HomeMy WebLinkAboutDrainage Analysis COLLEGE STATION INDEPENDENT SCHOOL DISTRICT
CENTER FOR ALTERNATIVE LEARNING REBUILD
DRAINAGE ANALYSIS
November 2014
Prepared for:
COLLEGE STATION INDEPENDENT SCHOOL DISTRICT
1812 WELSH AVENUE
COLLEGE STATION, TX 77840
Submitted to
flCIZOF COLLEGE STATION
he
heart of the Raearrh Valley
By
MITCHELL
MORGAN
ENGINEERS &CONSTRUCTORS
3204 EARL RUDDER FREEWAY SOUTH
COLLEGE STATION, TX 77845
OFFICE (979) 260-6963
FAX(979) 260-3564
CERTIFICATION
This report for the drainage design for the Center for Alternative Learning Rebuild was
prepared under my supervision in accordance with provisions of the Bryan/College Station
Unified Drainage Design Guidelines for the owners of the property. All licenses and
permits required by any and all state and federal regulatory agencies for the proposed
drainage improvements have been issued.
III 411/ r-�P'S �F rF'I'gt��l
i VERONICA J.B.MORGAN
Veronica JB
I ".E. 7 -�•. -7689 'Qi
Registered Profess .nal Engineer p'.;•• ,0,9 �o: iv:7
r ••FG�sTE•i • �_�
State of Texas No. 77689 +iii sS/pN..�•��
Firm#F-1443 ����,�� �~
Center for Alternative Learning Rebuild
Drainage Analysis
INTRODUCTION
. The purpose of this drainage report is to present an analysis of the necessary drainage
infrastructure for the Center for Alternative Learning (CAL) rebuild, (formally known as Timber
Academy and the City of College Station Conference Center) located on the block adjacent to
George Bush Drive, Holik Street and Timber Street.
GENERAL LOCATION & DESCRIPTION
. Located on the eastern corner of the intersection at George Bush Drive and Bizzel/Timber, the
Center for Alternative Learning (CAL) rebuild property consists of an approximately 15 acre tract
• bounded by Timber Street on the west, George Bush Drive on the north, Oakwood School on
. the south and Holik Street on the east as seen in Exhibit 1. Prior to demolition, the site
contained the COCS Conference Center, a portion of the Barbara Bush Parent Center, and
Timber Academy. The project will be redeveloped into a two-story learning center, adjacent to
flo the remainder of the Barbara Bush Parent Center and Oakwood Intermediate School. No
portion of the property lies within the regulatory 100-year floodplain per the Federal Emergency
Management Agency (FEMA) Flood Insurance Rate Map (FIRM) panel 48041C0305E, with an
effective date of May 16, 2012 (Exhibit 1A).
The overall storm drain layout for the site can be seen on Exhibit 2.
DRAINAGE DESIGN CRITERIA
All drainage design is in accordance with the Bryan/College Station USDG. As such:
• Design rainstorm events consist of the 2-, 5-, 10-, 25-, 50- and 100-year, 24 hour duration
hypothetical frequency storm events in order to analyze the effectiveness of the storm water
facilities as well as capture conservative peak flow values.
• Initial flow calculations are based on the Rational Method (used to determine if detention is
necessary.)
• Detention and hydrograph data were computed using HEC-HMS.
• The target peak runoff rate for the post-development condition is that of the pre-
development peak flow rates at the study confluence.
gift
PRIMARY DRAINAGE BASIN DESCRIPTION
The CAL Rebuild project is located within the Wolf Pen Creek Watershed. Currently, there are
no offsite drainage areas that flow through the site. All onsite drainage currently flows to two
outfall points (Study Points "OUT1" and "OUT2"). OUT1 discharges to George Bush Drive,
while OUT2 discharges to Wolf Pen Creek.
STORMWATER RUNOFF ANALYSIS ON-SITE STORM SEWER SYSTEM
Pre-Development Drainage Basin
The pre-development areas for the CAL rebuild project consist of 10 drainage subbasins as
seen in Exhibit 3. This exhibit illustrates the total area contained within each of these drainage
subbasins. It is important to note that the existing site has a high percent of impervious cover.
Subbasins E-DA1, 2, 3, and 8 all drain to the existing gutterlines of Timber and George Bush
Center for Alternative Learning, CSISD 1
Drainage Report
Drive and ultimately flow to Study Point OUT1 which is a 15 foot curb inlet on George Bush
Drive discharging directly into Wolf Pen Creek. All other drainage basins with the exception of
E-DA-9 and E-DA-4 flow to an onsite storm sewer system or overland flow to Holik Street and to
Study Point OUT3 in Wolf Pen Creek. Drainage area E-DA-4 flows to an existing 5 foot inlet in
IL the parking lot near Holik Street and to OUT2 in Wolf Pen Creek. And E-DA-9 flows south down
Timber Street and does not contribute to Wolf Pen Creek. These subbasins were used to
• compute storm water discharge for the pre-development conditions. The discharge flows for the
- 2, 5, 10, 25, 50, and 100 year storm events were computed using the Rational method and are
seen in Exhibit 5.
ID
- Post-Development Drainage Basin
The post-development drainage areas for the CAL rebuild project consists of 20 subbasins as
seen in Exhibit 4. The discharge flows for the 2, 5, 10, 25, 50, and 100 year storm events were
computed for each of these subbasins using the Rational method and are seen in Exhibit 5.
Drainage areas P-DA-1, 2, 3, 3A and 4 all drain to George Bush Drive and then to OUT1.
Drainage area P-DA-16 drains to 1-13 and then to OUT2 while drainage area P-DA-5 drains to
the underground detention pond and ultimately to OUT3. All remaining drainage basins drain to
the underground drainage system being constructed with the CAL project between the CAL and
Oakwood schools and then undetained to OUT3.
There is an existing underground drainage system between the Oakwood and old Conference
Center building but when looking at the 10-100 year flows to that system, calculations show it is
severely undersized. With such a small area between the buildings and this area being a major
corridor for underground and overland relief of stormwater this project upsized this storm line to
carry through the 100 year storm event.
As stated earlier this project currently has a great deal of impervious cover on the site. As such
much of the flow will be leaving the site undetained. Both OUT1 and OUT2 will not have any
detention provided for flow exiting the site in those directions. All flows in those directions have
been significantly reduced due to the regrading of the site and shifting of storm flows in other
directions. Table 1 below shows the flows for all storm events both pre- and post-development
to these 2 outfall locations.
2-YR Q 10-YR Q 25-YR Q 50-YR Q 100-YR Q
OUTFALLS PRE POST PRE POST PRE POST PRE POST PRE POST
OUT1 8.4 7.2 11.4 9.71 13 11.1 14.7 12.6 16.5 14.1
OUT2 3.6 1.2 5.0 1.6 5.7 1.8 6.4 2.1 7.2 2.3
Table 1 — Pre- and Post-Development Flows
As seen in Table 1, the runoff contributing to outfalls OUT1 and OUT2 for the post-developed
condition is less than the runoff contributing to these outfall locations in the pre-developed
scenario. The runoff from the remaining drainage areas does increase runoff amounts which
required the need for underground detention. This is mainly due to the amount of impervious
area that was added in drainage areas E-DA-3 and E-DA-6. The sizing of the underground
detention is discussed later in this report.
Center for Alternative Learning, CSISD 2
Drainage Report
Storm Sewer System
The storm sewer system designed for CAL consists of one major run of storm sewer pipe. The
pipe sizes were determined using Exhibit 6. This spreadsheet illustrates the pipe calculations
used to size the storm drain system on the project. The calculations use the Manning's
- Formula, and utilizes the flow at each pipe segment to optimize the slope and size of each pipe
segment. The pipe calculations can be seen for both the 10-year and 100-year storm events in
both Exhibits 6 and 7. As seen on these exhibits, the pipes range in size from 8 to 30 inches to
. facilitate collection of the storm water for the 100-year event. This design well exceeds the City
of College Station standards. This was intentional to assure there would be no concerns with
the building finished floor elevations vs. flooding depths over storm inlets given the proximity of
i the storm sewer to the buildings. This storm sewer will be privately owned and maintained by
CSISD.
C
,r The CAL rebuild project includes 9 grate inlets and one new curb inlet on Holik Street. In
addition, one existing curb inlet (1-13) in the parking lot near Holik Street was checked for
capacity to assure its size is sufficient to handle the flows directed to it.
4 All inlets were sized using both the 10-year and 100-year storm events. Exhibits 8 and 9 show
0 each grate inlet as well as the flow directed to it under each storm event. All depths calculated
over these storm inlets was less than an 8 inch ponded depth during the 10-year and 100-year
storm events. It should be noted, there is no flow to inlet 1-3. That is because inlet 1-3 which
has a top of grate elevation 1 foot higher than inlet 1-2 will only receive flow if 1-2 becomes
clogged and reaches a depth of 12 inches. This extra grate was added, to an already required
junction box, because of the proximity of the doorways into the school building and the
emergency services area.
In addition to sizing the storm sewer piping and inlets, hydraulic grade lines (HGL) were
calculated to illustrate the water level in these pipe systems during the 10- and 100-year events.
As seen in Exhibits 10 and 11, the HGL elevations are below the proposed ground elevations
which can be seen on Exhibit 2.
These HGL's were computed using the soffit elevation of 298.50 at the 30-inch pipe at Wolf Pen
Creek for the 10-year storm event and 303ft which is the 100-year floodplain elevation at the
discharge location in the creek, which can be seen on Exhibit 1A. In addition, the flows used
per pipe were the unadjusted flows shown on Exhibits 6 and 7 for the 10-year and 100-year
events.
Underground Detention System
The underground detention system consists of five 48-inch HDPE pipes, approximately 40 feet
in length each, embedded in cement stabilized backfill. The increased runoff from the
development drains to the underground detention system and is controlled by an outlet orifice
' consisting of a 1/4- steel plate with a 6"x5" rectangular orifice opening in the plate. The plate is
to be bolted into place over a 12" outlet pipe. In addition, a grate inlet is located at the
downstream end of the detention pipe system to provide for an emergency release of
stormwater, if the outlet orifice becomes clogged. This emergency outflow grate is set just
downstream of the detention pond header pipe and is set at elevation 317.97ft with a flowline of
310.97ft.
-- From this detention pond header, the 12-inch PVC and then 30-inch RCP storm sewer carries
• the outflow to Wolf Pen Creek and the study point OUT3. At Wolf Pen Creek all three outfalls
will converge (OUT1, OUT2 and OUT3)
Center for Alternative Learning, CS/SD 3
Drainage Report
The USAGE HEC-HMS flood hydrograph program was used to create hydrographs for each
storm event for all existing and proposed drainage areas. Also modeled in HEC-HMS was the
underground detention system or pond. These hydrographs were routed through HEC-HMS,
IP with the results shown in Appendix A. As seen in Table 2 below, the total post-detention peak
runoff at the discharge location in Wolf Pen Creek where all three outfalls converge
approximates existing flows are less than the existing peak runoff, showing that the
- underground detention has effectively detained the runoff to below pre-existing rates.
• Table 2: HEC-HMS Model Results
. Pre vs. Post Discharge @ Wolf Pen Creek
(OUT1 + OUT2 + OUT3)
Pond Existing Proposed Difference
. 5-YR 28.9 28.6 -0.3
10 YR 32.4 32 -0.4
25-YR 37.9 37.4 -0.5
50-YR 42.3 41.7 -0.6
100-YR 46.5 45.8 -0.7
* Flows in units of cfs.
CONCLUSION & RECOMMENDATIONS
The Center for Alternative Learning (CAL) project discharges to 3 study points, OUT1, OUT2
and OUT3. As seen in Table 1, the proposed stormwater discharge from OUT1 and OUT2
study points are less than predevelopment flowrates. The project has designed an underground
detention facility to accommodate the increases seen at study point OUT3. As seen in Table 2,
the underground detention has effectively reduced the discharge from OUT3 to below
predevelopment rates. The CAL site will not cause an increase in runoff to any of the outfall
locations and the internal storm sewer system has been designed in accordance with the
Bryan/College Station USDG.
•
lb
AIM
• Center for Alternative Learning, CSISD 4
- Drainage Report
-
ATTACHMENTS
EXHIBIT 1: Site & Storm Sewer Layout
EXHIBIT 1A: General Location Map — FEMA Firmette
EXHIBIT 2: Storm Drain Layout Sheet 1 of 2
EXHIBIT 3: Existing Drainage Area Map
EXHIBIT 4: Proposed Drainage Area Map
EXHIBIT 5: Rational Formula Calculations
EXHIBIT 6: Pipe Capacity Calculations— 10-year Design Storm
EXHIBIT 7: Pipe Capacity Calculations— 100-year Design Storm
EXHIBIT 8: Inlet Capacity Calculations— 10-year Design Storm
EXHIBIT 9: Inlet Capacity Calculations— 100-year Design Storm
EXHIBIT 10: Hydraulic Grade Line Calculations— 10-year Design Storm
EXHIBIT 11: Hydraulic Grade Line Calculations— 100-year Design Storm
APPENDIX A: HEC-HMS Results
Center for Alternative Learning, CSISD 5
Drainage Report
EXHIBIT 5
Rational Formula Drainage Area Calculations
CSISD-Center for Alternative Learning
3 3 •
w• j LL -I 3 3
0 0
a n z zz Qi LL a
Q• J H 0 2 J JF- J ~W F W U F O
Q N W W Q d'U a' J F L r J 0 N o
Q f Q > > 1- W z W J Z J J 14 WO b o o O
re O W Q O > 111 > 4 = W n Q '.. W N to N O W N O N O
• F- U' G d F- O J O u. U' J U' u. > U 7 N G7 C7 N r N Ca I ',I C7
NO. AC. 0.40 0.7 0.95 ft. , ft. , ft. , ft. f/s min min ,In/Hr, cfs In/Hr;cfs In/Hr cfs , In/Hr cfs In/Hr! cfs
EDA-1 0.08 0.00 0.00 0.08 0.07 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 0.5 8.6 0.6 9.9 0.7 11.1 0.8 12.5 0.9
EDA-2 0.17 0.00 0.00 0.17 0.16 200.0 2.0 1.0 1.0 0.7 4.7 10.0 6.33 1.0 8.6 1.4 9.9 1.6 11.1 1.8 12.5 2.0
EDA-3 1.58 0.94 0.00 0.64 0.98 300.0 11.0 180.0 2.0 1.6 5.1 10.0 6.33 6.2 8.6 8.5 9.9 9.7 11.1 10.9 12.5 12.3
EDA-4 0.74 0.22 0.00 0.51 0.58 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 3.6 8.6 5.0 9.9 5.7 11.1 6.4 12.5 7.2
EDA-5 0.52 0.07 0.00 0.45 0.46 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 2.9 8.6 3.9 9.9 4.5 11.1 5.1 12.5 5.7
EDA-6 1.08 0.97 0.00 0.10 0.49 300.0 6.0 150.0 12.0 1.4 5.4 10.0 6.33 3.1 8.6 4.2 9.9 4.8 11.1 5.4 12.5 6.1
EDA-7 1.27 1.01 0.00 0.26 0.65 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 4.1 8.6 5.6 9.9 6.4 11.1 7.3 12.5 8.2
EDA-8 0.11 0.00 0.00 0.11 0.11 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 0.7 8.6 0.9 9.9 1.0 11.1 1.2 12.5 1.3
EDA-9 0.14 0.00 0.00 0.14 0.13 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 0.8 8.6 1.2 9.9 1.3 11.1 1.5 12.5 1.7
EDA-10 1.87 0.00 0.00 1.87 1.78 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 11.2 8.6 15.3 9.9 17.5 11.1 19.8 12.5 22.3
PDA-1 0.08 0.00 0.00 0.08 0.07 100.0 1.0 1.0 1.0 0.7 2.4 10.0 6.33 0.5 8.6 0.6 9.9 0.7 11.1 0.8 12.5 0.9
PDA-2 0.17 0.00 0.00 0.17 0.16 200.0 2.0 1.0 1.0 0.7 4.7 10.0 6.33 1.0 8.6 1.4 9.9 1.6 11.1 1.8 12.5 2.0
PDA-3 1.01 0.46 0.00 0.55 0.71 300.0 11.0 180.0 2.0 1.6 5.1 10.0 6.33 4.5 8.6 6.11 9.9 7.0 11.1 7.9 12.5 8.9
PDA-4 0.27 0.13 0.00 0.14 0.19 90.0 8.0 160.0 2.0 2.2 1.9 10.0 6.33 1.2 8.6 1.6 9.9 1.8 11.1 2.1 12.5 2.3
PDA-5 0.64 0.00 0.00 0.64 0.60 1.0 1.0 180.0 3.0 2.6 1.2 10.0 6.33 3.8 8.6 5.2 9.9 6.0 11.1 6.7 12.5 7.6
PDA-6 1.17 1.04 0.00 0.13 0.54 1.0 1.0 210.0 4.0 2.7 1.3 10.0 6.33 3.4 8.6 4.6 9.9 5.3 11.1 6.0 12.5 6.7
PDA-6a 0.32 0.00 0.00 0.32 0.31 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 1.9 8.6 2.6 9.9 3.0 11.1 3.4 12.5 3.8
PDA-6b 0.06 0.00 0.00 0.06 0.06 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.4 8.6 0.5 9.9 0.6 11.1 0.7 12.5 0.7
PDA-6c 0.63 0.63 0.00 0.00 0.25 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 1.6 8.6 2.2 9.9 2.5 11.1 2.8 12.5 3.2
PDA-7 0.03 0.00 0.00 0.03 0.03 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.2 8.6 0.2 9.9 0.3 11.1 0.3 12.5 0.3
PDA-8 0.11 0.01 0.00 0.09 0.09 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.6 8.6 0.8 9.9 0.9 11.1 1.0 12.5 1.1
PDA-9 0.06 0.02 0.00 0.04 0.04 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.3 8.6 0.4 9.9 0.4 11.1 0.5 12.5 0.6
PDA-10 0.06 0.02 0.00 0.04 0.04 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.3 8.6 0.4 9.9 0.4 11.1 0.5 12.5 0.6
PDA-11 0.09 0.05 0.00 0.03 0.05 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.3 8.6 0.5 9.9 0.5 11.1 0.6 12.5 0.7
PDA-12 0.08 0.04 0.00 0.04 0.06 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.4 8.6 0.5 9.9 0.6 11.1 0.6 12.5 0.7
PDA-13 0.09 0.04 0.00 0.04 0.06 1.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.4 8.6 0.5 9.9 0.6 11.1 0.7 12.5 0.7
PDA-14 0.58 0.32 0.00 0.26 0.38 151.0 12.0 175.0 3.0 2.3 2.4 10.0 6.33 2.4 8.6 3.2 9.9 3.7 11.1 4.2 12.5 4.7
PDA-15A 0.16 0.00 0.00 0.16 0.15 1.0 1.0 85.2 0.9 2.0 0.7 10.0 6.33 0.9 8.6 1.3 9.9 1.5 11.1 1.7 12.5 1.9
PDA-16 0.25 0.09 0.00 0.16 0.19 1.0 1.0 129.0 7.2 4.7 0.5 10.0 6.33 1.2 8.6 1.6 9.9 1.8 11.1 2.1 12.5 2.3
PDA-15B 0.15 0.00 0.00 0.15 0.15 1.0 1.0 114.9 1.1 2.0 1.0 10.0 6.33 0.9 8.6 1.3 9.9 1.4 11.1 1.6 12.5 1.8
PDA-15C 0.15 0.00 0.00 0.15 0.14 1.0 1.0 116.9 1.2 2.0 1.0 10.0 6.33 0.9 8.6 1.2 9.9 1.4 11.1 1.5 12.5 1.7
PDA-15D 0.48 0.00 0.00 0.48 0.45 1.0 1.0 182.0 1.8 2.0 1.5 10.0 6.33 2.9 8.6 3.9 9.9 4.5 11.1 5.1 12.5 5.7
Exhibit 5
t
0
a
Ill
- EXHIBIT 6
Pipe Capacity Calculations
• CSISD-Center for Alternative Learning
• 10-year Design Storm
L
III
e°III .61n '
as i a+
ill d
W aa v+" . � a e
4, Z O O a, a+ C 'O o C O, W 1 es W : s. 1 v
F F I F G La. : Q Z 1 4. La.. 4. > ' U E- F
# # Ac. min yr 1 cfs cfs # , cfs % : % fps cfs ft. 1 min min
PDA-5 Pond 0.60'10.0 10 5.2 6.5 1 6.5 1 1.01 2.150 ,":' 7.7 • 9.5 30 i 0.06 1 10.06
PDA-6b 1-2 0.06 10.0 10 0.5 0.6 1 0.6 I 0.28 1.000 3.5 I 1.2 90 1 0.43 10.43
PDA-7 1-3 0.12 10.2 10 1.0 1.3 1 1.31 0.34 1.000 4.0 1 2.2 10 1 0.04 10.19
PDA-8 PDA-7 0.09 10.0 10 0.8 1.0 1 1.0 1 0.20 f1.000 4.0 2.2 37 i 0.15 10.15
PDA-9 1-5 0.04 10.0 10 0.4 0.5 1 0.5 1 0.16 11.000 3.5 1.2 11 i 0.05 10.05
PDA-10 1-6 0.04 10.0 10 0.4 0.5 1 0.5 1 0.15 11.000 3.5 I 1.2 22 0.11 10.11
It PDA-12 1-8 0.06 10.0 10 0.5 0.6 1 0.6 I 0.25 11.000 3.5 1.2 42 i 0.20 10.20
PDA-13 1-9 0.06 10.0 10 0.5 0.6 1 0.6 0.27 1.000 3.5 1.2 30 i 0.14 10.14
1-1 1-2 0.31 10.0 10 2.7 3.3 1 3.3 0.26 1.000 5.3 6.5 37 ' 0.12 10.12
1-2 1-3 0.90 10.4 10 7.7 9.6 1 9.6 0.83 1.740 7.9 13.9 551 0.12 10.55
tow 1-3 JB-4 1.02 10.5 10 8.6 10.8 1 10.8 0.23 11.000 7.2 22.7 70 0.16 10.71
JB-4 1-5 1.43 10.7 10 12.0 15.0 1 15.0 0.43 :1.000 7.2 22.7 43 ' 0.10 10.81
1-5 1-6 1.47 10.8 10 12.3 15.4 1 15.4 0.46 11.000 7.2 22.7 561 0.13 10.94
1-6 JB-7 1.51 10.9 10 12.6 15.7 1 15.7 0.48 11.000 . 7.2 22.7 38 0.09 11.03
i JB-7 1-8 , 1.51 11.0 10 12.6 15.7 1 15.71 0.48 .1.000 7.2 ' 22.7 32 1 0.07 11.10
1-8 1-9 1.62 11.1 10 13.4 16.8 1 16.81 0.55 11.150 7.7 I 24.3 1091 0.23 11.33
1-9 1-10 1.68 11.3 10 13.8 17.2 1 17.21 0.58 11.220 8.0 i 25.0 87 0.18 11.52
1-10 1-11 1.68 11.5 1013.7 13.7 1 13.71 0.11 1.000 8.4 I 41.1 73 0.15 11.66
1-11 Out3 2.06 11.7 10 I 16.7 16. 7 1 16.71 0.16 :2.000 11.8 58.2 134 0.19 111.85
I :ID
C
C
C
C
Or
IExhibit 6
EXHIBIT 7
Pipe Capacity Calculations
CSISD-Center for Alternative Learning
100-year Design Storm
° 1 i I
I
E A .w r, a : a as
O F d `o A a, a. ' ° „ E
z W U .. V .� a 6 € a = 1 e
..a .. p a c o .. F F W
F z d c -, - C. o 7 u
W U a,
.a ~ F 44, 3 ? ° 3 u as ■.7 . q z ea *
z 0 O u as e ° b O o � s. W 1 00 W 6.--
E-
u
F F F 1 A La, d Z W la. a. > 1 U W F , F
# # Ac. min yr cfs cfs # cfs % % fps cfs ft. min min
PDA-5 i Pond 0.60 10.0 100 7.6 ; 9.5 1 9.5 2.13 2.150 7.7 I 9.5 30 0.06 ; 10.06
PDA-6b 1-2 0.06 10.0 100 0.7 0.9 1 0.91 0.58 !1.000 3.5 1.2 90 0.43 10.43
PDA-7 1-3 0.12 10.2 100 1.5 1.9 1 1.91 0.71 1.000 4.0 2.2 10 0.04 10.19
PDA-8 PDA-7 0.09 10.0 100 1.1 1.4 1 1.4 j 0.43 1.000 4.0 2.2 37 0.15 10.15
PDA-9 1-5 0.04 10.0 100 0.6 0.7 1 0.7 i 0.33 1.000 3.5 1.2 11 0.05 10.05
PDA-10 1-6 0.04 10.0 100 0.6 0.7 1 0.7I 0.32 1.000 3.5 1.2 22 0.11 10.11
PDA-12 1-8 0.06 10.0 100 0.7 0.9 1 0.9 i 0.52 1.000 3.5 I 1.2 42 0.20 10.20
PDA-13 1-9 0.06 10.0100 0.7 0.9 1 0.91 0.58 1.000 4 3.5 1.2 30 0.14 10.14
1-1 1-2 0.31 10.0 100 3.8 4.8 1 4.8 1 0.55 1.000 All 5.3 6.5 37 0.12 10.12
1-2 1-3 0.90 10.4 100 11.1 13.9 1 13.9! 1.74 1.740 7.9 I 13.9 55 i 0.12 10.55
1-3 JB-4 1.02 10.5 100 12.5 15.7 1 15.7; 0.48 1.000 7.2 22.7 70 0.16 10.71
JB-4 1-5 1.43 10.7100 17.4 21.7 1 21.7 0.92 1.000 7.2 1 22.7 431 0.10 10.81
1-5 1-6 1.47 10.8 100 17.9 22.3 1 22.3 0.97 1.000 7.2 22.7 561 0.13 10.94
1-6 JB-7 1.51 10.9 100 18.3 22.9 1 22.91 1.02 :1.000 7.2 22.7 381 0.09 11.03
JB-7 1-8 1.51 11.0100 18.2 22.8 1 22.81 1.01 1.000 7.2 I 22.7 321 0.07 11.10
1-8 1-9 1.62 11.1 100 19.5 1 24.4 1 24.41 1.16 1.150 7.7 24.3 1091 0.23 11.33
1-9 1-10 1.68 11.3100 20.0 i 25.1 1 25.11 1.22 1.220 8.0 25.0 87 I 0.18 11.52
1-10 1-11 1.68 11.5 100 19.9 i 19.9 1 19.91 0.23 1.000 8.4 41.1 73 I 0.15 11.66
1-11 Out3 , 2.06 11.7 100 24.2 ' 24.2 1 24.21 0.35 2.000 11.8 I 58.2 1341 0.19 11.85
L
III
III
III
III
ID
-
41111
III
- Exhibit 7
III
•
EXHIBIT 8
CSISD-Center for Alternative Learning
INLET CAPACITY
10-YEAR STORM
SUMP GRATE (10 Year Storm)
I-1 1-2
Q= 2.65 cfs 0= 4.64 cfs
clog= 25% clog= 25%
Q clogged= 3.31 cfs Q dogged= 5.80 cfs
Inlet Selected= V-5724-1 EJIW Inlet Selected= V-5726 EJIW
Open Area Open Area
Selected= 1.86 ft2 Selected= 2.23 ft2
T/G= 327.15 ft T/G= 326.00 ft
h=I 0.141ft h= 0.29 ft
WSE= 327.29 ft WSE= 326.29 ft
1-3 1-5
Q= 0.00 cfs Q= 0.30 cfs
dog= 25% clog= 25%
Q clogged= 0.00 cfs 0 dogged= 0.37 cfs
Inlet Selected= V-5712-ADA EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
Selected= 0.30 ft2 Selected= 0.46 ft2
T/G= 327.01 ft T/G= 326.56 ft
h= 0.00ft h= ft
WSE= 327.01 ft WSE= 326.59 ft
1-6 1-8
Q= 0.13cfs Q= 0.32cfs
clog= 25% clog= 25%
Q clogged= 0.16 cfs 0 dogged= 0.40 cfs
Inlet Selected= V-5712 EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
Selected= 0.46 ft2 Selected= 0.46 ft2
T/G= 324.72 ft T/G= 324.96 ft
- h= ft h= 0.03 ft
• WSE= 324.73 ft WSE= 324.99 ft
1-9 1-10
- Q= 0.52 cfs Q= 0.13 cfs
dog= 25% clog= 25%
Q clogged= 0.65 cfs Q dogged= 0.17 cfs
• Inlet Selected= V-5712 EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
• Selected= 0.46 ft2 Selected=
T/G= 0.46 ft2
T/G= 324.56 ft315.32 ft
• h= 0.09ft h= 0.01 ft
WSE= 324.65 ft WSE= 315.33 ft
• 1-12
Q= 0.12 cfs
• dog= 25%
Q clogged= 0.15 cfs
• Inlet Selected= V-5712 EJIW
Open Area
Selected= 0.46 ft2
• T/G= 318.02 ft
• h=I
WSE= 0.00Ift
318.02 ft I I
• Note* SUMP CURB:
Recessed inlets curb opening= Q=3.0`L'y^1.5
Height of curb+depression L=Q/(3.0`y"1.5)
•
y=6"+4"=equal 10"
SUMP GRATE:
• Q=4.82`A'100.5
A=Q/(4.82`y^0.5)
SUMP CURB (recessed) (10 Year Storm)
4116 I-11 1-13(Check)
Q= 3.25 cfs Q= 1.61 cfs
clog= 10% clog= 10%
0 clogged= 3.57 cfs Q dogged= 1.77 cfs
IL y= 0.83ft y= 0.83ft
L= 1.57 ft L= 0.78 ft
r
SUMP CURB:
416 Q=3.0*L*y"1.5
L=Q/(3.0'y"1.5)
•
Exhibit 8
0
EXHIBIT 9
CSISD-Center for Alternative Learning
INLET CAPACITY
100-YEAR STORM
SUMP GRATE (100 Year Storm)
I-1 1-2
Q= 3.84 cfs Q= 6.73 cfs
clog= 25% clog= 25%
Q clogged= 4.80 cfs 0 clogged= 8.41 cfs
Inlet Selected= V-5724-1 EJIW Inlet Selected= V-5726 EJIW
Open Area Open Area
Selected= 1.86 ft2 Selected= 2.23 ft2
T/G= 327.15 ft T/G= 326.00 ft
h= 0.29 ft h= 0.61 ft
WSE= 327.44 ft WSE= 326.61 ft
1-3 1-5
Q= 0.00 cfs Q= 0.43cfs
clog= 25% clog= 25%
Q clogged= 0.00 cfs Q clogged= 0.54 cfs
Inlet Selected= V-5712-ADA EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
Selected= 0.30 ft2 Selected= 0.46 ft2
T/G= 327.01 ft T/G= 326.56 ft
h= 0.00 ft h= 0.06 ft
WSE= 327.01 ft WSE= 326.62 ft
1-6 1-9
Q= 0.19cfs Q= 0.46 cfs
clog= 25% clog= 25%
Q clogged= 0.24 cfs Q clogged= 0.58 cfs
Inlet Selected= V-5712 EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
Selected= 0.46 ft2 Selected= 0.46 ft2
T/G= 324.72 ft T/G= 324.96 ft
h= 0.01 ft h= 0.07ft
WSE= 324.73 ft WSE= 325.03 ft
1-9 1-10
Q= 0.76cfs Q= 0.19cfs
clog= 25% clog= 25%
Q clogged= 0.95 cfs Q clogged= 0.24 cfs
Inlet Selected= V-5712 EJIW Inlet Selected= V-5712 EJIW
Open Area Open Area
Selected= 0.46 ft2 Selected= 0.46 ft2
T/G= 324.56 ft T/G= 315.32 ft
h= 0.18 ft h= 0.01 ft
WSE= 324.74 ft WSE= 315.33 ft
1-12
Q= 0.24 cfs
clog= 25%
Q clogged= 0.29 cfs
Inlet Selected= V-5712 EJIW
Open Area
Selected= 0.46 ft2
T/G= 318.02 ft
h=I 0.02Ift I I
WSE= 318.04 ft
Note` SUMP CURB
Recessed inlets curb opening= 0=3.0`Ly"1.5
Height of curb+depression L=Q/(3.0*y"1.5)
y=6"+4"=equal 10"
SUMP GRATE.
Q=4.82`A'h"0.5
A=0/(4.82y^0.5)
SUMP CURB (recessed) (100 Year Storm)
I-11 1-13(Check)
Q= 4.71 cfs 0= 2.33 cfs
clog= 10% clog= 10%
Q clogged= 5.18 cfs 0 clogged= 2.56 cfs
y= 0.83 ft y= 0.83 ft
L= 2.28 ft L= 1.13 ft
SUMP CURB
Q=3.0*Ly^1.5
L=Q/(3.0'y^1.5)
Exhibit 9
•
•
•
•
•
•
r
•
•
•
•
•
•
•
APPENDIX A
•
•
r
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
a
a
•
a
•
• CAL
EXISTING CONDITIONS HEC-HMS DIAGRAM
•
a
or a
FrontOfBldg
1111
StudyPt
c
46
I
0 -ear OfBldg
a
IP
a
a
a
aaa
- Appendix A
a
•
CAL
PROPOSED CONDITIONS HEC-HMS DIAGRAM
4. FrontOfBidg
-,• �.�� _. • ��StudyPt
earOBldg
Appendix A
CAL
5-YR EXISTING DISCHARGE SUMMARY
�r Project: Cal Simulation Run: E5
tit Start of Run: 165ep1986, 00:00 Basin Model: ExistingSystem
End of Run: 175ep1986, 00:00 Meteorologic Model: 5 YR STORM
Compute Time: 185ep2014, 20:16:20 Control Specifications: HYDROLOGY
Show Elements: All Elen-een' Volume Units: (_) IN ' : AC-FT Sorting: Hydrologic Ne,
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Iror O Element (MI2) (CFS) (IN)
RearOfBldg 0,004481 14.5 165ep1986, 12:07 4.74
FrontOFBldg 0.004170 14.4 165ep1986, 12:07 5.31
StudyPt 0.008651 28,9 165ep1986, 12:07 5.01
•
1111111
4111
•
fib
Appendix A
•
•
•
•
a
a
a
•
• CAL
a
• 5 YEAR EXISTING OUTFLOW HYDROGRAPH
•
•
•
Junction"StudyPt"Results for Run"E5"
• 30
a
• 25-
20-
•
520-•
•
15-
1111
5•
GO
10-
t
1
11
5- 1
`4
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
16Sep1885
Legend(Compute Time:185ep2014,20:16:20)
Run:E5 Element:STUDYPT Result:Outflow ——-Run:E5 Element:REAROFBLDG Result:Outflow
Run:E5 Element:FRONTOFBLDO Result:Outflow
41 el
•
a
a
a
Appendix A
•
•
•
•
•
•
•
CAL
• 5-YR PROPOSED DISCHARGE SUMMARY
•
•
•
• Project: Cal Simulation Run: P5
• Start of Run: 16Sep1986, 00:00 Basin Model: ProposedSystem
• End of Run: 175ep1986, 00:00 Meteorologic Model: 5 YR STORM
• Compute Time: 185ep2014, 20:16:48 Control Specifications: HYDROLOGY
• Shove Elements: Volume Units: IN tr_`'r AC-FT Sorting: Hydrologic `+
•
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg 0.005107 16,7 165ep1986, 12:07 4.84
FrontOfBldg 0.003094 10.7 165ep1986, 12:07 5.29
• ProposedBldg 0.000670 2.5 165ep1986, 12:07 6.19
• Pond1 0.000670 1.5 165ep1986, 12:16 6.19
StudyPt 0.008871 28.6 165ep1986, 12:07 5.10
•
C
•
ARM
tit
C
Appendix A
CAL
5 YEAR PROPOSED OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"P5"
30
25-
20-
15-
0-
5-
20-
15-0-
41111
• 5-
f. .l
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
16Sep1986
Legend(Compute Time:185ep2014,20:16:48)
—Run:P5 Element:STUDYPT Result:Outflow ——
—Run:P5 Element:REAROFBLDG Result:Outflow
. Run:P5 Element:FRONTOFBLDG Result:Outflow —-— Run:P5 Element:POND1 Result:Outflow
e
e
•
•
•
e Appendix A
•
CAL
DETENTION POND SUMMARY
FOR 5-YR STORM
Reservoir"Pond1"Results for Run"P5"
0.030 313.00
0.025- --i- - i -312.70
E 0.020- -
312.40
o 1
C
a 0.015- j- --- -312.10 m
W
MEI
GP ,,o,, 0.010- --+--- -- -311.80
1
111 0.005i - . --- I -311.50
• 0.000-
-311.20
3.0
•
• 2.5-
• 2.0-
•
• 1.5
3
0
• 1.0-
• 0.5-
0.0 ' 1 I i1 i I
kg 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
• I 16Sep1986
Legend(Compute Time:185ep201 i,20:16:48)
Run:PS Element:POND1 Result:Storage Run:P5 Element:POND1 Result:Pool Elevation
-Run:P5 Element:POND1 Resutt:0utflow --- Run:P5Element:POND1 Result:Combined Flow
CIF
•
•
Chiv
•
as
• Appendix A
CAL
10-YR EXISTING DISCHARGE SUMMARY
Project: Cal Simulation Run: El0
Start of Run: 165ep1986, 00:00 Basin Model: ExistingSystem
End of Run: 175ep 1986, 00:00 Meteorologic Model: 10 YR STORM
Compute Time: 18Sep2014, 20:17:22 Control Specifications: HYDROLOGY
i Show Elements: Volume Units: 0 IN AC-FT Sorting: Hydrologic v
a
0, Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg 0.004481 16.3 165ep1986, 12:07 5.81
r FrontOfBldg 0.004170 16.0 165ep1986, 12:07 6.40
di StudyPt 0.008651 32.4 165ep1986, 12:07 6.09
a
IMO
AI
Appendix A
a
CAL
10 YEAR EXISTING OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"E10"
35
30-
25-
•
• 20-
•
• o
E.- 15-
11
• 10- --...
1
t
5-
!
00:00 03:00 06:00 09:00 12:00 15:00 16:00 21:00 00:01
16Sep1986
Legend(Compute Time:185ep2014,20:17:22)
RumE10 Element:STUDYPT Result:Outflow ——-Run:El0 Element:REAROFBLDG Result:Outflow
Run:El 0 Element:FRONTOFBLDG Result Outflow
• (
IOW
•
•
sYfY11'
Appendix A
a
•
•
•
•
S
•
S
S
• CAL
10-YR PROPOSED DISCHARGE SUMMARY
S
S
•
•
S
Project: Cal Simulation Run: P10
L. Start of Run: 165ep1906, 00:00 Basin Model: ProposedSystem
• End of Run: 17Sep 1986, 00:00 Meteorologic Model: 10 YR STORM
• Compute Time: 185ep2014, 20:17:47 Control Specifications: HYDROLOGY
Show Elements: 'Hrite, Volume Units: IN AC-FT Sorting: Hydrologic.
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
R.earOfBldg 0.005107 18.8 165ep1986, 12:07 5.92
FrontOfBldg 0,003094 11,9 165ep1986, 12:07 6,38
ProposedBldg 0.000670 2.8 165ep1986, 12:07 7.32
Ponds 0,000670 1,6 165ep1986, 12:17 7.32
StudyPt 0.008871 32,0 165ep1986„ 12:07 6.18
•
•
C
Appendix A
S
0
CAL
10 YEAR PROPOSED OUTFLOW HYDROGRAPH
,
Junction"StudyPt"Results for Run"P10"
35
30-
25-
20-
f
,y 15-
10-
5- f; 1‘
11
0 1 —' _-_ •11 •-- _;--------------_____
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
16Sep1986
Legend(Compute Time:18Sep2014,20:17:47)
Run:P10 Element:STUDYPT Result:Outflow ——-Run:P10 Element:REAROFBLDG Result:Outflow
Run:P10 Element:FRONTOFBLDG Result:Outflow —-— Run:P10 ElementPOND1 Result Outflow
Appendix A
C
C
C
• CAL
0 DETENTION POND SUMMARY
• FOR 10-YR STORM
0
•
•
• Reservoir"Pond1"Results for Run"P10"
-
0.030-
i
313.06
• p 0. I025 — — -312.71
• a 0.020- —
I i — -312.37
• -
m 0.015- -312.03 w
`o
• co 0.010
• —
311.69
!! MEI0.005- 1 - •--- -- -311.34
• 0.000 311.00
3.0
r
2.5-
II. 2.0-
S
LI' 1.5-
3
0
1.0-
i k
0.5- 1
(Ili. 0.0 , I I I I I i
• 00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
( 16Sep1986
Legend(Compute Time:185ep2014,20:17:47)
L, Run:P10 Element:POND1 Result:Storage Run:P10 Element POND1 Resutt:Pool Elevation
Run:P10 Element:POND1 Result:Outflow --- Run:P10 Element:POND1 Resutt:Combined Flow
'rte
•
0
C.
• Appendix A
•
r
•
• CAL
• 25-YR EXISTING DISCHARGE SUMMARY
•
C
Project: Cal Simulation Run: E25
Start of Run: 165ep1986, 00:00 Basin Model: ExistingSystem
End of Run: 175ep1986, 00:00 Meteorologic Model: 25 YR STORM
Compute Time: 18Sep2014, 20:18:14 Control Specifications: HYDROLOGY
— Show Elements: All Elements Volume Units: IN 1: AC-FT Sorting: Hydrologic v
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg •
0.004481 19.2 165ep1986, 12:07 6.85
FrontOfBldg 0.004170 18.7 165ep1986„ 12:07 7.45
4 StudyPt 0.008651 37.9 165ep1986., 12:07 7.14
C
C
C
C
C
C
C
C
C
C
Appendix A
C
C
•
• CAL
25 YEAR EXISTING OUTFLOW HYDROGRAPH
.
.
.
.
.
Junction"StudyPt"Results for Run"E25"
• 40
• 35-
.
. 30-
25-
20-
•
0-2520-
• LL
. 15-
10-
1111
5-10- I�
Il
rfr t
5- 1
00:00 03:00 06:00 09:00 12:00 15:00 10:00 21:00 00:01
• 16Sep1906
Legend(Compute Time:18Sep2014,20:18:14)
Run:E25 Element:STUDYPT Result:Outflow ---Run:E25 Element REAROFBLDG Result Outflow
Run E25 Element FRONTOFBLDG Result:Outflow
•
S
.
• Appendix A
CAL
25-YR PROPOSED DISCHARGE SUMMARY
Project: Cal Simulation Run: P25
Start of Run: 165ep1986, 00:00 Basin Model: ProposedSystem
End of Run: 17Sep1986, 00:00 Meteorologic Model: 25 YR STORM
Compute Time: 185ep2014, 20:18:43 Control Specifications: HYDROLOGY
Show Elements: All Elements Volume Units: ® IN ,11;:, AC-FT Sorting: Hydrologic Ne_,
r
Hydrologic Drainage Area Peak DischargeTime of Peak Volume
Element (MI2) (CFS) (IN)
lRearOfBldg 0.005107 22.1 16Sep1986, 12:07 6,95
FrontOfBldg 0.003094 13.8 165ep1986, 12:07 7,43
ProposedBldg 0.000670 3.2 165ep1986, 12:07 8,39
;Pand1 0.000670 1.8 165ep1986, 12:18 8.39
StudyPt 0.008871 37.4 165ep1986, 12:07 7.23
I
Appendix A
CAL
25 YEAR PROPOSED OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"P25"
40
35- -..1
i
_.._---�___._____.....__�
30-
I
i
25- --_.____._..__
I
1
I
o , I
LL
15- .—._. ...---- r. 1 T ;.-____
1 is i
G,1
1
I NO
1,;1tl 1
If
1
l T
5 =---ji
.`
r..- •�----__�--------
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
I 16Sep1986
Legend(Compute Time:18Sep2014,20:10:43)
Run:P25 Element:STUDYPT Result:Outflow ———Run:P25 Element:REAROFBLOG Result:Outflow
-- ---Run:P25 EIement:FRONTOFBLDG Result:Outflow —-—•Run:P25 Element:POND1 Result:Outflow
Appendix A
CAL
DETENTION POND SUMMARY
FOR 25-YR STORM
Reservoir"Pond1"Results for Run"P25"
0.045 314.00
0.040 i.-.--- hk- ------- -313.67
0.035 — — — 313.33
E 0.030- - ---- - ----- i \ - ---- -313.00
d 0.025 -- G 1111; - -- -312.67 g
m
m
c 0.020- --t -312.33 w
62, 0.015- ---___ + - - -312.00
0.010- _ I -311.67
0.005- -311.33
0.000- 311.00
3.5
3.0- t
II
!I
2.5- III
t
2.0- I I-
N
V 1
0 1.5- I I ---
LL It
1.0 I
t
1
0.5-
I i I I I I
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
I 16Sep1986
Legend(Compute Time:185ep2014,20:18:43)
Run:P25 Element:POND1 Result:Storage Run:P25 Element:POND1 Result:Pool Elevation
Run:P25 Element:POND1 Resul:Outflow ---- Run:P25 Element:POND1 Resul:Combined Flow
Appendix A
CAL
50-YR EXISTING DISCHARGE SUMMARY
Project: Cal Simulation Run: E50
Start of Run: 165ep1986, 00:00 Basin Model: ExistingSystem
End of Run: 175ep1986, 00:00 Meteorologic Model: 50 YR STORM
Compute Time: 18Sep2014, 20:19:13 Control Specifications: HYDROLOGY
5hov' Elements: Volume Units: ; IBJ (I: AC-FT Sorting: Hydrologic v
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg__ 0.004481 21,6 165ep1986, 12:07 8.20
C FrontOfBldg 0.004170 20.7 165ep1986, 12:07 8.82
C StudyPt 0.008651 42.3 165ep1986, 12:07 8.50
C
•
•
3
3
•
- Appendix A
CAL
50 YEAR EXISTING OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"E50"
45
40-
35-
30-
25-
0 20- 11
\15 f
1
1
1
10-
5- 1 1
! 1
00:00 03:00 05:00 09:00 12:00 15:00 18:00 21:00 00:01
16Sep1906
Legend(Compute Time:185ep2014,20:19:13)
Run:E50 Element:STUDYPT Result:Outflow --—-Run:E50 ElementREAROFBLDG Result:Outflow
Run:E50 Element:FRONTOFBLDG Result:Outflow
Appendix A
CAL
50-YR PROPOSED DISCHARGE SUMMARY
Project: Cal Simulation Run: P50
Start of Run: 165ep1986, 00:00 Basin Model: ProposedSystem
End of Run: 175ep1986, 00:00 Meteorologic Model: 50 YR STORM
Compute Time: 18Sep2014, 20:19:40 Control Specifications: HYDROLOGY
Show Elements: ',II Elerm,ents Volume Units: IN 0 AC-FT Sorting: Hydrologic se
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg 0.005107 24.7 165ep1986, 12:07 8,31
Front(fBldg 0.003094 15.4 165ep1986, 12:07 8.80�i
ProposedBldg 0.000670 3.5 165ep1986, 12:07 9.79
Pond1 0.000670 1.9 165ep1986, 12:18 9.79
StudyPt 0.008871 41.7 165ep1986, 12:07 8.59
Appendix A
CAL
50 YEAR PROPOSED OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"P50"
45
40-
35-
30-
25-
ti 1
0 20-
LL V
1
15- ?1
L':l
• I;tl
0-
Itil
•
1
11111
111
00:00I Th-
03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
. Legend(Compute Time:185ep2014,20:19:40) 16Sep1986
• —Run:P50 Element:STLOYPT Result:Outflow ---Run:P50 Element:REAROFBLDG Result.Outflow
Run:P50 Element:FRONTOFBLDG Result:Outflow - Run:P50 EIementPOND1 Result:Outflow
• /
•
•
•
•
•
•
•
•
Appendix A
•
•
CAL
DETENTION POND SUMMARY
FOR 50-YR STORM
Reservoir"Pond1"Results for Run"P50"
;,
0.04- i --- -313.80
E.
6 0.03- -F ---i------ -- -313.10 -
Q n
mal m
`>E 0.02- ___ —___ -312.40 �'
0
co I
I iniI
0.01- 311.70
0.00 311.00
4.0
3.5-
3.0-
2.5-
w 2.0-
O I
1.5- I
I
4
1.0- l
I 1
0.5- 1
0.0 ' I I i I I I I
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
16Sep1986
Legend(Compute Time:185ep2014,20:19:40)
Run:P50 Element:POND1 Result:Storage Run:P50 Element:POND1 Result:Pool Elevation
Run:P50 Element:POND1 Result:Outflow --- Run:P50 Element:POND1 Result Combined Flow
Appendix A
CAL
100-YR EXISTING DISCHARGE SUMMARY
Project: Cal Simulation Run: E100
Start of Run: 165ep1906, 00:00 Basin Model: ExistingSystem
End of Run: 17Sep1986, 00:00 Meteorologic Model: 100 YR STORM
Compute Time: 185ep2014, 20:20:11 Control Specifications: HYDROLOGY
Show Elements: All Element-,� Volume Units: ::_ IN AC-FT Sorting: [Hydrologic
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg 2 0.004481 23.8 165ep1986, 12:07 9,37
FrontOfbldg 0.004170 22,7 165ep1986, 12:07 10,00
StudyPt 0,008651 46.5 165ep1986, 12:07 9.68
I if
1
Appendix A
CAL
100 YEAR EXISTING OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"E100"
50
45-
40-
35-
30-
3 25-
3
LL 11
20- I4
15- It 1
1
10-
I 1
5-
•
i
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
16Sep1986
Legend(Compute Time:185ep2014,20:20:11)
Run:E100 EIement:STUDYPT Resuft:Outflow ---Run:E100 EIement:REAROFBLDG Resul:Outflow
Run:E100 Element:FRONTOFBLDG Result:Outflow
•
.
.
. Appendix A
CAL
100-YR PROPOSED DISCHARGE SUMMARY
Project: Cal Simulation Run: P100
Start of Run: 165ep1986, 00:00 Basin Model: ProposedSystem
End of Run: 175ep1986, 00:00 Meteorologic Model: 100 YR STORM
Compute Time: 185ep2014, 20:20:44 Control Specifications: HYDROLOGY
Show Elements: All Volume Units: () IN 0 AC-FT Sorting: [_Hydrologic V
Hydrologic Drainage Area Peak Discharge Time of Peak Volume
Element (MI2) (CFS) (IN)
RearOfBldg 0.005107 27.2 165ep1986, 12:07 9.48
FrontOfBldg 0.003094 16.9 165ep1986, 12:07 9.98
ProposedBldg 0.000670 3.8 165ep1986, 12:07 10.99
Pond 1 0.000670 2.0 165ep1986, 12:19 10.99
5tudyPt 0.008871 45.8 165ep1986, 12:07 9.77
•
•
. Appendix A
0
0
CAL
100 YEAR PROPOSED OUTFLOW HYDROGRAPH
Junction"StudyPt"Results for Run"P100"
50
45-
40-
35-
30-
25- �
1
o l
LL 20- 1
15- '1
'1
;1
I it
10- 1, ;1
7: ;1
I It
5-
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:01
- I 16Sep1986
Legend(Compute Time:185ep2014,20:20:44)
—Run:P100 Element:STUDYPT Result:Outflow ----Run:P100 Element:REAROFBLDG Result:Outflow
• Run:P100 Element:FRONTOFBLDG Result:Outflow —-— Run:P1 00 Element:POND1 Result Outflow
-
-
11111
4111
•
r
fin
Appendix A
CAL
DETENTION POND SUMMARY
FOR 100-YR STORM
Reservoir"Pond1"Results for Run"P100"
0.06 315.00
0.05- ---III i
-314.33
It I
0.04- - I i . -- --. -313.67
a I � 1
0.03- I — 313.00
aa l
1.-
LT
o ¢ -- -312.33
- 0.02-
r
0.01- 1'1 -�- --- — -311.67
L .__ i '..--_ _ ._r- - - -
0.00 -311.00
4.0
1
3.5- l
I
3.0- I
I
I
2.5- 1
III I
2.0-
aI
III
, t_5- I
I
1.0- r t
r I
• 0.5
___1
• 00
00:00 03:00 06:00 09:00 12:00 15:00 18:00 21:00 00:00
• 16Sep1986
Legend(Compute Time:185ep2014,20:20:44)
• Run:P100 Element:POND1 Result:Storage Run:P100 Element POND1 Result:Pool Elevation
--- Run:P100 Element:POND1 Result:Outflow --- Run:P100 Element:POND1 Result:Combined Flow
IIII-
-
III
-
ID
-
•
III
• Appendix A
III
a