HomeMy WebLinkAboutCost Estimate Engineer's Estimate of Infrastructure Construction Costs Brazos Valley Floor and Design November 12, 2014 Gessner Engineering, LLC GE Job#: 11-0355 WATER SYSTEM Item# Item Quanitiy Units Unit Cost Total 100 Demo, Remove, Replace Asphalt Pavement 120 SF $ 20.00 $ 2,400.00 Sub Total -Water System $2,400.00 Construction Cost $2,400.00 10% Contingency $240.00 Total Construction Cost $2,640.00 Engineer's Estimate of Infrastructure Construction Costs Brazos Valley Floor and Design November 12, 2014 Gessner Engineering, LLC GE Job#: 11-0355 WATER SYSTEM Item# Item Quanitiy Units Unit Cost Total 100 Demo, Remove, Replace Asphalt Pavement 120 SF $ 20.00 $ 2,400.00 Sub Total -Water System $2,400.00 Construction Cost $2,400.00 10% Contingency $240.00 Total Construction Cost $2,640.00 May 29, 2014 Mr. Alan Gibbs, P.E. City Engineer City of College Station 1101 Texas Avenue College Station,TX 77840 Re: Wastewater Design Report Brazos Valley Floor and Design 12900 Old Wellborn Road College Station, Texas Gessner Engineering Job No.: 11-0355 Dear Mr. Gibbs: The existing Brazos Valley Floor and Design building is served by an On-Site Sewage Facility (OSSF). The subject tract will also be serviced by an OSSF to be designed by others to support the adjacent existing facility as well. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, LLC F-7451 C11~.......til 5/2-VAT t� MELISSA .. 410 . ....98398 ,i Melissa P.Thomas, P.E. 't � ' OCE t •? `ftft : :O == Lessner Engineering 2501 Ashford Drive Joshua B. Van Wie, E.I.T., M.S. Suite 102 College Station,Texas 77840 P.O.Box 10763,77842-0763 979.680.8840 FAX 979.680.8841 2204 S.Chappell Hill St. Brenham,Texas 77833 979.836.6855 FAX 979.836.6847 May 29, 2014 Mr. Alan Gibbs, P.E. City Engineer City of College Station 1101 Texas Avenue College Station,TX 77840 Re: Domestic Water Report Brazos Valley Floor and Design 12900 Old Wellborn Road College Station, Texas Gessner Engineering Job No.: 11-0355 Dear Mr. Gibbs: The subject tract is served water by Wellborn Special Utility District and will not require service from College Station Utilities. Please contact us if you have any questions or if we can be of further assistance. Sincerely, GESSNER ENGINEERING, LLC F-7451 TFC.X11 %* ' 5/i: ; � t...,s.. •� `- NOMAS ����/� ♦ ! '` # GAEL . ........ ••� t .ilCEN?��°#' a Melissa P. Thomas, P.E. stop.. Lessner Engineering 2501 Ashford Drive Joshua B. Van Wie, E.I.T., M.S. Suite 102 College Station,Texas 77840 P.O.Box 10763,77842-0763 979.680.8840 FAX 979.680.8841 2204 S.Chappell Hill St. Brenham,Texas 77833 979.836.6855 FAX 979.836.6847