HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: Eastmark Ph II Blk A L2R-1&2R2 (FP-Replat) (14-00900282)
PLANNING
1. Please add a note that states For purposes of signage, Non-Residential Architectural
Standards, and landscaping Lots 2R-1 and 2R-2 will be considered one building plot. Added
2. Revise the Title Block to switch the order of Replat and Final Plat sections so that it is a
Final Plat being a Replat of Lot 2R, Block A. Revised
3. Remove the building setback lines and building outline from the Replat figure. Removed
4. Remove the setbacks listed in Note 4. Removed
5. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter. Added 10'x15' PUE for
future fire hydrant
6. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat. Acknowledged
Reviewed by: Jerry Cuaron Date: December 8, 2014
ENGINEERING COMMENTS NO. 1
1. Set a Finished Floor Elevation to confirm structure(s) on proposed Lot 2R-2 have
enough fall to connect to shallow public main. Added to plan and Plat
2. Segment of sanitary sewer main within 5 feet of pavement requires structural backfill.
Notation added
3. Provide "Letter Acknowledging City Standards". Provided with this Submittal
4. Provide Erosion Control measures. Added to plan
5. FYI-Surety will need to be provided or the infrastructure constructed and accepted
ahead of the plat being scheduled for Planning and Zoning Commission Meeting.
Acknowledged
Reviewed by: Carol Cotter Date: November 24, 2014
FIRE
1) Fire is okay with this project.
Reviewed by: Steve Smith Date: December 9, 2014
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: November 25, 2014
A'S(kir
CITY OF COLLEGE STATION
Home of Texas AeaM University'
MEMORANDUM
DATE: December 9, 2014
TO: United Way of the Brazos Valley, via; aprinceumbv.orq
FROM: Jerry Cuaron, Staff Planner
SUBJECT: EASTMARK PH II BLK A L2R-1&2R2 (FP-REPLA
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised final plat;
One (1) 24"x36" grading and erosion control plan;
Thirteen (13) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
pdsdigitalsubmittal(a�cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that this application will
expire in 90 days from the date of this memo, if the applicant has not provided written response
comments and revised documents to the Administrator that seek to address the staff review
comments contained herein. If all comments have not been addressed your project will not be
scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your
item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at
the following web site on Monday the week of the P&Z meeting.
http://www.cstx.qov/pz
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
PC: Civil Engineering Consultants, via; fpaine(u�cectexas.com
P&DS Project No. 14-00900282
Attachments: Staff Review Comments
Planning 6.Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842
TEL.979.764.3570•FAX. 979.764.3496
cstx.gov/devservices
STAFF REVIEW COMMENTS NO. 1
Project: Eastmark Phil BIk A L2R-1&2R2 (FP-Replat) (14-00900282)
PLANNING
1. Please add a note that states For purposes of signage, Non-Residential Architectural
Standards, and landscaping Lots 2R-1 and 2R-2 will be considered one building plot.
2. Revise the Title Block to switch the order of Replat and Final Plat sections so that it is a
Final Plat being a Replat of Lot 2R, Block A.
3. Remove the building setback lines and building outline from the Replat figure.
4. Remove the setbacks listed in Note 4.
5. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
6. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Reviewed by: Jerry Cuaron Date: December 8, 2014
ENGINEERING COMMENTS NO. 1
1. Set a Finished Floor Elevation to confirm structure(s) on proposed Lot 2R-2 have
enough fall to connect to shallow public main.
2. Segment of sanitary sewer main within 5 feet of pavement requires structural backfill.
3. Provide "Letter Acknowledging City Standards".
4. Provide Erosion Control measures.
5. FYI-Surety will need to be provided or the infrastructure constructed and accepted
ahead of the plat being scheduled for Planning and Zoning Commission Meeting.
Reviewed by: Carol Cotter Date: November 24, 2014
FIRE
1) Fire is okay with this project.
Reviewed by: Steve Smith Date: December 9, 2014
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: November 25, 2014
. ( '''' ..
CITY OP COLLEGE STATION
Home ofTexasA&M University" ' r,
MEMORANDUM
DATE: November 24, 2014
TO: United Way of the Brazos Valley, via; aprince(a uwbv.org V
FROM: Jerry Cuaron, Staff Planner
SUBJECT: EASTMARK PH II BLK A L2R-1&2R2 (FP-REPLAT)
Thank you for the submittal of your Final Plat - Commercial application. Carol Cotter, Assistant
City Engineer, and I have been assigned to review this project. It is anticipated that the review
will be completed and any staff comments returned to you on or before Tuesday, December 9,
2014. If you have questions in the meantime, please feel free to contact us.
PC: Civil Engineering Consultants, via; fpaine@cectexas.com ✓
P&DS Project No. 14-00900282
Planning 6.Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842
TFT (T79 7(,4 ',570•FAX 979.764.34 96
ENGINEERING COMMENTS NO. 1
1. Set a Finished Floor Elevation to confirm structure(s) on proposed Lot 2R-2 have
enough fall to connect to shallow public main.
2. Segment of sanitary sewer main within 5 feet of pavement requires structural backfill.
3. Provide "Letter Acknowledging City Standards".
4. Provide Erosion Control measures.
5. Building Plot note on 2004 Replat is not provided with this Replat.
6. Title Block— Switch order of Replat and Final Plat verbiage.
Reviewed by: Carol Cotter Date: November 24, 2014