Loading...
HomeMy WebLinkAboutStaff Review P- 4114 rk CITY OF COIJEGE STATION Home of Texas AcFM University` fi 00 • MEMORANDUM DATE: November 24, 2014 TO: James Batenhorst, PE, Mitchell & Morgan, LLP, via; jamesmitchellandmorqan.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: 306 REDMOND TOWNHOMES (REZ-PDD) Staff reviewed the above-mentioned PDD rezoning as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments One (1) 24"x36" copy of the revised Rezoning Map; One (1) 24"x36" copy of the revised Concept Plan; One (1) copy of a flood study for the proposed project; and One (1) copy of the digital file of the revised rezoning Metes & Bounds on diskette or e-mail to pdsdigitalsubmittalAcstx.gov. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all required items are not received, your project will be not be scheduled on the P&Z agenda. Your project may be placed on a future agenda once all comments have been addressed and the appropriate re-advertising fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Garry Huff, Meridian H & H, LLC, via; huffdrg(c,aol.com Thomas Sitton, GT Sitton, LLC, via; thomassitton(a�gmail.com P&DS Project No. 14-00900271 Planning e' Development Services P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 STAFF REVIEW COMMENTS NO. 1 Project: 306 REDMOND TOWNHOMES (REZ-PDD) — (14-00900271) PLANNING 1. As discussed in a phone conversation with Thomas Sitton on November 11th, due to the timing of the project, it is his desire to potentially develop some of the property as attached units. If so, please revise the application and Concept Plan to accommodate the different uses and zoning requirements, as the current request only permits detached townhomes utilizing T Townhouse zoning as the base zoning district. Revisions to the request will need to be evaluated when they are submitted for review. 2. As this area is designated Natural Areas Reserved on the Comprehensive Plan Future Land Use and Character Map but is currently zoned for development, provide a flood study showing the impact of the development and proposed drainage-related mitigation. The flood study is needed to have the request evaluated and forwarded for consideration as it is otherwise not in compliance with the Comprehensive Plan. As mentioned previously, one component necessary to have staff support of the request is to have a reduction of flooding risk in the area. 3. The metes and bounds boundary of the Re-Zoning Map does not close. Please revise. Reviewed by: Jason Schubert Date: November 24, 2014 ENGINEERING COMMENTS NO. 1 1. Submit flood study showing compliance with No Adverse Impact (NAI), proposed mitigation and community benefit. 2. More clearly define the limits of floodplain on the property. As depicted, there could be some confusion that floodplain is on other side of the denoted line and does not impact lot at all. 3. Add note to Concept Plan regarding floodway and restrictions from placement of fill, vehicles, yard accessories or anything that could restrict flow of water directly or by become floatable during rain events. 4. Show location of existing opposite driveways so the proposeddriveway location can be evaluated. Reviewed by: Carol Cotter Date: November 21, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(a�cstx.gov , sweidoP,cstx.gov , or wdaviscstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. NOTE: Any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. 2 of 3 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, and/or as shown on plat or site plan. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 6. The following easements will be required: 20' easement along the south right of way line of Redmond Drive. r 20' easement along perimeter of development. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: November 5, 2014 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: November 10, 2014 NOTE: Any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. 3 of 3 CITY OF COLLEGE STATION Home of Texas A&M University' 01)1 MEMORANDUM DATE: November 6, 2014 TO: James Batenhorst, PE, Mitchell & Morgan, LLP, via; james@mitchellandmorgan.com FROM: Jason Schubert, ACIP, Principal Planner SUBJECT: 306 REDMOND TOWNHOMES (REZ-PDD) Thank you for the submittal of your PDD Rezoning application. Carol Cotter, Assistant City Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Thursday, November 20, 2014. Please note that, as discussed, we are awaiting the submission of a flood study. If you have questions in the meantime, please feel free to contact us. PC: Garry Huff, Meridian H & H, LLC, via; huffdrg@aol.com v J Thomas Sitton, GT Sitton, LLC, via; thomassittonAgmail.com P&DS Project No. 14-00900271 Planning e'r Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION•TEXAS •7784? rn n.m 'tA xe-sn r.Av (ff1 ^.rr ninr