Loading...
HomeMy WebLinkAboutStaff Review ( .::.,' *ir CITY OF COIEGE STATION Home of Texas Ad M University' MEMORANDUM DATE: November 7, 2014 TO: Kenn Walsh, via; kenn(c�keysandwalsh.com FROM: Jerry Cuaron, Staff Planner SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP) Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x 36"copy of the revised Preliminary Plan; and Thirteen (13) 11"x 17"copies of the revised Preliminary Plan. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: KWK Ventures & JDMD Development, via; kenn(p�keysandwalsh.com Joe Schultz, via; joeschultz84(a�verizon.net P&DS Project No. 14-00900245 Planning 6' Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 ...-4.., r.r,.arinxpenrvitpe STAFF REVIEW COMMENTS NO. 2 Project: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP) - 14-00900245 PLANNING 1. No comments Reviewed by: Jerry Cuaron Date: November 7, 2014 ENGINEERING COMMENTS NO. 2 2. FYI the letter from Wickson Creek SUD was not attached with the last submittal, but please attach it with the construction documents during Development permit application. Reviewed by: Kevin Ferrer Date: November 3, 2014 Brazos County Roans Chapel Commercial Subdivision—Preliminary Plan Brazos County Review Preliminary Plan Review #2 Comments and Suggestions by Munger (979) 822-2127 07 November 2014 Sheet No Description Prelim.Plan Comment: The roadway facility with the best pavement structure to handle commercial development is SH 30. Has 1 of I TxDOT been approached and denied access? While customers and employee parking could be addressed from Roans Chapel Road-Freight Deliveries,collection of commercial waste,etc.will require wide Driveways, deeper pavement structure and a denser pavement surface than exists on Roans Chapel Road today. Is the basis for Note 22 a denial from TxDOT or refusal of applicant to work with TxDOT? Separate response Noted. Prelim. Plan Comment: With dedication of ROW along Roans Chapel Road—is applicant providing for relocation of utilities within I of 1 dedication so that roadway improvements can be made? Applicant responded negatively,thus applicant will be denied plat approval for failure to comply with Article V.A.1.a& b of Brazos County Subdivision Regulations. Prelim. Plan Comment: For Drainage—provide estimated flows from lots into roadway ditches and analyze possible effects on 1 of 1 existing roadway ditches and downstream cross-culvert. Response indicative that detention will mitigate any potential increases in runoff. Note 23 is satisfactory. Prelim. Plan Comment: For Drainage—provide a Private Drainage Easement to convey flows from Lots 3,4,5 to proposed 1 of 1 detention areas. Indicate how detention and other Private Drainage Easements will be maintained. How are detention areas sized and"apportioned"to each lot? Private Drainage Easement has been added. Note 24 requires County Review of Detention Pond and Site Review. Prelim. Plan Comment: Would applicant consider monetary donation to county toward any needed roadway and drainage 1 of 1 improvements in public ROW as determined by further engineering analysis(by applicant)? Separate response noted. Driveway and Culvert permits may not be approved until utilities have been cleared from ROW and ditch relocated to permanent location(within dedicated ROW). Prelim. Plan Comment: Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point. Note 22 is 1 of 1 satisfactory. Prelim Plan Comment: Applicant needs to provide a letter from TxDOT that development will NOT require the addition of a 1 of 1 dedicated turn lane from SH 30 EB to Roans Chapel Road. Written documentation from TxDOT will be required as a condition of a plat approval. Prelim Plan Comment: Meet with County/City?to further discuss items resulting from review comments. We'll be glad to meet l of l as needed. Review by: R. Alan Munger Date: November 7, 2014 Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 October 27, 2014 Jerry Cuaron Staff Planner City of College Station 1101 Texas Avenue College Station,TX 77840 Re: Roans Chapel Commercial Subdivision(PP) 14-00900245 Dear Mr. Cuaron: Attached are the responses to the Preliminary Plan Comments and the following: • (1) 24"x 36"copies of the revised Preliminary Plan If you have any questions,please do not hesitate to call. Very truly yours, Schultz Engineering,LLC. 1 Deven Doyen,P. . Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com Staff Review Comments — No. 1 Roans Chapel Commercial Subdivision (PP) —# 14-00900245 PLANNING 1. Please show the approximate location, size of line, design pressure for the gas pipeline at the southwest corner of the property. Energy Transfer Company owns the pipeline and they have been contacted to mark the location of the line. Once the line location is known it will be added to the Preliminary Plan. The line is 10.75 inch, low-pressure natural gas gathering line. 2. The existing block length along Roans Chapel Rd between State HWU 30 and Golden Mist exceeds 1,500 feet. Please revise the plat to provide a street that stubs to the Copus Tract or revise the application to apply for a subdivision waiver to the block length requirement. Attached is a revised application with waiver request. 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Noted. BRAZOS COUNTY 1. The roadway facility with the best pavement structure to handle commercial development is SH 30. Has TxDOT been approached and denied access? While customers and employee parking could be addressed from Roans Chapel Road - Freight Deliveries, collection of commercial waste, etc. will require wide Driveways, deeper pavement structure and a denser pavement surface than exists on Roans Chapel Road today. Is the basis for Note 22 a denial from TxDOT or refusal of applicant to work with TxDOT? Lot 6 access from SH 30 is hindered by an existing drainage way and culverts that go under SH 30. There is also inadequate separation distance from Roans Chapel Road for a proposed driveway. The SH 30 frontage for this tract is 372'which does not meet the 475'spacing requirement for TxDOT. 2. With dedication of ROW along Roans Chapel Road — is applicant providing for relocation of utilities within dedication so that roadway improvements can be made? The applicant is dedicating R.O.W. along Roans Chapel Rd to meet the 70' wide street right-of- way requirement and is not relocating any utilities. 3. With regard to Note 6 — rural roadway subdivision standards may be an improper design for a commercial development (as stated in previous review comment): Can applicant provide an engineering analysis (not full blown TIA)which would provide: 1. Traffic Data. DHV, ADT, Percent Trucks (T) generated to/from the proposed lots 2. Soil characteristics and strength 3. Traffic growth rates 4. Stage development 5. On-site Parking 6. Drainage 7. Proposed Geometry (Turning Radii and Widths of Driveways Needed) 8. T, Percentage of Trucks, the quantity of trucks during the ADT or DHV, expressed as a percent of that total traffic. For the purpose here, light delivery trucks, such as panels and pick-ups, are considered as passenger cars. In lieu of the actual field data, T can be assumed as 30% for Roans Chapel Road Road. D. Trucks shall be further identified as follows, during the traffic counting. 2DT - Unit truck, two axles 3SU - Unit truck, three axles 2S1 - Semi truck, two axles on cab, one axle on tailor 2S2 - Semi truck, two axles on cab, two axles on tailor 2AX -Truck with five axles or more The owners/developers of the subdivision will be developing their businesses on 3 of the lots and will be office/warehouse structures with storage yards and occasional large trucks coming to the site for deliveries. The building and parking requirements are not known at this time. The use for the remaining 3 lots is anticipated to be similar to the others. 4. For Drainage — provide estimated flows from lots into roadway ditches and analyze possible effects on existing roadway ditches and downstream cross-culvert. Each lot will provide detention mitigating any increases in peak runoff. Existing roadway ditches and downstream cross-culverts should function as they do under existing conditions. 5. For Drainage — provide a Private Drainage Easement to convey flows from Lots 3, 4, 5 to proposed detention areas. Indicate how detention and other Private Drainage Easements will be maintained. How are detention areas sized and "apportioned" to each lot? Private Drainage Easement for Lofts 3, 4, & 5 has been added and Note 24 has been added for maintenance of Private Drainage Easements and detention areas. 6. Would applicant consider monetary donation to county toward any needed roadway and drainage improvements in public ROW as determined by further engineering analysis (by applicant)? The developer does not wish to contribute monetarily to roadway and drainage improvements in the public ROW at this time. 7. Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point. Note 22 has been revised to address Lot 6 access. 8. Applicant needs to provide a letter from TxDOT that development will NOT require the addition of a dedicated turn lane from SH 30 EB to Roans Chapel Road. TxDOT has been contacted by the City of College Station and does not have any comments at this time. 9. County would desire (can't require) a lot width of 200 feet which would enable each lot to have individual driveway access. Shared access may otherwise be required to/from several (not all of the lots). Noted. The proposed use of some of the lots are for office/warehouse use which will have limited traffic to each lot. 10. Meet with County/City? to further discuss items resulting from review comments. Noted. Please let us know if you would like to meet with the Owner/Developer. ENGINEERING COMMENTS NO. 1 1. FYI with the submittal of construction documents, provide a written verification that the Wickson Creek Special Utility District is able to properly serve the proposed lots. Wickson Creek SUD letter is attached, but a water main extension will be required for this project. 2. Please increase the proposed Fire Hydrant symbol size for more legibility. Fire hydrant symbol size has been increased. 3. FYI the proposed 8" water line along Lot 1 has only a 5' horizontal clearance from the electrical power pole which may pose maintenance and construction issues. This can be addressed on Final plat with construction documents. Noted. 4. Please include in note 23 that detention area(s) to be privately maintained by respective parties/lot owners. Note 24 has been added. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. Noted. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Noted. FIRE 1. No comments at this time. Noted. SANITATION 1. Sanitation is ok with this project. Noted. 440) (icriff444 CITY OF COLLEGE STATION Home of-Texas ASM University` MEMORANDUM DATE: October 2, 2014 TO: Kenn Walsh, via; kenn(p�keysandwalsh.com FROM: Jerry Cuaron, Staff Planner SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP) Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24" x 36" copy of the revised Preliminary Plan Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may beplaced on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/home/index.asp?paqe=2481 If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: KWK Ventures & JDMD Development, via: kenn(a�keysandwalsh.com Joe Schultz, via; joeschultz84(c�verizon.net P&DS Project No. 14-00900245 cc: Alan Munger, Brazos County Planning & Traffic, via fax 775.0453 Case file #14-00900245 Planning 6 Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 Staff Review Comments — No. 1 Roans Chapel Commercial Subdivision (PP) —# 14-00900245 PLANNING 1. Please show the approximate location, size of line, design pressure for the gas pipeline at the southwest corner of the property. 2. The existing block length along Roans Chapel Rd between State HWU 30 and Golden Mist exceeds 1,500 feet. Please revise the plat to provide a street that stubs to the Copus Tract or revise the application to apply for a subdivision waiver to the block length requirement. 3. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Review by: Jerry Cuaron Date: September 30, 2014 BRAZOS COUNTY 1. The roadway facility with the best pavement structure to handle commercial development is SH 30. Has TxDOT been approached and denied access? While customers and employee parking could be addressed from Roans Chapel Road - Freight Deliveries, collection of commercial waste, etc. will require wide Driveways, deeper pavement structure and a denser pavement surface than exists on Roans Chapel Road today. Is the basis for Note 22 a denial from TxDOT or refusal of applicant to work with TxDOT? 2. With dedication of ROW along Roans Chapel Road — is applicant providing for relocation of utilities within dedication so that roadway improvements can be made? 3. With regard to Note 6 — rural roadway subdivision standards may be an improper design for a commercial development (as stated in previous review comment): Can applicant provide an engineering analysis (not full blown TIA) which would provide: 1. Traffic Data. DHV, ADT, Percent Trucks (T) generated to/from the proposed lots 2. Soil characteristics and strength 3. Traffic growth rates 4. Stage development 5. On-site Parking 6. Drainage 7. Proposed Geometry (Turning Radii and Widths of Driveways Needed) 8. T, Percentage of Trucks, the quantity of trucks during the ADT or DHV, expressed as a percent of that total traffic. For the purpose here, light delivery trucks, such as panels and pick-ups, are considered as passenger cars. In lieu of the actual field data, T can be assumed as 30% for Roans Chapel Road Road. D. Trucks shall be further identified as follows, during the traffic counting. 2DT - Unit truck, two axles 3SU - Unit truck, three axles 2S1 - Semi truck, two axles on cab, one axle on tailor 2S2 - Semi truck, two axles on cab, two axles on tailor 2AX - Truck with five axles or more 4. For Drainage — provide estimated flows from lots into roadway ditches and analyze possible effects on existing roadway ditches and downstream cross-culvert. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these p2lans af 3 that have not been pointed out to the City,will constitute a completely new review. 5. For Drainage — provide a Private Drainage Easement to convey flows from Lots 3, 4, 5 to proposed detention areas. Indicate how detention and other Private Drainage Easements will be maintained. How are detention areas sized and "apportioned" to each lot? 6. Would applicant consider monetary donation to county toward any needed roadway and drainage improvements in public ROW as determined by further engineering analysis (by applicant)? 7. Provide 150' corner clearance on Lot 6 from SH 30 to a potential driveway access point. 8. Applicant needs to provide a letter from TxDOT that development will NOT require the addition of a dedicated turn lane from SH 30 EB to Roans Chapel Road. 9. County would desire (can't require) a lot width of 200 feet which would enable each lot to have individual driveway access. Shared access may otherwise be required to/from several (not all of the lots). 10. Meet with County/City? to further discuss items resulting from review comments. Reviewed by: Alan Munger Date: September 26, 2014 ENGINEERING COMMENTS NO. 1 1. FYI with the submittal of construction documents, provide a written verification that the Wickson Creek Special Utility District is able to properly serve the proposed lots. 2. Please increase the proposed Fire Hydrant symbol size for more legibility. 3. FYI the proposed 8" water line along Lot 1 has only a 5' horizontal clearance from the electrical power pole which may pose maintenance and construction issues. This can be addressed on Final plat with construction documents. 4. Please include in note 23 that detention area(s) to be privately maintained by respective parties/lot owners. Reviewed by: Kevin Ferrer Date: September 24, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: September 29, 2014 FIRE 1) No comments at this time Reviewed by: Steve Smith Date: September 23, 2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 23, 2014 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these 3laf 3 that have not been pointed out to the City, will constitute a completely new review. CITY OP COLLEGE STATION Home of texas A&M University" MEMORANDUM 19, 2014 • " 1 DATE: September � 1 TO: Kenn Walsh, via; kenn ,kevsandwaish.com FROM: Jerry Cuaron, Staff Planner SUBJECT: ROANS CHAPEL COMMERCIAL SUBDIVISION (PP) Thank you for the submittal of your Preliminary Plan application. Kevin Ferrer, Graduate Civil Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Friday, October 3, 2014. If you have questions in the meantime, please feel free to contact us. PC: KWK Ventures & JDMD Development, via; kenn(ckeysandwaish.com Joe Schultz, via; joeschultz84 aAverizon.net P&DS Project No. 14-00900245 Planning u"Development Services P.O.ROX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS77842 TEL.979 764.3570 •FAX. 979.764.3496 cstx.eovldevsentces