Loading...
HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT Wrr PERMIT NO. 14-252 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CI,oFcoW opmentnc»v ria:,,„;�&rarY ,„,•,,,a.,., RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Lakeridge Townhomes Ph.3-R 1198 Jones-Butler Rd. Lakeridge Subdivision, Block 1, Lot 1 DRAINAGE BASIN: Bee Creek Trib. "B” DATE OF ISSUE: 12/11/14 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Lakeridge Living, LP (do Jim Stewart) P.O. Box 10028 College Station, TX 77842 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: I, c ■ , the Contractor, hereby agree to comply with all conditions herein. • tracto signature Date - 17- TqA ik— o k .w Phone number E-mail I hereby grant this permit for development. Contact 7:090Jones 111-L4 h_} , the Public Works Inspector assigned to this project 24 hours prior to beginnnstruction for scheduling required Inspections. • .: .�:A 1E111 ,L1 City ngineer/Representati Date LAKERIDGE TOWNHOMES PH.3-Revised PUBLIC INFRASTRUCTURE - PRELIMINARY COST ESTIMATE 11/26/2014 Water Line Items 8" PVC Waterline (AWWA C900 CL 200) 1 structural backfill 776.95 LF $40.00 $31,078.00 6" PVC Waterline (AWWA C900 CL 200) 2 in structural embedment 26.49 LF $30.00 $794.70 4" PVC Waterline (AWWA C909 CL 200) 3 in structural backfill 544.97 LF $30.00 $16,349.10 4 8"x8" MJ Tee 1 EA $400.00 $400.00 5 8"x6" MJ Tee 2 EA $400.00 $800.00 6 8"x4" MJ Tee 12 EA $300.00 $3,600.00 7 4"x4" MJ Tee 3 EA $250.00 $750.00 8 8" MJ Gate Valve 2 EA $800.00 $1,600.00 9 6" MJ Gate Valve 2 EA $750.00 $1,500.00 10 4" MJ Gate Valve 9 EA $500.00 $4,500.00 11 4" MJ Gate Valve with Locking Lid 8 EA $600.00 $4,800.00 12 8"x45deg MJ Bend 13 EA $400.00 $5,200.00 13 4"x9Odeg MJ Bend 2 EA $300.00 $600.00 14 8"x4" MJ Reducer 1 EA $300.00 $300.00 15 1" Domestic Water Meter 8 EA $500.00 $4,000.00 16 Std. Fire Hydrant Assembly 2 EA $3,750.00 $7,500.00 17 Connection to existing system 2 EA $2,250.00 $4,500.00 18 Trench Safety 1348.41 LF $1.00 $1,348.41 Total $89,620.21 City Inspection Fee(1.00%of construction cost) Total Insp Fee $896.20 x�P\E OF TF4.4 44 �VERONICA J.B.MORGAN i i 4+-2) -0:. 77689 . i c(� , ',„. •���; 1 it 0.<'•9 GISTS �'.' Lakeridge Townhomes Engineers Estimate - FM 2818 Sidewalk Replat Item # Description Quantity Units Unit Price Price 1 Mobilization 1 LS $ 1,500.00 $1,500 2 Erosion Control 1 LS $ 1,500.00 $1,500 3 Cellulose Fiber Mulch Seeding 1446 LF $ 0.40 $578 4 4" Reinforced Concrete Sidewalk (6'wide) 8826 SF $ 4.00 $35,304 5 Handicap Ramp 1 LS $ 500.00 $500 6 24" HDPE Pipe 20 LF $ 50.00 $1,000 SUBTOTAL $40,382 Contingency (15%) $6,057 I TOTAL[ $46,4401 4z4S y.P�°F F, E,rg4,-it i* 7 i '••.*..1 %"; :; '• ,�90•• 9EGis1E:..--'� 01 '1%1Ss•ioNA, = tZ-3' Rao F._(44