
Joe Schultz, via; joeschultz84 aAverizon.net
P&DS Project No. 14-00900245
Planning u"Development Services
P.O.ROX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS77842
TEL.979 764.3570 •FAX. 979.764.3496
cstx.eovldevsentces