From: Rabon Metcalf <rabon@rmengineer.corn>
Sent: Wednesday, October 01, 2014 8:56 AM
To: Raymond Olson; Stephen Smith;Wally Urrutia
Cc: Erika Bridges; Mark Bombek; 'David Scarmardo'; 'Jacob Novicke'
Subject: Summit Crossing, Phase 2B - College Station, TX: Temporary Turn-Around
ALL:
Thanks for your help and coordination on the matter and subdivision referenced above. Per my emails and phone
conversations with you all I'm deleting the temporary turn-around since it is not necessary.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
Ccorwafrieta Ertga"ru,prrar
3800 SH No. 6, Suite 108G <77845>
P.O. Box 9253
College Station, TX 77842
Off:(9 79) 764-0704
Fax:(979) 764-0704
1
Erika Bridges
From: Wally Urrutia
Sent: Tuesday, September 30, 2014 2:14 PM
To: 'Rabon Metcalf'
Cc: Erika Bridges; Rodney Harris
Subject: RE: Summit Crossing, Ph 2B - College Station, TX: Deletion of temp turn-around
I am ok with the deletion as long as we don't have to backup over 120 feet.
Thanks.
From: Rabon Metcalf[mailto:rabon@rmengineer.com]
Sent:Tuesday, September 30, 2014 11:34 AM
To: Wally Urrutia
Cc: Erika Bridges
Subject:Summit Crossing, Ph 2B - College Station, TX: Deletion of temp turn-around
Wally:
Attached is a quick sketch of what you and I discussed. If you are ok with it then I'll delete the temporary turn-around
that is shown on the drawings.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
401.16
404 -"111.-
Clatessaufriovg, Engpieximem
3800 SH No. 6, Suite 108G <77845>
P.O. Box 9253
College Station, TX 77842
Off:(9 79) 764-0704
Fax: (979) 764-0704
1
--- • ____............_......... ..
,
!
vv/ i n.mIA.k.... run
EMERGENCY ..
TORN—AROUND
4G, PH 2B
, - ---- 3 REFLECTIVE I .
WARNING SIGNS
] . ,
, .
. \
S .c
17777....t... :3
<=3"------- ."----------T
.41<<--N.k
V.\. ‘: ,;.,,i::: :',; 1.-..e,
',.j,,F;:t,* b '
.......- J.il 41;‘'‘,,,4,, 0 M 03
O. . 1>
, .-->'• -,4'
i f- --- -1-- --- -7 !: 1 : ,(5
MISR r I ' o
° I Ar 1 47' i."-NiLIgal 1 43)4'\igr4)
T/G-307.2' .. '
- . 1 , ' ---=-4,---- ' ' — --------z-
1
i s .71
) ,s, ' 10 °
AINTAIN ADA
307.25
I
A
u t'sMPLIANT SLOPES TRU i
..t . ±..A ... .,DEWALK PROJECTI7
0
EAS 11•1111MNNI.
. 1,4
....''..j)'...••••• .../..... . tIMP Iv..+-
MO ._
:-....,,,.. -
'9' \ ft
-....., , T/G-3o8.o' — , - . t• i' -3c
7
_____
_
............ earagro•
... •••..I1
.....
.!"....... 1=>
_
0 .
6.11 1
..,.-.
Erika Bridges
From: Rabon Metcalf <rabon@rmengineer.com>
Sent: Wednesday, October 01, 2014 9:04 AM
To: Raymond Olson; Stephen Smith; Wally Urrutia; Stephen Smith
Cc: Erika Bridges; Mark Bombek; 'David Scarmardo'; 'Jacob Novicke'
Subject: RE: Summit Crossing, Phase 2B - College Station, TX: Temporary Turn-Around
Got it. I've also worked this out with Wally Urrutia.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
CiarriAluiffMa +errri",nti rs
3800 SH No. 6, Suite 108G <77845>
P.O. Box 9253
College Station, TX 77842
Off::(979) 764-0704
Fax: (979) 764-0704
The information transmitted by RME Consulting Engineers(RME),for the above referenced project is considered by RME to be confidential. This material is intended
ONLY for the use of the recipient named above and permission is not granted to the recipient for distribution of these documents in any form or fashion. The recipient
understands and agrees to RME that upon release of these documents is no longer responsible for their use or modification. The user and recipient of the documents
accept full responsibility and liability for any consequences arising out of the use of these documents.
From: Raymond Olson [mailto:rolson@cstx.gov]
Sent: Wednesday, October 01, 2014 8:59 AM
To: 'Rabon Metcalf; Stephen Smith; Wally Urrutia; Stephen Smith
Cc: Erika Bridges; Mark Bombek; 'David Scarmardo'; 'Jacob Novicke'
Subject: RE: Summit Crossing, Phase 2B - College Station, TX: Temporary Turn-Around
Great, make sure no other city entity for example, sanitation has issues, don't want to step on any toes.
From: Rabon Metcalf[mailto:rabon@rmengineer.com]
Sent: Wednesday, October 01, 2014 8:56 AM
To: Raymond Olson; Stephen Smith; Wally Urrutia
Cc: Erika Bridges; Mark Bombek; 'David Scarmardo'; 'Jacob Novicke'
Subject: Summit Crossing, Phase 2B-College Station,TX: Temporary Turn-Around
ALL:
Thanks for your help and coordination on the matter and subdivision referenced above. Per my emails and phone
conversations with you all I'm deleting the temporary turn-around since it is not necessary.
Thanks,
Rabon A. Metcalf, P.E., C.F.M.
1
Caffiesasfring Erryir
3800 SH No. 6, Suite 108G <77845>
P.O. Box 9253
College Station, TX 77842
Off:(9 79) 764-0704
Fax:(979) 764-0704
City of College Station
Home of Texas A&M University ®
2