Loading...
HomeMy WebLinkAboutDevelopment Permit ' DEVELOPMENT PERMIT PERMIT NO. 14-291 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CI RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: (Castlegate II Section 206) Greens Prairie Rd. & Etonbury Ave. A005401, R Stevenson (ICL), DRAINAGE BASIN: Tract 25 Peach Creek DATE OF ISSUE: 02/12/2015 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Wallace Phillips IV 4490 Castlegate Drive College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: No work on Waterlines until OP has been finalized. No work on the lift station until it has been completely approved. I, , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number / •r E-mail I hereby grant this permit for development. Contact lsrue I /'(O,le 777""bf , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. City En . r presentative Date :4(** DEVELOPMENT PERMIT PERMIT NO. 14-291 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CrrvorCOLLEGE SratION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: (Castlegate II Section 206) Greens Prairie Rd. & Etonbury Ave. A005401, R Stevenson (ICL), DRAINAGE BASIN: Tract 25 Peach Creek DATE OF ISSUE: 02/12/2015 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Wallace Phillips IV 4490 Castlegate Drive College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: No work on Waterlines until OP has been finalized. No work on the lift station until it has been completely approved. I, +loll 5. A,11,./e5 .Ill ln,Hj , the Contractor, hereby agree to comply with all conditions herein. /1/41 11/6/1-ST v3 , - I3-l5 Contractor Signature Date Phone number Ale I hereby grant this permit for development. Contact 1.-- Ile I I�0►le 777"6fist , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. Q �,�„ a-1z-- 13- City En r presentative Date