HomeMy WebLinkAboutStaff Review ,0,..,
„tow _
(iree,
44,,,savz. CITY OF COLLEGE STATION
Home of Texas A&M University`
CzMEMORANDUM
DATE: January 27, 2015
TO: Cody Sicinski, via; jsicinskiAjoeris.com ✓
FROM: Jessica Bullock, Staff Planner
SUBJECT: CSISD TIMBER PORTABLE BLDG (SP)
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
Two (2) 24"x36" revised site plans;
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please call me
at 979.764.3570.
Attachments: Staff review comments
PC: College Station ISD, via; rramirez@csisd.org J /
VLK Architects, via USPS; 7915 F.M. 1960 West Suite 214, Houston TX, 77070
P&DS Project No. 14-00900302
Planning 6 Development Services
P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STAITON •TEXAS •77842
TEL.979.764.3570•FAX. 979.764.3496
STAFF REVIEW COMMENTS NO. 2
Project: CSISD Timber Portable Bldg (SP) - 14-00900302
ENGINEERING COMMENTS NO. 2
1. The PUE lines and waterline still need to be shown on the plans. They have to correspond
to the approved site plans. If a different water line and PUE is being proposed from the
approved site plans, a resubmittal is required prior the approval of this plan.
Reviewed by: Kevin Ferrer Date: January 26, 2015
GricilliNk%
. 3
Ati,,,,,,A CITY OF COLLEGE STATION
Hftot
ome of Texas A&M University" .� g
Cr.,\2
MEMORANDUM
DATE: January 6, 2015 V TO: Cody Sicinski, via; jsicinski@joeris.com
FROM: Jessica Bullock, Staff Planner
SUBJECT: CSISD TIMBER PORTABLE BLDG (SP)
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
Two (2) 24"x36" revised site plans;
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Jessica Bullock at 979.764.3570.
Attachments: Staff Review Comments
/PC: College Station ISD, via; rramirez@csisd.or_
VLK Architects, via USPS; 7915 F.M. 1960 West Suite 214, Houston TX, 77070
P&DS Project No. 14-00900302
Planning e`Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE•COLLEGE STATION•TEXAS •77842
TEL.979.764.3570•FAX. 979.764.3496
STAFF REVIEW COMMENTS NO. 1
Project: CSISD Timber Portable Bldg (SP) 14-00900302
PLANNING
1. There is a 15-foot setback is requirement between the existing building and covered
walkway, please revise.
2. Please show fire hydrants. See fire comments below.
3. Please show existing parking spaces along Timber.
4. At this time I do not have electrical comments, I will follow-up with and email letting you
know if there are any comments.
5. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
Reviewed by: Jessica Bullock Date: 1/6/15
ENGINEERING COMMENTS NO. 1
1. Please show the proposed PUE line and waterline that is going through the lot, and ensure
that the portable building is not in the PUE and is at least 20 feet away from the waterline.
Reviewed by: Kevin Ferrer Date: 12/22/14
FIRE
1. I couldn't tell if the Portable was covered by a Fire Hydrant.
Reviewed by: Steve Smith Date: 12/28/14
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: 12/6/15
ig -
V L K
ARCHITECTS
January 27, 2015
Jessica Bullock, Staff Planner
City of College Station
1101 Texas Ave S
College Station, Texas 77840
RE: Timber Portable Bldg
College Station ISD
1300 George Bush Dr.
College Station,Texas 77840
Jessica Bullock,
The following are responses to comments generated from the City of College Station's Site Plan
Review, received on January 27, 2015. Responses are in Italics.
ENGINEERING COMMENTS NO. 2
1. The PUE lines and waterline still need to be shown on the plans. They have to correspond to the
approved site plans. If a different water line and PUE is being proposed from the approved site
plans,a resubmittal is required prior the approval of this plan.
The proposed PUE line and waterline has been revised and is clear of the area. Please see
attached revised sheet A1.11.
If further information is required to address the above listed comments please do not hesitate to
contact the office.
Thank you,
Ben Lamons
Enc: A1.11
Member American Inst€cute of Architects • 7915 F.M. 1960 West Suite 214 • Houston Texas 77070
Ph 281.671.2340 . Fax 281.671.2313 . vikarchitects.com
I I\
January 15, 2015
Jessica Bullock, Staff Planner
City of College Station
1101 Texas Ave S
College Station,Texas 77840
RE: Timber Portable Bldg
College Station ISD
1300 George Bush Dr.
College Station, Texas 77840
Jessica Bullock,
The following are responses to comments generated from the City of College Station's Site Plan
Review, received on January 6, 2015. Responses are in Italics.
PLANNING
1. There is a 15-foot setback requirement between the exiting building and covered walkway,
please revise.
The proposed covered walkway has been revised to meet setback requirements. Please see
attached revised sheet A1.11.
Please show fire hydrants. See fire comments below.
Existing fire hydrants have been located. Please see attached revised sheetA1.11.
"3. Please show existing parking spaces along Timber.
Existing parking spaces along Timber have been located. Please see attached revised sheet
A1.11.
4. At this time I do not have electrical comments, I will follow-up with and email letting you know if
there are any comments.
No response required at this time.
Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
There have not been any changes made other than the ones listed in this resubmittal.
Member American Institute of Architects • 7915 F,M. 1960 West Suite 214 • Houston Texas 77070
Ph 281.671.2300 • Fax 281.671.231 3 • vlkarchitects.com
ENGINEERING COMMENTS NO. 1
1. Please show the proposed PUE line and waterline that is going through the lot, and ensure that
the portable building is not in the PUE and is at least 20 feet away from the waterline.
The proposed PUE line and waterline is currently being redesigned away from this area,
therefore no easement will exist in this area.
FIRE
1. I couldn't tell if the Portable was covered by a Fire Hydrant.
Existing fire hydrants have been located. Please see attached revised sheet A1.11.
P_ ed ro cl.c-16—
SAN ITATION
,. Sanitation is ok with this project.
No response required at this time.
If further information is required to address the above listed comments please do not hesitate to
contact the office.
Thank you,
Ben Lamons
Enc: A1.11
fi
Member American Institute of Architects • 7915 F.M. 1960 West Suite 214 • Houston Texas 77070
Ph 281.671.2300 • Fax 281.671.2313 • vlkarchitects.com
1
Jessica Bullock
From: Wally Urrutia
Sent: Tuesday, January 06, 2015 11:41 AM
To: Jessica Bullock
Subject: RE: CSISD Timber Portable
Hi Jessica,
Didn't see that one, but we should be ok.
Thanks.
From:Jessica Bullock
Sent:Tuesday,January 06, 2015 11:13 AM
To: Wally Urrutia
Subject: CSISD Timber Portable
Wally,
Just checking to see if there were any comments for project 14-302. It is for a portable building that will be up while the
main building is worked on.
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1101 Texas Avenue
College Station, TX 77842
Office: 979.764.3570
Fax: 979.764.3496
Email:jbullock@cstx.gov
Website: www.cstx.gov
1
0
Jessica Bullock
From: Stephen Smith
Sent: Tuesday, January 06, 2015 3:19 PM
To: Jessica Bullock
Subject: RE: CSISD Timber Portable
The building will have to be within 300' where the truck would stop and no more than 150' past that to include the
entire building.
From:Jessica Bullock
Sent:Tuesday,January 06, 2015 1:29 PM
To: Stephen Smith
Subject: CSISD Timber Portable
Steve,
For project 14-302,your comment asked about the fire hydrants. What is the distance from the fire hydrant that the
building should be within?
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1 101 Texas Avenue
College Station, TX 77842
Office: 979.764.3570
Fax: 979.764.3496
Email:jbullock@cstx.gov
Website:www.cstx.gov
1
Jessica Bullock
From: Jessica Bullock
Sent: Tuesday, January 06, 2015 11:45 AM
To: Wally Urrutia
Subject: RE: CSISD Timber Portable
Sounds good! They are sticking with existing dumpsters, but I just wanted to double check with you.
From: Wally Urrutia
Sent:Tuesday,January 06, 2015 11:41 AM
To:Jessica Bullock
Subject: RE: CSISD Timber Portable
Hi Jessica,
Didn't see that one, but we should be ok.
Thanks.
From:Jessica Bullock
Sent:Tuesday,January 06, 2015 11:13 AM
To: Wally Urrutia
Subject: CSISD Timber Portable
Wally,
Just checking to see if there were any comments for project 14-302. It is for a portable building that will be up while the
main building is worked on.
Jessica Bullock
Staff Planner
Planning 8, Development Services
City of College Station
P.O. Box 9960
1 101 Texas Avenue
College Station, TX 77842
Office: 979.764.3570
Fax: 979.764.3496
Email:jbullock@cstx.gov
Website: www.cstx.gov
1
CASE NO.:FOR OFFICE USE ONLY...,
•
D
IT. _
DATE SUBMITTED: • 8'
TIME: B: so
CITY OF COLLEGE STATION
STAFF: (\-'c
Hent of Texa�tdyl�!University'
, PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to dearly define the purpose of your submittal.
O New Project Submittal
❑ Incomplete Project Submittal-documents needed to complete an application. Case No.:
g Existing Project Submittal. Case No.: I(1,3) 2—
project
Project Name -5 1Aer PbT'-'r&kle
Contact Name P one Number
We are transmitting the following for Planning&Development Services to review and comment(check all that apply).
❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
❑ Rezoning Application ❑ Irrigation Plan
• Conditional Use Permit ❑ Variance Request
❑ Preliminary Plan ❑ Development Permit
❑ Final Plat ❑ Development Exaction Appeal
[] Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan ❑ Grading Plan
❑ Special District Site Plan ❑ Other- Please specify below
O Special District Building/Sign
❑ Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
[] Comprehensive Plan Amendment ❑ Waterline Construction Documents
❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
❑ Drainage Letter or Report ❑ Easement Application
O Fire Flow Analysis ❑ Other- Please specify
Special Instructions:
10/10
FOR OFFICE USE ONLY •
CASE NO.:
DATE SUBMITTED: O( 119
TIME: :OQ
CITY OF COI I.FGl STATION J
Home of Texas Ae7M University" STAFF:
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
❑ Incomplete Project Submittal -documents needed to complete an application. Case No.:
Existing Project Submittal. Case No.: 14-00900302
Project Name CS/SD Timber Portable Building
Contact Name Cody Sicinski Phone Number 979-324-6917
We are transmitting the following for Planning & Development Services to review and comment(check all that apply):
U Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
Rezoning Application E Irrigation Plan
] Conditional Use Permit ❑ Variance Request
n Preliminary Plan ❑ Development Permit
❑ Final Plat ❑ Development Exaction Appeal
❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑x Site Plan _ Grading Plan
I Special District Site Plan [ Other- Please specify below
] Special District Building/Sign
n Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑ Comprehensive Plan Amendment ❑ Waterline Construction Documents
U TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
❑ Drainage Letter or Report ❑ Easement Application
n Fire Flow Analysis ❑ Other- Please specify
Special Instructions: