Loading...
HomeMy WebLinkAboutWater & Sanitary Report Water & Sanitary Sewer Report FOR SUMMIT CROSSING SUBDIVISION PHASE 2B College Station Brazos County, Texas September 5, 2014 +� sE OF TE,\, tII i* S1 . * /# % * : RAR!• A. uupoz:bl / P.�/CEN56)••‹ N t0- oq ..�S/ONAL � Prepared For: DWS Development, Inc. PO Box 4508 Bryan,TX 77803 Prepared By: RME Consulting Engineers Texas Firm Registration No. F-4695 P.O. Box 9253 College Station,TX 77845 RME No. 298-0542 Water & Sanitary Sewer Report SUMMIT CROSSING SUBIDIVISION PHASE 2B College Station Brazos County, Texas TABLE OF CONTENTS: PAGE 1.0 General Information 1 1.1 Scope of Report and Proposed Development 1 1.2 Site and General Location 2 1.3 Description of Existing Conditions 2 1.4 Existing Water Distribution System 2 1.5 Existing Sanitary Sewer Collection System 3 2.0 Water System Improvements 3 2.1 Proposed Water System Configuration 3 2.2 Domestic Water Supply Requirements 4 2.3 Fire Flow Requirements 4 2.4 Hydraulic Modeling Methodology 4 2.5 Modeling Results&Conclusions 4 3.0 Sanitary Sewer Improvements 5 3.1 Proposed Sanitary Sewer Configuration 5 3.2 Sanitary Sewer Flow Calculations 5 3.3 Hydraulic Modeling Methodology 6 3.4 Modeling Results&Conclusions 6 ATTACHMENTS: Summit Crossing Subdivision—Master Development Plan Vicinity Map Proposed Water System Map KYPIPE Hydraulic Analysis Data Proposed Sanitary Sewer System Map WINSTORM Hydraulic Analysis Data 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-i Water & Sanitary Sewer Report SUMMIT CROSSING SUBIDIVISION PHASE 2B College Station Brazos County, Texas 1.0 GENERAL INFORMATION 1.1 Scope of Report and Proposed Development: This report addresses the water and sanitary sewer improvements for the Summit Crossing, Phase 2B development conditions. This new development will consist of 34 lots (4.773 acres). This master planned subdivision which is approximately a 113-acre development located within the city limits of College Station, Texas. The entire master planned subdivision will consist of high density single family residential (89.64 acres), light commercial/retail use (-7.37 acres), and the remainder consisting of open space and parkland dedication. The detail usage and layout of the Summit Crossing development is more fully illustrated on the Summit Crossing Subdivision — Master Development Plan, which is contained in the"Attachment" section of this report. Currently Phase One of the subdivision is all that is improved. The proposed development and correlating water and sanitary sewer improvements are designed and analyzed in accordance with the criteria outlined in the "B/CS Unified Technical Specifications and Design Guidelines" (UTSDS)manual of the City of College Station (CoCS) and Chapters 290 & 317 of the Texas Commission on Environmental Quality(TCEQ)Rules & Regulations. 1.2 Site and General Location: The proposed development, Summit Crossing, Phase 2B, consists of 4.773 acre tract of land wholly contained within the 89.64 acre parent tract of the master planned subdivision. The proposed subdivision has access to SH 30 (Harvey Road East) and FM 158 (Boonville Road) along its north and east property lines. Adjacent existing developments generally consist of the Crescent Pointe development to the south and the Brazos Super Trac convenience center to the northeast. All of these developments are in the College Station sewer service area and are provided utility service by CoCS. Land adjacent to this development to the southwest is currently owned by the same development group (The Summit Crossing, LLC) and is anticipated to experience development of commercial, retail, office, and residential improvements in the near future. A Vicinity Map, for this project site, is provided and is located in the "Attachment" portion of this manual. This map is being provided as an aid in locating the site. Drawings describing the work and its specific locations are contained in the Construction Drawings prepared by RME Consulting Engineers, College Station,Brazos 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-1 Summit Crossing,Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 County, TX. These Construction Drawings are included as part of this Water& Sanitary Sewer Report by reference. 1.3 Description of Existing Conditions: The 113-acre parent tract, which contains the proposed development of Summit Crossing Subdivision (Phase 2B), is a moderately well sloping (approximately 1.0%) undeveloped site with natural and improved drainage systems that convey runoff to the Harvey Hillsides Creek which is a tributary of Carters Creek. The proposed development area is unimproved with land-cover general consists of open grassy areas with some thick brush, weeds, and trees along the unnamed tributary. Elevations range on the master planned subdivision from approximately 287' Mean Sea Level (MSL) to approximately 342' MSL. 1.4 Existing Water Distribution System: The project site is moderately well served by existing water lines. The utility provider, for water service, will be the City of College Station. The existing water supply lines are summarized as follows: 1. 12"DIP that is located on the north side of Harvey Road East(SH No. 30); 2. Two 8" PVC water lines that extend to the current terminus of Buena Vista and Lonetree Drive (installed with the Phase One development and extended with Phase 2A); ORIGINAL flow tests were obtained from the CoCS Public Utilities Department(CoCS- PUD) from a fire hydrant existing on a 12" stub-out from the 12" DIP Harvey Road waterline and is located on the southeast corner of the intersection of SH 30 and Pamela Lane. This flow test was conducted on January 16, 2008 under the direction of Mr. Matthew Matcek and witnessed by Mr. Sergio Vasquez. The flow data is summarized below in Table #1 — Flow Test Data. The original KYPIPE model for the Phase One development will be utilized and expanded to include these proposed water system improvements. TABLE #1 FLOW TEST DATA Flow Pilot Static Fire Static Residual Hydrant Reading Flow Hydrant Pressure Pressure No. Location (psi) (gpm) No. (psi) (psi) G-068 Pamela Ln @ Harvey Rd. 75 1455 G-013 108 104 Note: The reported flow is from the 2.5"nozzle of the identified flow hydrant; 1.5 Existing Sanitary Sewer Collection System: The proposed subdivision will be served by the existing sanitary sewer collection lines installed with Phase One of this development and extended with Phase 2A. The proposed sanitary sewer collection system, for Phase 2B, will discharge into two (2) separate collection system but all sewer will eventually discharge into the sewer main interceptor located south and parallel with SH No. 30. 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-2 Summit Crossing,Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 2.0 WATER SYSTEM IMPROVEMENTS 2.1 Proposed Water System Configuration: Two (2) existing 8" water lines where installed and terminated with a blow-off valves at the existing north end of Buena Vista and Lonetree Drive (Phase 2A). These terminuses will be intended for the proposed water distribution and into/thru the subject development. The general requirements of the UTSDG for water line design layout are briefly listed as follows: • 4" water lines will be installed where the service length is less than or equal to five hundred(500')feet; • 6" water lines may be allowed up to a maximum of 1,500 feet in length and must connect at each end to an 8 inch or larger main and shall have no more than 2 fire hydrants or flushing points. Where it is not possible to meet this requirement, a 6- inch main may be extended to a maximum of 800 feet in length and shall terminate with a fire hydrant or blow-off assembly; • Fire hydrants will be installed so that no residence is greater than five hundred (500') from a hydrant. Each fire hydrant will be analyzed to provide a fire flow of 1,000 gpm. As mentioned earlier the water distribution system will provide fire protection and domestic water service. The Water System Man is included in the "Attachment" portion of this report and more fully details the proposed water system improvements. The proposed water lines, and appurtenances, will be constructed and installed in accordance with the UTSDG and TCEQ Chapter 290. Unless specifically identified on the Construction Drawings, the proposed water lines will be of type PVC AWWA C900 DR14 water line pipe. Public utility lines will be installed in existing public utility easements or placed in proposed public utility easements which will be dedicated by plat or by separate instruments. 2.2 Domestic Water Supply Requirements: An average daily water consumption of 1.5 gpm per connection or dwelling unit will be utilized for analysis of the proposed water distribution system at normal conditions. During static conditions a minimum 35 psi pressure rating will be maintained. 2.3 Fire Flow Requirements: The fire flow demand, for the proposed development, will require that each residence be protected by a minimum 1,000 gpm. During fire flow conditions the minimum static pressure shall not be less than 20 psi. 2.4 Hydraulic Modeling Methodology: As allowed in the UTSDG a water distribution computer model was used to determine pressure and flow results for the proposed water system. The hydraulic analysis and 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-3 Summit Crossing,Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 corresponding results were determined by using the KYPIPE hydraulic program, for water systems, and also utilized the original hydraulic model expanded to include these proposed water distribution improvements. Using the calculated domestic water demand and fire flow requirements, the proposed water system was analyzed, with KYPIPE, to determine if it met the minimum design criteria set forth in the UTSDG. These minimum criteria are summarized as follows. Since the irrigation is relatively small in comparison to other flows, and infrequent in use, it was not considered in the analysis. 1. Under normal flow conditions the residual pressures in the area, serviced by the proposed system, must meet TCEQ requirements at all times thus providing a minimum static pressure of 35 psi; 2. During fire flow conditions, the proposed system and adjacent infrastructure must provide the required fire flow with a minimum residual pressure of 20 psi; 3. At all analyzed conditions, no water line shall have a velocity greater than 12 fps in both existing and proposed mains; 2.5 Modeling Results& Conclusions: Utilizing the original KYPIPE model and expanding it to include Phase 2A water demands, and fire flow requirements, for the proposed water system improvements, and adjacent infrastructure, it was determined to adequately meet or positively exceed the minimum design standards. KYPIPE Hydraulic Analysis Data, resulting from both domestic water demands and all fire flow conditions are contained in this report in the "Attachment" portion. Resulting summary information for both conditions are illustrated below in Table #2 — Water System Summary and identify the "worse-case" location in the proposed distribution system (lowest pressure node or highest velocity in pipe). The entire water system model, for each scenario is fully contained with the KYPIPE Hydraulic Analysis Data. TABLE #2 WATER SYSTEM SUMMARY PIPE DATE NODE DATA Residual Scenerio KYPIPE Section/ Pipe Size Flow Velocity Node Pressure Number Name Phase (in) (gpm) (fps) Name (psi) DOMESTIC FLOW CONDITION P-3 I ONE I 8 I 146.73 I 0.94 I J-9 I 93.27 FIRE FLOW CONDITIONS 1 I P-3 I ONE I 8 I 685.39 I 4.37 I FH-6 I 88.46 Domestic Flow Scenario: 1. Domestic design flows at completion of Phase 2B; Fire Flow Scenario: 1. 1,000 gpm from FH-6—Intersection of Buena Vista and Lonetree; 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-4 Summit Crossing,Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 3.0 SANITARY SEWER IMPROVEMENTS 3.1 Proposed Sanitary Sewer Configuration: The proposed sanitary sewer collection system, for Summit Crossing, Phase 2B, will consist of an 8" and 6" sanitary sewer line extension. These sanitary sewer line extensions will be expansions of the existing Summit Crossing collection system which conveys sewer in a generally southerly direction to the sewer main interceptor located south and parallel with SH No. 30. The Sanitary Sewer System Map is included in the "Attachment" portion of this report and more fully details the proposed sanitary sewer system improvements. The sewer is conveyed to the main interceptor by two (2) means as identified below: (1) Extensions of the 6" sanitary sewer line (along Lonetree Dr.) conveys wastewater to the 15" VCT inceptor line located near the main detention facility of Summit Crossing (near the intersection of SH 30 & Pamela Lane). Per phone conversation with Ericka Bridges (CoCS P&DS) this inceptor line has capacity to receive additional sewer flow from this development; (2) Extension of the 8" sanitary sewer (rear of Block Five) conveys wastewater through the Cresent Pointe development and eventually to the 18" VCT inceptor line south of SH No. 30 and parallel to Harvey Hillsides Creek. The proposed sanitary sewer lines, and appurtenances,will be constructed and installed in accordance with the UTSDG. Unless specifically identified on the Construction Drawings,the proposed sanitary sewer lines will be of type PVC SDR-26, ASTM D3034 sewer line pipe. Public utility lines will be installed in existing public utility easements or placed in proposed public utility easements which will be dedicated by plat or by separate instruments. 3.2 Sanitary Sewer Flow Calculations: The sanitary sewer requirements, for the master planned development, were derived by Method 2 —"Land Use Determination" of the UTSDS. Resulting average sanitary sewer flow values were calculated, for all complete, permitted phases and/or proposed developments, and the results are summarized in Table #3 — "Sanitary Sewer Flows" shown below. As calculated, the ultimate Average Daily Flow (ADF) for this phase of the Summit Crossing is 9,078 gpd and a 2-Hour Peak Flow (PF) at 0.06 cfs. Total estimated flows, for the entire master planned development, and surrounding areas, were reported in Section 3.2 (Table #1) of the original Water-Sewer Report for Summit Crossing(dated February 4, 2008). 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-5 Summit Crossing,Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 TABLE#3 - SANITARY SEWER FLOWS Average Average 2-Hour Daily Flow Dwelling Daily Flow Peak Flow Peak Flow Section/Phase (gpd/cap) Units (gpd) (gph) (cfs) Phase one 100 114 30,438 5,073 0.19 Phase 2A 100 46 12,282 2,047 0.08 Phase 2B 100 34 9,078 1,513 0.06 TOTAL EXPECTED FLOWS= 51,798 8,633 0.32 Flow Determination Notes: 1) Residential density is at 2.67 capita/Dwelling Unit; 2) Commercial uses were estimated at 30 capita/acre; 3) Average Daily flows, for each use, were assigned per Table III"Average Wastewater Generations"per the UTSDS; 4) Peaking factor of 4.0 was applied to the Average Daily Flows to determine the Peak Flow which is used for line sizing; 3.3 Hydraulic Modeling& Methodology: As allowed in the UTSDG, a hydraulic computer model was used to determined flow results for the proposed sanitary sewer collection lines. The hydraulic analysis and corresponding results were determined by using the WINSTORM hydraulic program, for stormwater modeling. Though this TxDOT program's typical use is for modeling gravity stormwater systems it can easily be applied for hydraulic modeling of gravity sewer systems. Peak sewer flows were directly inputted at manholes in lieu of flows being generated by hydrological equations at logical locations along the proposed sewer lines. 3.4 Modeling Results& Conclusions: Using the original WINSTORM model, of Summit Crossing, and expanding it to include Phase 2B, sanitary sewer flows were input into the proposed sewer system and it was determined that the proposed expanded system has adequate capacity. WINSTORM Hydraulic Analysis Data, as resulting from sanitary sewer analysis, is contained in this report in the "Attachment" portion. Resulting summary information is illustrated below in Table#4—Sanitary Sewer Summary. 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-6 Summit Crossing, Phase 2B RME Consulting Engineers Water&Sanitary Sewer Report September 5,2014 TABLE #4 SANITARY SEWER COLLECTION SYSTEM Upstream Downstream Line Pipe Size Slope Q Capacity Velocity Element Element No. (in) (%) (cfs) (cfs) (fps) EX-MH1 EX-MH2 1 12 0.60 0.29 2.75 2.27 MH-1 EX-MH1 2 12 2.12 0.29 5.19 3.56 MH-2 MH-1 3 10 0.31 0.29 1.20 1.81 iii MH-3 MH-2 4 10 0.97 0.29 2.15 2.76 c MH-4 MH-3 5 10 0.76 0.18 1.89 2.19 -' MH-5 MH-4 6 6 0.77 0.15 0.46 2.07 MH-6 MH-5 7 6 0.80 0.12 0.50 2.09 MI-I-7 MH-6 8 6 0.80 0.10 0.50 1.97 "S2„ MH-8 MH-3 9 6 1.57 0.11 0.70 2.58 MH-9 M14-8 10 6 1.88 0.04 0.77 2.05 "S3" MH-10 MH-7 11 6 0.80 0.03 0.50 1.35 „S4,. MH-11 MH-8 12 6 0.80 0.05 0.50 1.65 PHASE 2A „Si„ MH-12 MH-7 13 6 1.00 0.06 0.56 0.31 MH-13 MH-12 14 6 1.00 0.04 0.56 0.81 "S3" MH-14 MH-10 15 6 1.25 0.02 0.63 1.44 PHASE 2B S2.. MH-19 MH-14 I 16 6 1.25 I 0.01 0.68 I 1.26 Sanitary Sewer Notes: 1) Velocities within a proposed pipe runs (highlighted) that are below the required 2.0 fps meet or exceed the minimum required slope for a 6" sanitary sewer, but have so little Q from the upstream lots that it is impractical to achieve the required 2.0 fps. This deviation from the B/CS standards will be noted in the B/CS Acknowledgement Letter prepared by this office; 2) Manning's"N"utilized for PVC pipe is 0.013; 298-0542 Water-Sewer Report-SC-Ph2B.docx Page-7 SUMMIT CROSSING SUBDIVISION MASTER DEVELOPMENT PLAN VICINITY MAP AZ*S GA * BR t.N :fri UN . A ►`OT TO ?l 158_ i�� ALE :00 PAS 28 CROSSING: %jilt rah, • VS 9 A \ e�GBRYAN : • ?* 0 � ���/�� 30 7 0o * e A S0 ‘4‘•AIII‘ Siii, i ,,2V 3 r 'BRAZ• COUN♦I , I` OT TO SCA WATER SYSTEM MAP KYPIPE HYDRAULIC ANALYSIS DATA SUMMIT CROSSING,PH 2B DOMETIC FLOW CONDITION * * * * * * * * * * K Y PI P E 5 * * * * * * * * * * * * * Pipe Network Modeling Software * * * * Copyrighted by KYPIPE LLC * * Version 5 - February 2010 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Fri Sep 05 10:38:52 2014 Master File : c:\users\rabon metcalf\rme\projects\298-0542 dws-summit cross- ph2b\engineering\0542w1ra.KYP\0542w1ra.P2K ************************************************ SUMMARY OF ORIGINAL DATA ************************************************ U NITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig . P IPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N AME #1 #2 (ft) (in) COEFF. LOSS COEFF. P-1 3-1 R-1 480.00 12.00 123.7472 0.00 P-2 J-2 J-1 602.00 12.00 123.7472 0.00 P-3 J-1 J-3 263.00 8.00 136.8736 0.74 P-4 J-2 FH-1 142.00 8.00 136.8736 0.74 P-5 FH-1 J-4 120.00 8.00 136.8736 0.57 P-6 J-3 FH-3 181.00 8.00 136.8736 0.57 P-7 FH-3 J-5 124.00 8.00 136.8736 0.57 P-8 J-5 J-7 210.00 8.00 136.8736 0.57 P-9 J-4 J-6 304.00 8.00 136.8736 0.57 P-10 J-6 FH-2 191.00 8.00 136.8736 0.57 P-11 J-4 J-3 578.00 6.00 136.8736 0.34 P-12 J-6 J-5 550.00 6.00 136.8736 0.34 P-13 FH-2 J-8 95.50 8.00 139.4518 0.57 P-14 J-8 FH 4 232.69 8.00 139.4518 0.57 P-15 J-7 FH 5 95.64 8.00 139.4518 0.57 P-16 FH 5 FH 6 344.00 8.00 139.4518 0.57 P-17 J-8 FH 5 522.67 6.00 139.4518 3.34 P-18 FH 4 FH 6 570.00 8.00 139.4518 2.24 N ODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) FH 4 24.00 300.00 FH 5 31.50 304.00 FH 6 37.50 306.50 FH-1 6.00 293.50 SUMMIT CROSSING,PH 2B DOMETIC FLOW CONDITION NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE gpm ft ft ft psi FH 4 24.00 521.60 300.00 221.60 96.03 EH 5 31.50 521.60 304.00 217.60 94.30 FH 6 37.50 521.60 306.50 215.10 93.21 FH-1 6.00 521.74 293.50 228.24 98.91 FH-2 0.00 521.61 300.00 221.61 96.03 FH-3 18.00 521.66 296.50 225.16 97.57 J-1 30.00 521.84 288.50 233.34 101.12 J-2 13.50 521.80 290.50 231.30 100.23 J-3 33.00 521.71 294.00 227.71 98.67 J-4 36.00 521.70 295.50 226.20 98.02 J-5 18.00 521.64 297.00 224.64 97.34 J-6 37.50 521.63 298.00 223.63 96.91 J-7 4.50 521.61 301.00 220.61 95.60 J-8 25.50 521.60 302.50 219.10 94.95 R-1 FH=G013 ---- 522.00 282.00 240.00 104.00 SUMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME gpm TITLE R-1 315.00 FH=G013 NET SYSTEM INFLOW = 315.00 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 315.00 ***** HYDRAULIC ANALYSIS COMPLETED ***** SUMMIT CROSSING,PHASE 2B FIRE FLOW SCENARIO#1 * * * * * * * * * * K Y P I P E 5 * * * * * * * * * * * * Pipe Network Modeling Software * * * Copyrighted by KYPIPE LLC * * Version 5 - February 2010 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Fri Sep 05 10:42:23 2014 Master File : c:\users\rabon metcalf\rme\projects\298-0542 dws-summit cross- ph2b\engineering\0542w1ra.KYP\0542w1ra.P2K ************************************************ SUMMARY OF O R I G I NAL DATA ************************************************ UNITS SPECIFIED FLOWRATE = gallons/minute HEAD (HGL) = feet PRESSURE = psig PIPELINE DATA STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE P IPE NODE NAMES LENGTH DIAMETER ROUGHNESS MINOR N AME #1 #2 (ft) (in) COEFF. LOSS COEFF. P-1 3_1 R-1 480.00 12.00 123.7472 0.00 P-2 3-2 3-1 602.00 12.00 123.7472 0.00 P-3 J-i J-3 263.00 8.00 136.8736 0.74 P-4 J-2 FH-1 142.00 8.00 136.8736 0.74 P_5 FH-1 3-4 120.00 8.00 136.8736 0.57 P-6 J-3 FH-3 181.00 8.00 136.8736 0.57 P_7 FH-3 3-5 124.00 8.00 136.8736 0.57 P-8 3-5 J-7 210.00 8.00 136.8736 0.57 P-9 3-4 3-6 304.00 8.00 136.8736 0.57 P-10 3-6 FH-2 191.00 8.00 136.8736 0.57 P-11 J-4 J-3 578.00 6.00 136.8736 0.34 P-12 J-6 3-5 550.00 6.00 136.8736 0.34 P-13 FH-2 J-8 95.50 8.00 139.4518 0.57 P-14 3-8 FH 4 232.69 8.00 139.4518 0.57 P-15 3-7 FH 5 95.64 8.00 139.4518 0.57 P-16 FH 5 FH 6 344.00 8.00 139.4518 0.57 P-17 3-8 FH 5 522.67 6.00 139.4518 3.34 p-18 FH 4 FH 6 570.00 8.00 139.4518 2.24 NODE DATA NODE NODE EXTERNAL JUNCTION EXTERNAL NAME TITLE DEMAND ELEVATION GRADE (gpm) (ft) (ft) FH 4 24.00 300.00 FH 5 31.50 304.00 FH 6 1037.50 306.50 FH-1 6.00 293.50 SUMMIT CROSSING, PHASE 2B FIRE FLOW SCENARIO#1 NODE RESULTS NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE ppm ft ft ft Ps1 FH 4 24.00 512.63 300.00 212.63 92.14 FH 5 31.50 513.12 304.00 209.12 90.62 FH 6 1037.50 510.64 306.50 204.14 88.46 FH-1 6.00 518.10 293.50 224.60 97.33 FH-2 0.00 514.09 300.00 214.09 92.77 FH-3 18.00 516.08 296.50 219.58 95.15 J-1 30.00 519.79 288.50 231.29 100.22 J-2 13.50 519.14 290.50 228.64 99.08 J-3 33.00 517.40 294.00 223.40 96.81 J-4 36.00 517.25 295.50 221.75 96.09 J-5 18.00 515.19 297.00 218.19 94.55 J-6 37.50 515.21 298.00 217.21 94.12. J-7 4.50 513.79 301.00 212.79 92.21 J-8 25.50 513.49 302.50 210.99 91.43 R-1 FH=G013 ---- 522.00 282.00 240.00 104.00 SUMMARY OF INFLOWS AND OUTFLOWS (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME ppm TITLE R-1 1315.00 FH=G013 NET SYSTEM INFLOW = 1315.00 NET SYSTEM OUTFLOW = 0.00 NET SYSTEM DEMAND = 1315.00 ***** HYDRAULIC ANALYSIS COMPLETED ***** SANITARY SEWER SYSTEM MAP WINSTORM HYDRAULIC ANALYSIS DATA stmOutput.txt WinStorm (STORM DRAIN DESIGN) Version 3. 05, Jan. 25, 2002 Run @ 9/5/2014 10: 54 : 51 AM PROJECT NAME : 298 JOB NUMBER : 0542 PROJECT DESCRIPTION : Summit Crossing, Phase 2B DESIGN FREQUENCY 2 Years MEASUREMENT UNITS: ENGLISH OUTPUT FOR DESIGN FREQUENCY of: 2 Years Runoff Computation for Design Frequency. ID C Value Area Tc Tc Used Intensity Supply Q Total Q (acre) (min) (min) (in/hr) (cfs) (cfs) MH 3 0 .0 0. 00 10.00 0 . 00 0. 00 0 . 005 0 . 005 MH 4 0. 0 0. 00 10.00 0 . 00 0. 00 0. 028 0 . 028 MH 5 0. 0 0. 00 10. 00 0 . 00 0. 00 0. 030 0. 030 MH 8 0.0 0. 00 10. 00 0. 00 0. 00 0. 018 0 . 018 MH 9 0. 0 0.00 10. 00 0. 00 0 . 00 0. 018 0 . 018 MH 10 0 . 0 0. 00 10. 00 0 . 00 0 . 00 0. 025 0 . 025 MH 11 0. 0 0. 00 10 . 00 0 . 00 0 . 00 0 . 053 0 . 053 MH 6 0 .0 0 . 00 10 . 00 0 . 00 0 . 00 0 . 020 0 . 020 MH 7 0. 0 0 . 00 10 . 00 0. 00 0. 00 0 .012 0.012 MH 12 0 . 0 0.00 10 . 00 0 . 00 0 . 00 0 . 020 0.020 MH 13 0 . 0 0. 00 10 .00 0 .00 0.00 0 .040 0 .040 MH 14 0 . 0 0 .00 10.00 0 . 00 0. 00 0 . 020 0. 020 MH 19 0 .0 0. 00 10. 00 0 .00 0. 00 0. 010 0. 010 Cumulative Junction Discharge Computations Node Node Weighted Cumulat. Cumulat. Intens . User Additional Total I .D. Type C-Value Dr.Area Tc Supply Q Q in Node Disch. (acres) (min) (in/hr) cfs) (cfs) (cfs) EX-MH2 CircMh 0.000 0 . 00 21. 53 4 .25 0.299 0. 00 0. 299 EX-MH1 CircMh 0. 000 0 . 00 21 .53 4 .25 0.299 0 . 00 0.299 MH 1 CircMh 0 .000 0 .00 21. 41 4 .26 0.299 0. 00 0.299 MH 2 CircMh 0. 000 0. 00 17 . 45 4 .79 0. 299 0 . 00 0 . 299 MH 3 CircMh 0 . 000 0. 00 16. 92 4 . 87 0 . 299 0 .00 0 . 299 MH 4 CircMh 0 . 000 0. 00 14 . 63 5. 26 0. 175 0. 00 0. 175 MH 5 CircMh 0.000 0. 00 12 . 13 5.78 0 . 147 0. 00 0. 147 MH 6 CircMh 0.000 0. 00 10. 00 6. 33 0 . 117 0. 00 0. 117 MH 7 CircMh 0. 000 0. 00 10. 00 6. 33 0. 097 0. 00 0. 097 MH 8 CircMh 0. 000 0. 00 10. 00 6. 33 0 . 119 0. 00 0. 119 Page 1 stmOutput.txt MH 9 CircMh 0. 000 0. 00 10. 00 6. 33 0. 048 0. 00 0 . 048 MH 10 CircMh 0. 000 0. 00 0. 00 0 . 00 0. 025 0. 00 0 . 025 MH 11 CircMh 0. 000 0 . 00 0. 00 0. 00 0 . 053 0. 00 0 . 053 MH 12 CircMh 0 .000 0 . 00 10. 00 6. 33 0 . 060 0. 00 0. 060 MH 13 CircMh 0 . 000 0 . 00 0 . 00 0 .00 0 . 040 0. 00 0. 040 MH 14 CircMh 0.000 0 .00 10. 00 6.33 0 . 030 0 .00 0. 030 MH 19 CircMh 0 . 000 0 .00 0. 00 0. 00 0 . 010 0. 00 0. 010 Conveyance Configuration Data Run# Node I. D. Flowline Elev. US DS US DS Shape # Span Rise Length Slope n_value (ft) (ft) (ft) (ft) (ft) (6) 1 EX-MH1 EX-MH2 273. 38 272 . 78 Circ 1 0. 00 1. 00 100. 79 0. 60 0. 013 2 MH 1 EX-MH1 274 .00 273 . 45 Circ 1 0 . 00 1. 00 25. 97 2. 12 0 . 013 3 MH 2 MH 1 275.78 274 . 43 Circ 1 0 . 00 0 . 83 437 . 57 0. 31 0 . 013 4 MH 3 MH 2 281. 66 280 .78 Circ 1 0. 00 0. 83 89. 34 0. 99 0 . 013 5 MH 4 MH 3 283. 99 281. 71 Circ 1 0 .00 0 . 83 300 .72 0 .76 0 .013 6 MH 5 MH 4 286. 16 284 .09 Circ 1 0 .00 0 . 50 311.13 0 . 67 0 . 013 7 MH 6 MH 5 289. 87 287 .02 Circ 1 0.00 0. 50 357 . 19 0 . 80 0 .013 8 MH 7 MH 6 291. 98 289. 97 Circ 1 0.00 0 . 50 250. 81 0 . 80 0 . 013 9 MH 8 MH 3 287 . 80 283. 00 Circ 1 0 . 00 0. 50 305.26 1 . 57 0 . 013 10 MH 9 MH 8 294 . 08 287 . 90 Circ 1 0 . 00 0 . 50 327 . 75 1. 89 0. 013 11 MH 10 MH 7 295.78 292 . 08 Circ 1 0 . 00 0 . 50 463. 50 0 . 80 0. 013 12 MH 11 MH 8 291. 81 287 . 90 Circ 1 0 . 00 0. 50 488 . 82 0. 80 0. 013 13 MH 12 MH 7 293. 28 290. 22 Circ 1 0. 00 0 . 50 306. 00 1. 00 0 . 013 14 MH 13 MH 12 297 .74 293. 38 Circ 1 0 . 00 0 . 50 435. 16 1.00 0. 013 15 MH 14 MH 9 299. 69 294 . 37 Circ 1 0 . 00 0 . 50 426. 00 1.25 0. 013 16 MH 19 MH 14 301 . 36 299.77 Circ 1 0 . 00 0 . 50 127 . 85 1 .24 0 .012 Conveyance Hydraulic Computations. Tailwater = 0. 000 (ft) Hydraulic Gradeline Depth Velocity Junc Run# US Elev DS Elev Fr.Slope Unif. Actual Unif. Actual Q Cap Loss (ft) (ft) (9,5) (ft) (ft) (f/s) (f/s) (cfs) (cfs) (ft) 1* 273. 60 273. 00 0. 007 0 . 22 0. 22 2 . 29 2 .29 0. 30 2 . 75 0. 000 2* 274 . 16 273. 61 0. 007 0 . 16 0. 16 3. 59 3. 59 0. 30 5. 19 0 . 000 3 276. 06 274 . 68 0. 019 0. 28 0.28 1. 84 1.84 0. 30 1. 20 0 . 000 4* 281.87 280. 99 0. 019 0 . 21 0.21 2. 80 2 . 80 0. 30 2. 15 0 . 000 5* 284 . 16 281. 88 0 . 007 0 . 17 0 . 17 2 . 19 2 . 19 0 . 18 1. 89 0 . 000 6* 286.36 284 .29 0. 069 0 .20 0.20 2 . 07 2 . 07 0. 15 0. 46 0. 000 7* 290 .03 287 . 18 0. 043 0. 16 0. 16 2.09 2 . 09 0 . 12 0. 50 0. 000 8* 292 . 13 290. 12 0. 030 0 . 15 0. 15 1. 97 1. 97 0 . 10 0. 50 0 .000 9* 287 . 94 283. 14 0. 045 0. 14 0. 14 2 . 65 2. 65 0. 12 0.70 0 . 000 10* 294 . 16 287 . 98 0. 007 0. 08 0.08 2 . 17 2 . 17 0 . 05 0.77 0 . 000 Page 2 stmOutput.txt 11* 295. 86 292. 16 0.002 0.08 0. 08 1. 35 1. 35 0. 03 0. 50 0. 000 12* 291. 92 288 .01 0 . 009 0. 11 0 . 11 1. 65 1. 65 0 . 05 0 . 50 0. 000 13* 293. 53 292. 13 0. 011 0 . 11 0. 50 1. 86 0. 31 0. 06 0. 56 0. 000 14* 297 . 83 293. 53 0. 005 0. 09 0. 15 1. 64 0. 81 0 . 04 0. 56 0. 000 15* 299.77 294 . 45 0. 003 0. 08 0. 08 1 . 62 1. 62 0. 03 0. 63 0. 000 16* 301. 40 299. 81 0. 000 0. 04 0. 04 1.26 1.26 0 . 01 0 . 68 0 . 000 END * Super critical flow. NORMAL TERMINATION OF WINSTORM. Warning Messages for current project: Runoff Frequency of: 2 Years Tailwater set to uniform depth elevation = 273. 00 (ft) Drop flowline elevation. Downstream HGL set to critical depth elevation at Run# 3 Drop flowline elevation. Downstream HGL set to uniform depth elevation at Run# 4 Drop flowline elevation. Downstream HGL set to uniform depth elevation at Run# 9 Drop flowline elevation. Downstream HGL set to uniform depth elevation at Run# 7 Drop flowline elevation. Downstream HGL set to uniform depth elevation at Run# 15 Drop flowline elevation. Downstream HGL set to uniform depth elevation at Run# 16 Page 3