HomeMy WebLinkAboutStaff Review (ir-ff1111144 - CITY OF COLLEGE STATION Home of Texas A&M University' MEMORANDUM DATE: February 27, 2015 TO: Jesse Durden, Caprock Texas, via; jesse.durdenacaprocktx.com FROM: Mark Bombek, Staff Planner SUBJECT: SHIPLEY DO-NUTS AT CAPROCK (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. City of College Station Transmittal Letter One (1) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised landscape plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Brazos Texas Land Development, LLC, via USPS; P.O. Box 54, Wellborn TX, 77881 Deven Doyen, Schultz Engineering, LLC, via; deven@schultzengineeringllc.com Bryan Gibbs, via; bgibbs@pactdesignstudio.com P&DS Project No. 14-00900299 Planning dr Development Services P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 PLANNING COMMETNS NO. 3 1. No comments Reviewed by: Mark Bombek Date: February 25, 2015 ENGINEERING COMMENTS NO. 3 1. The B/CS guidelines does not have requirements regarding the minimum radius deflection for water lines that are 16-inch. Please check with the manufacture regarding the minimum allowable deflection radius. There's currently a vertical deflection with a radius of 386' at Station 0+71. I would assume it would require a minimum deflection radius of a 12-inch if not greater. 2. Please remove the grate inlet that is located in the rear PUE. 3. Provide sealed engineering cost estimate. Landscape 1. Please relocate the live oak trees in such a way that they are not within 20 feet of the water line. There are currently 2 live oaks that have only a 10 feet clearance with the water line. Reviewed by: Kevin Ferrer Date: February 25, 2015 cir-tr CITY OF COLLEGE STATION Home of Texas A&M University" MEMORANDUM DATE: February 3, 2015 TO: Jesse Durden, Caprock Texas, via; jesse.durdencaprocktx.com FROM: Mark Bombek, Staff Planner SUBJECT: SHIPLEY DO-NUTS AT CAPROCK (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $932 processing fee will need to be submitted for the subsequent set of three (3) reviews. City of College Station Transmittal Letter One (1) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) One (1) revised landscape plan Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Case file #14-00900299 STAFF REVIEW COMMENTS NO. 2 Project: Shipley Do-Nuts At Caprock (SP) - 14-00900299 Planning er Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 97 9.764.3496 cstx.govidevservices PLANNING 1. Repeat: The laydown curb is not permitted, and will need to comply with standard curb details of a six-inch monolithic curb. Access to the back door should be provided in a different method. FYI this change will most likely affect the landscape plan and the proposed plantings. Please make sure both plans reflect any shift in the access of the loading zone. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Mark Bombek Date: 01-28-2015 ENGINEERING COMMENTS NO. 2 1. Please provide correspondence with Wellborn SUD regarding the 16" water line crossing the proposed site plan. 2. Please provide details for the dumpster pad. There's concern with the water line. Reviewed by: Kevin Ferrer Date: 01-28-2015 (11 4' S CITY OF COLLEGE STATION , "',k+: -'4k Home of Texas AerM University MEMORANDUM CP DATE: January 6, 2015 TO: Jesse Durden, Caprock Texas, via; jesse.durdencaprocktx.com FROM: Jerry Cuaron, Staff Planner SUBJECT: SHIPLEY DO-NUTS AT CAPROCK (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) complete set of site civil construction documents for the proposed development with the revised site and landscaping plans attached; One (1) 24"x36" revised site plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jerry Cuaron at 979.764.3570. Attachments: Staff Review Comments PC: Brazos Texas Land Development, LLC, via USPS; P.O. Box 54, Wellborn TX, 77881 Deven Doyen, Schultz Engineering, LLC, via; devenP: hultzengineeringllc.com Bryan Gibbs, via; bgibbs@pactdesignstudio.com P&DS Project No. 14-00900299 Planning e'r Development Services P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STAITON •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 STAFF REVIEW COMMENTS NO. 1 Project: Shipley Do-Nuts at Caprock (SP) 14-00900299 PLANNING 1. What is the purpose of the lay down curb at the end of the nine parking space row near the building? Parking spaces are to use the standard curb detail. 2. Please show the location of the transformer and show the screening. 3. Please provide bike rack for at least four bicycles. Provide bike rack detail using the inverted U shown in the City of College Station's Site Design Standards. 4. If parking lot light poles are going to be installed, please show the location. Please note they cannot be located in a PUE. 5. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Reviewed by: Jerry CuarOn Date: January 5, 2015 ENGINEERING COMMENTS NO. 1 1. Please provide the fire flow test for existing fire hydrant. 2. Please use a curb return radii of at least 25 feet for the driveways. 3. Please fix the note regarding Spring Creek impact fee area, the entire site is included in the Spring Creek impact fee area. The Fee per LUES is $ 144.01 which is due when acquiring the building permit. Reviewed by: Kevin Ferrer Date: December 23, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. GENERAL ELECTRICAL COMMENTS 1. To discuss please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: December 16, 2014 FIRE 1) If there is not a grade issue between the main drive and the building AND the occupant load remains below 100 people. This should be fine. If the occupant load is 100 or over they will need to Fire Sprinkler the building. Reviewed by: Stephen Smith Date: January 6, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 18, 2014 (ir-of; CITY OF COLLEGE STATION Home of Texas A&M University` MEMORANDUM v DATE: December 16, 2014 TO: Jesse Durden, Caprock Texas, via; jesse.durdenacaprocktx.com FROM: Jerry Cuaron, Staff Planner SUBJECT: SHIPLEY DO-NUTS AT CAPROCK (SP) Thank you for the submittal of your Site Plan - Commercial application. Kevin Ferrer, Graduate Engineer I, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, January 5, 2015. If you have questions in the meantime, please feel free to contact us. PC: Brazos Texas Land Development, LLC, via USPS; P.O. Box 54, Wellborn TX, 77881\Y Deven Doyen, Schultz Engineering, LLC, via; deven •G'► chultzen•ineerin•Ilc.com Bryan Gibbs, via; b•ibbs • •actdesi•nstudio.com P&DS Project No. 14-00900299 Planning er Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 STAFF REVIEW COMMENTS NO. 3 Project: Shipley Do-Nuts At Caprock (SP) - 14-00900299 PLANNING COMMETNS NO. 3 1. No comments Noted. Reviewed by: Mark Bombek Date: February 25, 2015 ENGINEERING COMMENTS NO. 3 1. The B/CS guidelines does not have requirements regarding the minimum radius deflection for water lines that are 16-inch. Please check with the manufacture regarding the minimum allowable deflection radius. There's currently a vertical deflection with a radius of 386' at Station 0+71. I would assume it would require a minimum deflection radius of a 12-inch if not greater. The vertical deflection with a radius of 386'has been revised. 2. Please remove the grate inlet that is located in the rear PUE. The grate inlet has been relocated outside the PUE. 3. Provide sealed engineering cost estimate. An engineer's estimate is attached. Landscape 1. Please relocate the live oak trees in such a way that they are not within 20 feet of the water line. There are currently 2 live oaks that have only a 10 feet clearance with the water line. Live Oak trees have been relocated in such a way that they are not within 20 feet of the water line. Reviewed by: Kevin Ferrer Date: February 25, 2015 FOR OFFICE U E •NL CASE NO.: ��/,� DATE SU:M TTED• TIME: / CITY OF COLLEGE STATION STAFF: Home of Texas AeiM University° PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Incomplete Project Submittal-documents needed to complete an application. Case No.: ❑x Existing Project Submittal. Case No.: 14-00900299 Project Name Shipley Do-Nuts at Caprock(SP) Contact Name Jesse Durden Phone Number 979.307.0321 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards ] Rezoning Application ] Irrigation Plan Conditional Use Permit ❑ Variance Request ] Preliminary Plan ❑ Development Permit ❑ Final Plat ❑ Development Exaction Appeal ❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR U Site Plan ❑ Grading Plan ❑ Special District Site Plan x❑ Other- Please specify below Special District Building/Sign Response to Comments Landscape Plan 8-Sets of Construction Drawings INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Comprehensive Plan Amendment ❑ Waterline Construction Documents ❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents ❑ TxDOT Utility Permit ❑ Street Construction Documents ❑ Drainage Letter or Report ❑ Easement Application ❑ Fire Flow Analysis -"A Other- Please specify E►JGTOEElei lfsr> 4TE Special Instructions: 10/10 4nforr1 ".'; STAFF REVIEW COMMENTS NO. 1 Project: Shipley Do-Nuts at Caprock (SP) 14-00900299 PLANNING X00=0 1. What is the purpose of the lay down curb at the end of the nine parking space row near the building? Parking spaces are to use the standard curb detail. The lay down curb is for access to the back door of the building for deliveries. - 2. Please show the location of the transformer and show the screening. Transformer location has been added to the Site Plan. - 3. Please provide bike rack for at least four bicycles. Provide bike rack detail using the inverted U shown in the City of College Station's Site Design Standards. A bike rack and bike rack detail have been added to the plans. 4. If parking lot light poles are going to be installed, please show the location. Please note they cannot be located in a PUE. Parking lot light poles have been added to the Site Plan. -- 5. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. One parking space has been removed near the northern driveway entrance to accommodate the proposed BTU transformer. Reviewed by: Jerry Cuaron Date: January 5, 2015 ENGINEERING COMMENTS NO. 1 1. Please provide the fire flow test for existing fire hydrant. A fire flow test is attached. 2. Please use a curb return radii of at least 25 feet for the driveways. The driveways are private and connect to a public driveway, not a public way or street. The radii shown are the largest radii that will fit. 3. Please fix the note regarding Spring Creek impact fee area, the entire site is included in the Spring Creek impact fee area. The Fee per LUEs is $ 144.01 which is due when acquiring the building permit. Note 13 has been revised. Reviewed by: Kevin Ferrer Date: December 23, 2014 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. This project location is outside of CSU certification area. CSU will not provide electric service to this project location. Noted. GENERAL ELECTRICAL COMMENTS 1. To discuss please contact Sam Weido at 979.764.6314. Noted. Reviewed by: Sam Weido Date: December 16, 2014 FIRE 1. If there is not a grade issue between the main drive and the building AND the occupant load remains below 100 people. This should be fine. If the occupant load is 100 or over they will need to Fire Sprinkler the building. The building is type A-2 occupancy with an occupancy load of 82 people. No Fire Sprinkler will be provided. Reviewed by: Stephen Smith Date: January 6, 2015 SANITATION 1. Sanitation is ok with this project. Noted. Reviewed by: Wally Urrutia Date: December 18, 2014