HomeMy WebLinkAboutDevelopment Permit DEVELOPMENT PERMIT
PERMIT NO. SP2015-000006
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
CITY aFCOLLEGE ameniCION
Ylanxi+�G-.7nri��purn�Srnrm RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Eastmark Phase 2 911 Southwest Parkway
Lot 2R-2 DRAINAGE BASIN:
Schultz Office Complex Wolf Pen Creek
DATE OF ISSUE: 06/24/15 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
J2S2 Investments, LLC
3208 Innsbruck Circle
College Station, Texas 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: '' `` �
I, C1 �GNS'1�vcl�or� , l,t� , the Contractor, hereby agree to comply with all conditions herein.
/ r/15
C ractor Signature Date
q-n-it(iz-ozi ',(255e. durk4CoviocM,cun
Phone number �-rj ail
I hereby grant this permit for development. Contact &\`Ne-S, ( L-"1"') "7 LA-y51Ae Public Works
lnsp-ctor assigned to this project 24 hours prior to beginnin construction for scheduling required Inspections.
0 i All
• 01 •:.) , • 5
City Engineer/Representative Date