Brazos Valley Floor and Design
November 12, 2014
Gessner Engineering, LLC
GE Job#: 11-0355
WATER SYSTEM
Item# Item Quanitiy Units Unit Cost Total
100 Demo, Remove, Replace Asphalt Pavement 120 SF $ 20.00 $ 2,400.00
Sub Total -Water System $2,400.00
Construction Cost $2,400.00
10% Contingency $240.00
Total Construction Cost $2,640.00
Engineer's Estimate of Infrastructure Construction Costs
Brazos Valley Floor and Design
November 12, 2014
Gessner Engineering, LLC
GE Job#: 11-0355
WATER SYSTEM
Item# Item Quanitiy Units Unit Cost Total
100 Demo, Remove, Replace Asphalt Pavement 120 SF $ 20.00 $ 2,400.00
Sub Total -Water System $2,400.00
Construction Cost $2,400.00
10% Contingency $240.00
Total Construction Cost $2,640.00
May 29, 2014
Mr. Alan Gibbs, P.E.
City Engineer
City of College Station
1101 Texas Avenue
College Station,TX 77840
Re: Wastewater Design Report
Brazos Valley Floor and Design
12900 Old Wellborn Road
College Station, Texas
Gessner Engineering Job No.: 11-0355
Dear Mr. Gibbs:
The existing Brazos Valley Floor and Design building is served by an On-Site Sewage Facility
(OSSF). The subject tract will also be serviced by an OSSF to be designed by others to support
the adjacent existing facility as well.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLC F-7451
C11~.......til
5/2-VAT
t� MELISSA ..
410 . ....98398 ,i
Melissa P.Thomas, P.E. 't � ' OCE t •?
`ftft : :O == Lessner
Engineering
2501 Ashford Drive
Joshua B. Van Wie, E.I.T., M.S.
Suite 102
College Station,Texas 77840
P.O.Box 10763,77842-0763
979.680.8840
FAX 979.680.8841
2204 S.Chappell Hill St.
Brenham,Texas 77833
979.836.6855
FAX 979.836.6847
May 29, 2014
Mr. Alan Gibbs, P.E.
City Engineer
City of College Station
1101 Texas Avenue
College Station,TX 77840
Re: Domestic Water Report
Brazos Valley Floor and Design
12900 Old Wellborn Road
College Station, Texas
Gessner Engineering Job No.: 11-0355
Dear Mr. Gibbs:
The subject tract is served water by Wellborn Special Utility District and will not require service from
College Station Utilities.
Please contact us if you have any questions or if we can be of further assistance.
Sincerely,
GESSNER ENGINEERING, LLC F-7451
TFC.X11
%* ' 5/i: ;
� t...,s.. •� `- NOMAS
����/� ♦ ! '` # GAEL . ........ ••�
t .ilCEN?��°#' a
Melissa P. Thomas, P.E. stop.. Lessner
Engineering
2501 Ashford Drive
Joshua B. Van Wie, E.I.T., M.S.
Suite 102
College Station,Texas 77840
P.O.Box 10763,77842-0763
979.680.8840
FAX 979.680.8841
2204 S.Chappell Hill St.
Brenham,Texas 77833
979.836.6855
FAX 979.836.6847