HomeMy WebLinkAboutDevelopment Permit C IDEVELOPMENT% PERMIT
PERMIT NO. 14-299
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
C.I"1YPionning QFCOLLEGE.STNtTIO
rn, RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
(Shipley Do-Nuts) 1760 Greens Prairie Road West
Caprock Crossing Ph 5 DRAINAGE BASIN:
Block 1, Lot 2R Spring Creek
DATE OF ISSUE: 3/13/2015 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Brazos Texas Land Development, LLC
PO Box 54
Wellborn, TX 77881
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
, the Contractor, hereby agree to comply with all conditions herein.
Contractor Signature Date
Phone number E-mail
I hereby grant this permit for development. Contact RM,/ Ay5 ersintr C979) 393- MI, , the Public Works
Inspector assigned to this project 24 hours prior to beginning eonstruccion for scheduling required Inspections.
3-/3-1°15-
City En /Representative Date
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station,Texas 77845
Firm No. 12327
Caprock Crossing 12" Waterline Extension
Engineer's Estimate for
Public Infrastructure Construction Improvements
Item Descri tion Estimated
p Unit Unit Price Total
Quantity
General Items
1 Mobilization,Overhead,General Conditions&Construction Staking LS I $ 5,000.00 $ 5,000.00
2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,000.00 $ 1,000.00
Filter Dam,etc.,complete in place
3 Hydromulch&Seeding,complete in place SY 250 $ 0.60 $ 150.00
General Items Subtotal $ 6,150.00
Water Construction Items
3 Connect to Existing 16"Water Line EA 2 $ 2,500.00 $ 5,000.00
4 16"C905 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 220 $ 80.00 $ 17,600.00
5 16"45°Bend,complete in place EA 3 $ 1,250.00 $ 3,750.00
6 16"22.5°Bend,complete in place EA I $ 1,250.00 $ 1,250.00
7 16"M.J.Butterfly Valve,complete in place EA 1 $ 12,000.00 $ 12,000.00
Water Line Testing LS 1 $ 1,000.00 $ 1,000.00
Water Construction Items Subtotal $ 40,600.00
General Items Subtotal $ 6,150.00
Water Construction Items Subtotal $ 40,600.00
TOTAL CONSTRUCTION $ 46,750.00
` i%
f/t7gok
I , ••
•t
•
11 DEVEN L. DOYEN 0
•
109835 ' %
,
e. 44._____
1P4'4010.•... ° 3/0 ti I a
FIRM # 12327
SCHULTZ ENGINEERING, LLC
Page 1 of 1
' DEVELOPMENT PERMIT
PERMIT NO. 14-299
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
ar,orCOLLEGE sr,,ION
Planning�rhwelyPosent.Se,t.�. RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
(Shipley Do-Nuts) 1760 Greens Prairie Road West
Caprock Crossing Ph 5 DRAINAGE BASIN:
Block 1, Lot 2R Spring Creek
DATE OF ISSUE: 3/13/2015 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Brazos Texas Land Development, LLC
PO Box 54
Wellborn, TX 77881
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions:
I, ( ' T ('Q61(-'C710,.1 ALL , the Contractor, hereby agree to comply with all conditions herein.
ES5 o 0 _31 i (24 ►s
C ractor Signature Pi 's'OL-T r Date
/ 75- Ligz- 0t-)2--5 I`eSse d rockx.cE�,
Phone number E-null
I hereby grant this permit for development. Contact RAI iYggevsin ley L979) 393- TOL , the Public Works
Inspector assigned to this project 24 hours prior to beginning eonstrucion for scheduling required Inspections.
City En r/Representative Date
Bryan W.Shaw,Ph.D.,P.E.,Chairman (sP'c E of
Toby Baker,Commissioner
�
Zak Covar,Commissioner ��� b ).
Richard A.Hyde,P.E.,Executive Director
TEXAS COMMISSION ON ENVIRONMENTAL QUALITY
Protecting Texas by Reducing and Preventing Pollution
March 16, 2015
Dear Applicant:
Re: TPDES General Permit for Construction Stormwater Runoff
Stormwater Notice of Intent Authorization
Your Notice of Intent application for authorization under the general permit for discharge of stormwater
associated with construction activities has been received. Pursuant to authorization from the Executive
Director of the Texas Commission on Environmental Quality,the Division Director of the Water Quality
Division has issued the enclosed Certificate.
Please refer to the attached certificate for the identification number that was assigned to your project/site and
the effective date.Please use this number to reference this project/site for future communications with the
Texas Commission on Environmental Quality(TCEQ).
Authorization under the Edwards Aquifer Protection Program is required before construction can begin where
the site is located within the Edwards Aquifer Recharge Zone,Contributing Zone,or Contributing Zone within
the Transition Zone. See http://www.tceq.texas.gov/field/eapp/program.html for additional information.
A Notice of Termination must be submitted when permit coverage is no longer needed.You may submit the
Notice of Termination form electronically as well. It is the responsibility of the Operator to notify the
TCEQ Stormwater Processing center of any change in address supplied on the original Notice of
Intent by submitting a Notice of Change.
For questions related to processing of forms you may contact the Stormwater Processing Center by email at
swpermit@tceq.texas.gov or by telephone at(512) 239-3700. If you have any questions regarding coverage
under this general permit or other technical issues,you may contact the stormwater technical staff by email at
swgp@tceq.texas.gov or by telephone at(512)239-4671 .Also,you may obtain information on the stormwater
web site at www.tceq.texas.gov.
Sincerely,
D„„,].t/ c,-130
David W. Galindo,Director
Water Quality Division
Texas Commission on Environmental Quality
P.O.Box 13087 • Austin,Texas 78711-3087 • 512-239-1000 • tceq.texas.gov
How is our customer service? tceq.texas.gov/customersurvey
'Ci
4-4
0 w
b13 r,
O o 0 3 td
Cd 0"0 '4 ti) 7
b O _-' ;'' a) I--1
a' •v. 5 o - 0.0 3 O
ccic. s� a) cd at +r
a° � � m
0 O -1
0 En 0 CI) -�• apo E +
ac.as a tia) +J
0.�: +J > 0
0
E-' o
W
o Cd CL)
'dLy. v�
tab' O p
E—•
a)
Il rnEn � 5a, � 0' •7, �'� x
o`no oi. p, Ho U U Ow
L: to +, cd y �l p , 0,
iCi �•o s. O O-� p of 0 co O
4el +' ° cCdOD ) Z co p0 •r.
ate+- .d,- 3 b +,'b� 0 -,•�'
° off � C � a.0-0i.
X tu o W p 0O R 0 °(y, H 41 >, o
0 114 0 O ›, O o MCF Z, �r +�•J
• -' 0i4z1°00
OO
9SQ .-t9
U O p kou . O
„sv
E. 4 0 Cl a. cd O td `" O 6 - a
.
• eO
(.7 ° o o N ; Ebe, al x O � a� c •• + 0 ODULMc, o.. cdc. �Ma -o
acv �
W 0 ,5} v) c
+- 4 y cd ,� n'b
V a
COwSWCd dcd HO > d a 'd,. 0 +'a
' a' ala E, oer o =' ° -
4.0 CL)
Qit u 0 F. cd'b a+ +, O a- C
-g 4, y0, a ,7; c) CLQ , a)� Or�„
0 cn p.ti U U to U,'CS cs T•+ i+,`''-'
M1 3 04 Nt0 a) O 0 . a) >,
... C
CA O O p o �O U CO M
O ++ .D c)'b y o y O 0
W wE ° aaitz�-• qn rn 00 Os, a) ¢, in
Ri
+
N.4. 442 o O cooO ,Wx to I
c. a) k °' � ° � E4 ° cn a. p
WF U ++ U 3 9 4-' CJ Ov 'b td v] cda
g 6
O'b x, • (9 to w Q+ E- t' 0 CI
CI
Z 0 dZ c/)4C1 O ya. o•�p+
c. ,-, E-' 0 p cd X
5 a) . oo U
?2 A+4• ° „ ��W 0 � . >, ai
a 00 ��a O � ocd ° •
,bw. � N
000 rocuE •o,iO,4 ; U� Na)
a) o 0 o 84 =8 Ex` O + tal)n� w
4C5 0
ZI 0't -5 a. a•,�h W A-a) o a , COUULEL,° O U °-, a ,H F . bbe Ha00
TCEQ ePay Page 1 of 1
Questions or Comments»
Shopping Cart Select Fee Search Transactions
Your transaction is complete.Thank you for using TCEQ ePay.
Note:It may take up to 3 working days for this electronic payment to be processed and be reflected in the
TCEQ ePay system.Print this receipt and the vouchers for your records.An email receipt has also been sent.
Important:This is a receipt for FEE PAYMENT ONLY.Your STEERS ePermits application is NOT complete. Please
return to STEERS ePermits to submit your application to TCEQ.
—Transaction Information
Trace Number: 582EA000187349
Date: 03/16/2015 11:45 AM
Payment Method: CC-Authorization 0000091721
Amount: $225.00
ePay Actor: Jesse Durden
Actor Email: jesse.durden@caprocktx.com
IP: 174.46.14.140
—Payment Contact Information
Name: Jesse Durden
Company: Crt Llc
Address: Po Box 54,Wellborn,TX 77881
Phone: 979-492-0425
—Cart Items
Click on the voucher number to see the voucher details.
Voucher Fee Description AR Amount
Number
236224 GENERAL PERMIT CONSTRUCTION STORM WATER DISCHARGE ELECTRONIC NOI $225.00
APPLICATON(REF 106161)
Total fees for transaction: $225.00
Return to STEERS)
Note:It may take up to 3 working days for this electronic payment to be processed and be reflected in the
TCEQ ePay system.Print this receipt for your records.
Site Help I Disclaimer I Web Policies I Accessibility I Our Compact with Texans I TCEQ Homeland Security I Contact Us
Statewide Links:Texas.gov I Texas Homeland Security I TRAIL Statewide Archive I Texas Veterans Portal
O 2002-2013 Texas Commission on Environmental Quality
Copy of Record Page 1 of 6
Texas Commission on Environmental Quality
Construction Notice of Intent
Site Information (Regulated Entity)
What is the name of the site to be authorized? Shipley Do-Nuts at Caprock Crossing
Does the site have a physical address? Yes
Physical Address
Number and Street 1760 GREENS PRAIRIE RD W
City COLLEGE STATION
State TX
ZIP 77845
County BRAZOS
Latitude(N) (##.#t#####) 30.33747
Longitude(W) (-###.;######) -96.155626
Primary SIC Code
Secondary SIC Code
Primary NAICS Code
Secondary NAICS Code
Regulated Entity Site Information
What is the Regulated Entity's Number(RN)?
What is the name of the Regulated Entity Shipley Do-Nuts at Caprock Crossing
(RE)?
Does the RE site have a physical address? Yes
Physical Address
Number and Street 1760 GREENS PRAIRIE RD W
City COLLEGE STATION
State TX
ZIP 77845
County BRAZOS
Latitude(N) (#4.######) 30.33747
Longitude(W) (-###.######) -96.155626
What is the primary business of this entity?
CRT CON-Customer (Applicant) Information
How is this applicant associated with this site? OPERATOR
CN604553321
Copy of Record Page 2 of 6
What is the applicant's Customer Number
(CN)?
Type of Customer Corporation
Full legal name of the applicant:
Legal Name CRT CONSTRUCTION LLC
Texas SOS Filing Number 801952100
Federal Tax ID
State Franchise Tax ID
DUNS Number
Number of Employees 0-20
Independently Owned and Operated? Yes
I certify that the full legal name of the entity Yes
applying for this permit has been provided and
is legally authorized to do business in Texas.
Responsible Authority Contact
Organization Name CRT CONSTRUCTION LLC
Prefix MR
First Jesse
Middle
Last Durden
Suffix
Title President
Responsible Authority Mailing Address
Enter new address or copy one from list:
Address Type Domestic
Mailing Address (include Suite or Bldg. here, if PO BOX 54
applicable)
Routing(such as Mail Code, Dept., or Attn:)
City WELLBORN
State TX
ZIP 77881
Phone (###-###-####) 9794920425
Extension
Alternate Phone(###-###-####)
Fax(###-#t#t######)
E-mail jesse.durden@caprocktx.com
Application Contact
Copy of Record Page 3 of 6
Person TCEQ should contact for questions
about this application:
Same as another contact? CRT CONSTRUCTION LLC
Organization Name CRT CONSTRUCTION LLC
Prefix MR
First Jesse
Middle
Last Durden
Suffix
Title President
Enter new address or copy one from list: CRT CONSTRUCTION LLC
Mailing Address
Address Type Domestic
Mailing Address (include Suite or Bldg. here, if PO BOX 54
applicable)
Routing(such as Mail Code, Dept., or Attn:)
City WELLBORN
State TX
ZIP 77881
Phone(###-###-####) 9794920425
Extension
Alternate Phone (###-#44-####)
Fax (###-#######)
E-mail jesse.durden@caprocktx.com
CNOI General Characteristics
1) Is the project located on Indian Country No
Lands?
2) Is your construction activity associated with No
a facility that,when completed,would be
associated with the exploration, development,
or production of oil or gas or geothermal
resources?
3)What is the Primary Standard Industrial 1542
Classification (SIC) Code that best describes
the construction activity being conducted at the
site?
4) If applicable,what is the Secondary SIC
Code(s)?
Yes
Copy of Record Page 4 of 6
5) Is the project site part of a larger common
plan of development or sale?
6)What is the total number of acres disturbed? 1
7)What is the name of the first water body(s) Spring Creek
to receive the stormwater runoff or potential
runoff from the site?
8) What is the segment number(s) of the 1209
classified water body(s)that the discharge will
eventually reach?
9) Is the discharge into an MS4? No
10)Are any of the surface water bodies No
receiving discharges from the construction site
on the latest EPA-approved CWA 303(d) List
of impaired waters?
11) Is the discharge or potential discharge No
within the Recharge Zone, Contributing zone,
or Contributing zone within the Transition zone
of the Edwards Aquifer, as defined in 30 TAC
Chapter 213?
12) I certify that a stormwater pollution Yes
prevention plan has been developed, will be
implemented prior to construction, and to the
best of my knowledge and belief is compliant
with any applicable local sediment and erosion
control plans, as required in the general permit
TXR150000. Note: For multiple operators who
prepare a shared SWP3,the confirmation of
an operator may be limited to its obligations
under the SWP3 provided all obligations are
confirmed by at least one operator.
13) I certify that I have obtained a copy and Yes
understand the terms and conditions of the
Construction General Permit(TXR150000).
14) I understand that a Notice of Termination Yes
(NOT) must be submitted when this
authorization is no longer needed.
Certification
I certify that I am authorized under 30 Texas Administrative Code Subchapter 305.44 to sign this document and can
provide documentation in proof of such authorization upon request.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true,
accurate, and complete. I am aware there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations.
Copy of Record Page 5 of 6
1. I am Jesse Durden, the owner of the STEERS account ER036646.
2. I have the authority to sign this data on behalf of the applicant named above.
3. I have personally examined the foregoing and am familiar with its content and the content of any
attachments, and based upon my personal knowledge and/or inquiry of any individual responsible for
information contained herein, that this information is true, accurate, and complete.
4. I further certify that I have not violated any term in my TCEQ STEERS participation agreement and that I
have no reason to believe that the confidentiality or use of my password has been compromised at any
time.
5. I understand that use of my password constitutes an electronic signature legally equivalent to my written
signature.
6. I also understand that the attestations of fact contained herein pertain to the implementation, oversight
and enforcement of a state and/or federal environmental program and must be true and complete to the
best of my knowledge.
7. I am aware that criminal penalties may be imposed for statements or omissions that I know or have
reason to believe are untrue or misleading.
8. I am knowingly and intentionally signing Construction Notice of Intent.
9. My signature indicates that I am in agreement with the information on this form, and authorize its
submittal to the TCEQ.
OPERATOR Signature: Jesse Durden OPERATOR
Account Number: ER036646
Signature IP Address: 174.46.14.140
Signature Date: 2015-03-16
Signature Hash: 6C190F4577CBCDA978E2E6C3462381DBDB731C14B9EF6A1ED53A7314256558D0
Form Hash Code at time ACFDDC570AC320FB0E6984D8C0766D4483B5788D460C09DA3A4CB4F21 FF89A36
of Signature:
Fee Payment
Transaction by: The application fee payment transaction was
made by ER036646/Jesse Durden
Paid by: The application fee was paid by JESSE
DURDEN
Fee Amount: $225.00
Paid Date: The application fee was paid on 2015-03-16
TransactionNoucher number: The transaction number is 582EA000187349
and the voucher number is 236224
Submission
Reference Number: The application reference number is 106161
Submitted by: The application was submitted by
ER036646/Jesse Durden
Submitted Timestamp:
Copy of Record Page 6 of 6
The application was submitted on 2015-03-16
at 11:47:35 CDT
Submitted From: The application was submitted from IP address
174.46.14.140
Confirmation Number: The confirmation number is 101752
Steers Version: The STEERS version is 5.98
Additional Information
Application Creator:This account was created by Jesse Durden