HomeMy WebLinkAboutDevelopment Permit (*ffS4441 DEVELOPMENT PERMIT
PERMIT NO. 14-265
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
CITY aeCOW-ceSTATION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
A000701 1300 George Bush Dr, College Station, TX 77845
Crawford Burnett (ICL) DRAINAGE BASIN:
Tract 187 Wolf Pen Creek
DATE OF ISSUE: 12/18/2014 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Jon Hall - College Station ISD
2000 Welsh Street
College Station, TX 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: TXDOT permit has not been approved, prcoeed at own risk. Landscape plans have not been
approved, and needs to be address prior full building permit.
I, ( (Lt_ 5 'X/E, , the Contractor, hereby agree to comply with all conditions herein.
2-7/9//4
Contractor Signature Date
Z/U-fib a'2��� �7�'re/C S 3L E-4/S.Cu!'n1
Phone number E-mail
I hereby grant this permit for development. Contact 3o)eS 777 - 1/S94 the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
i
aoi4
Ci Engineer/Representative Date
"r DEVELOPMENT PERMIT
PERMIT NO. 14-265
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
( r
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
A000701 1300 George Bush Dr, College Station, TX 77845
Crawford Burnett (ICL) DRAINAGE BASIN:
Tract 187 Wolf Pen Creek
DATE OF ISSUE: 12/18/2014 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Jon Hall - College Station ISD
2000 Welsh Street
College Station, TX 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (N01) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: TXDOT permit has not been approved, prcoeed at own risk. Landscape plans have not been
approved, and needs to be address prior full building permit.
, the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature Date
Phone number E-mail
I hereby grant this permit for development. Contact Job.CS 777- 1S911 , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
1a - w- a 01 4
Ci Engineer/Representative Date
(*.#"" DEVELOPMENT PERMIT
PERMIT NO. 14-265
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
CEI l'P41 Wang 6 Darla/wk.,cma,OFCOLLEGE STATION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
A000701 1300 George Bush Dr, College Station, TX 77845
Crawford Burnett (ICL) DRAINAGE BASIN:
Tract 187 Wolf Pen Creek
DATE OF ISSUE: 12/18/2014 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Jon Hall - College Station ISD
2000 Welsh Street
College Station, TX 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: TXDOT permit has not been approved, prcoeed at own risk. Landscape plans have not been
approved, and needs to be address prior full building permit.ee
I, Lai c. I z /FS , the Contractor, hereby agree to comply with all conditions herein.
(--f)ate".4) /2_//(V, y
Contractor Signature Date
Z I U— C 3 E; )4K_/ES q JOE i s LJ v✓'
Phone number E-mail
I hereby grant this permit for development. Contact 7eYY'y lopes 777 - 1694 , the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
r
x014
Ci Engineer/Representative Date
MITCHELL
MM
MORGAN
Danielle Singh, P.E. November 21, 2014
City of College Station
1101 Texas Avenue
College Station, TX 77842
Re: CSISD COLLEGE VIEW HIGH SCHOOL (CAL) - TxDOT PERMIT
Dear Danielle,
Please see below for our response to the TxDOT comments for the CSISD College View
High School (CAL) TxDOT permit:
TxDOT
1. Proposed median does not meet the TxDOT access management guidelines for a
right-in / right-out only access point, the median needs to be more substantial so there
is no question regarding the intended function of this access point, also required is a
restriping eliminating the left turn lane assuring south bound traffic no option to left into
property from George Bush Dr. Before access can be approved these revisions must
be implemented into the property's proposed plan and commercial access
request. We look forward to reviewing the revised proposal for access on the land use
/ access change.
Response: The median has been modified to be more substantial to direct
users in a manner that discourages left in/left out movements. Because of the
limited throat depth available, we had to remove two existing parking spaces to
modify the driveway median as shown. It was also our understanding in a
previous meeting with TxDOT that they had agreed to restripe George Bush
Drive as to not allow the left in movement.
If ,• have any questions or comments, please feel free to call our office at 979-260-6963.
S ,erely, /
ii
11,1 N �J
Veronica .
J. or , PE, CFM
Managing Partner
Cc: File
3204 EARL RUDDER FWY.S. • COLLEGE STATION,TX 77845 • T 979 260 6963 • F 979 260 3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
® Permit to Construct Access Driveway Facilities (Rev o5713)
Af
on Highway Right of Way Page 1 of 2
Department
o/Transportation
PERMIT NUMBER:
GPS* ROADWAY
REQUESTOR LATITUDE,LONGITUDE HWY NAME FM 2347
30°36'45.49"N,96°19'48.90W FOR TxDOT'S USE
CONTROL
NAME College Station Independent School District SECTION
MAILING ADDRESS 2000 Welsh
CITY,STATE,ZIP College Station,Texas 77840
PHONE NUMBER Theo Rouse 979-694-5634
`GLOBAL POSITIONING SYSTEM COORDINATES AT INTERSECTION OF DRIVEWAY CENTERLINE WITH ABUTTING ROADWAY
The Texas Department of Transportation, hereinafter called the State, hereby authorizes College Station Independent School District,
hereinafter called the Permittee,to ❑ construct/ ❑x reconstruct a School (residential, convenience
store, retail mall, farm, etc.)access driveway on the highway right of way abutting highway number FM2347 in Brazos County
County, located approximately 340-feet southwest of the intersection of George Bush Drive(FM2347)and Holik Street
USE ADDITIONAL SHEETS AS NEEDED
Subject to the Access Driveway Policy described on page 2 and the following:
1. The undersigned hereby agrees to comply with the terms and conditions set forth in this permit for construction and maintenance
of an access driveway on the state highway right of way.
2. Design of facilities shall be as follows and/or as shown on sketch on page 2 and is subject to conditions stated below:
We are requesting to modify the existing driveway located approximately 340-feet southwest of the intersection of George
Bush Drive(FM2347)and Holik Street by adding a median that will limit the drivers to right-in right-out maneuvers only.
Please see the attached site plan for the driveway layout and the construction plan sheet with the construction details.
All construction of materials shall be subject to inspection and approval by the State.
3. Maintenance of facilities constructed hereunder shall be the responsibility of the Permittee, and the State reserves the right to
require any changes, maintenance or repairs as may be necessary to provide protection of life or property on or adjacent to the
highway. Changes in design will be made only with approval of the State.
4. The Permittee shall hold harmless the State and its duly appointed agents and employees against any action for personal injury or
property damage sustained by reason of the exercise of this permit.
5. Except for regulatory and guide signs at county roads and city streets, the Permittee shall not erect any sign on or extending over
any portion of the highway right of way, and vehicle service fixtures such as fuel pumps, vendor stands, or tanks and shall be
located at least 12 feet from the right of way line to ensure that any vehicle services from these fixtures will be off the highway right
of way.
6. The State reserves the right to require a new access driveway permit in the event of a material change in land use or change in
driveway traffic volume or vehicle types.
7. This permit will become null and void if the above-referenced driveway facilities are not constructed within six (6) months from the
issuance date of this permit.
8. The Permittee will contact the State's representative
telephone, ( ) , at least twenty-four(24) hours prior to beginning the work authorized by this permit.
9. The requesting Permittee will be provided instructions on the appeal process if this permit request is denied by the State.
Date of Issuance State Authorized Representative
The undersigned hereby agrees to comply with the terms and conditions set forth ' this permit for co truction and maintenance of an
access driveway on the highway right of way. n, , �1�
Date: /B/7//y Signed: ffi
�ll' '
(Prope ,, !wne r wner's representative)
Form 1058 (Rev.05/13)
Page 2 of 2
Access Driveway Policy
Title 43 Texas Administrative Code (Transportation), Chapter 11 (Design), Subchapter C (Access Connections To State Highways) and
the "Access Management Manual" establish policy for the granting of access and the design, materials, and construction of driveways
connecting to state highways.All driveway facilities must follow this policy.
TxDOT Driveway Permit Request Contact
For a local contact for your TxDOT Driveway Permit Request visit: http://www.txdot.gov/inside-txdot/district.html. You can click on the
section of the map closest to your location to find the local TxDOT office. You can also click on the drop down box below the map to
find the district for your county.
Sketch of Installation
(Use additional sheets as needed)