HomeMy WebLinkAboutAmendment CONCEPT PLAN AMENDMENT
Chimney Hill Redevelopment
October 15, 2014
The following is a summary of changes to the approved Concept Plan requested via this amendment:
• The main building along the rear of the property that includes the parking garage has been
modified:
o The original building layout concentrated residential apartment uses along the east side
of the parking garage.
o The new layout includes the parking garage centered with hotel and residential uses as
book ends. In addition, a fire lane has been extended to provide for aerial access to the
west side of the building.
• Driveway access points along Tarrow have been modified to eliminate conflicts with the sight
visibility triangle near the west side of the site and the median gore section at the intersection
of Tarrow and East Tarrow.
• The building location for the commercial pad site at University Drive and East Tarrow has been
moved further back from University Drive with parking in front of the building.