Loading...
HomeMy WebLinkAboutStaff Review CITY OF COI L I;C:;i STATION Home of texas A&M University" MEMORANDUM 0-4 I DATE: November 21, 2014 TO: Terrence Murphy, TMFIVE Properties, LLC, via; terrencerealtor(a�gmail.com t---,-- FROM: Jerry CuarOn, Staff Planner SUBJECT: MURPHY II SUBDIVISION (MP) Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; If requesting a waiver, thirteen (13) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal(ccstx.gov. Upon receipt of the required documents. Your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84(a verizon.net L P&DS Project No. 14-00900272 Attachments: Staff Review Comments Planning dr Development Services p.(). a 9960 • 1101 FEXAS AVENUE •(:OL.,l F'GE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 97 9.704.3490 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: Murphy II Subdivision (MP) (14-00900272) PLANNING 1. Please adjust acreage on Existing Conditions remainder of tract 0..194 acres. 2. Please revise or request a waiver as this as this plat must meet UDO Sec. 12-8.3 (H) "Platting and Replatting within Older Residential Subdivisions" which includes at least 8,500 square feet for each lot and exceed the average lot width of the lots on the block. If requesting a waiver, provide the square feet of each proposed lot and the average lot width of the lots in the block. 3. Please change "Certificate of City Planner" to "Certificate of Planning and Zoning Commission." 4. Please revise application page 3 of 9 to request a waiver and pay the additional fee of $232 for a Final Plat — replat application. If submitting for a waiver request please also pay the waiver request fee of$233. 5. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. 6. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Reviewed by: Jerry Cuaron Date: November 21, 2014 ENGINEERING COMMENTS NO. 1 1. Please use updated F.E.M.A. map dated April 2, 2014 when determining if property is in floodplain. 2. Please provide a 10 feet PUE at the rear of the lots. Reviewed by: Kevin Ferrer Date: November 17, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(c�cstx.gov , sweido(a�cstx.gov , or wdavis(c�cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 6. The following easements will be required: 10' PUE easement in the back of the property, or rear lot line. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: November 10, 2014 FIRE 1. No comments at this time Reviewed by: Steve Smith Date: November 17, 2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: November 13, 2014 -1..... ( CITY OF COLLEGE STATION Home of Texas A&M University* MEMORANDUM DATE: November 10, 2014 TO: Terrence Murphy, TMFIVE Properties, LLC, via; terrencerealtor@qmail.com FROM: Jerry Cuaron, Staff Planner SUBJECT: MURPHY II SUBDIVISION (MP) Thank you for the submittal of your Final Plat - Minor or Amending application. Kevin Ferrer, Graduate Engineer I, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, November 24, 2014. If you have questions in the meantime, please feel free to contact us. PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84©verizon.net P&DS Project No. 14-00900272 Planning 6.Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE•COLLEGE STATION•TEXAS •77841 TV! 079 -A4 157(1 •FAX 979 764.3496