Loading...
HomeMy WebLinkAboutDevelopment Permit I 1 DEVELOPMENT PERMIT PERMIT NO. 14-302 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA olaw d'L`"r amt 'N RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE I�vNfNs'd'IyyYjyfN➢flvF Yyryrryry SITE LEGAL DESCRIPTION: SITE ADDRESS: A000701 1300 George Bush Dr. Crawford Burnett (ICL) DRAINAGE BASIN: Tract 187 Alum Creek DATE OF ISSUE: 02/06/2015 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Jon Hall - College Station ISD 2000 Welsh Street College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Speci/al Conditions: I, Loa/ <lc_‘ 1 ;15" -- the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact Je,,y yayp5 777 - jl$9q , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. City E ineer esentative Date DEVELOPMENT PERMIT (frffs44111 PERMIT NO. 14-302 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA Cm.OFCOLLEGE STATION RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: A000701 1300 George Bush Dr. Crawford Burnett (ICL) DRAINAGE BASIN: Tract 187 Alum Creek DATE OF ISSUE: 02/06/2015 VALID FOR 24 MONTHS OWNER: CONTRACTOR: Jon Hall - College Station ISD 2000 Welsh Street College Station, TX 77845 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: , the Contractor, hereby agree to comply with all conditions herein. Contractor Signature Date Phone number E-mail I hereby grant this permit for development. Contact jevr yayPs 777 - , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. City E ineer esentative Date