HomeMy WebLinkAboutStaff Review r • or, (kr- CITY OF COI J.FGE STATION Home of Texas AIM University° MEMORANDUM DATE: February 10, 2015 TO: Daniel Beamon, via; danielb(a iohnsonpace.com FROM: Jason Schubert, Principal Planner SUBJECT: BLUESTONE CONDOMINIUMS (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached; One (1) 24"x36" revised site plan; One (1) 24"x36" revised landscaping plan; $57,260 in Parkland Dedication fees (based on current 35 unit count x $1,636) prior to issuance of a building permit; and Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jason Schubert at 979.764.3570. Attachments: Staff Review Comments PC: Caleb Venable, via; calebvenableCa�gmail.com P&DS Project No. 14-00900294 Planning 6 Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570•FAX. 979.764.3496 STAFF REVIEW COMMENTS NO. 1 Project: Bluestone Condominiums (SP) 14-00900294 PLANNING 1. Please note that the final plat for this property will need to be filed at the Courthouse before the site plan can be approved. 2. The site plan proposes to construct two buildings where an existing PUE is located. In order to approve the site plan as currently configured, the PUE must be abandoned by City Council before the site plan can be approved. Abandonment is in process 3. Illustrate all existing and proposed utility and access easements on the site plan. If an easement is existing, label the volume and page of the easement. Complied 4. As site plans on private property are approved by staff, remove the approvals reference of Council members and city management on the covers the construction documents. Complied 5. Illustrate the building setbacks on the site plan. These are a 15-foot front setback from the southeastern property line (common line with the Brentwood subdivision), 20-foot rear setback from the northwestern property line (common line with the KFO Addition Lot 3, Block 1), and 7.5-foot side setbacks for the remaining property lines. Complied 6. The building closest to the southeast corner of Kirkpatrick Lot 1 B, Block 1 is shown to be 3.52 feet from the property line, within the 7.5-foot side setback. Please revise. Complied 7. Provide a vicinity map on the site plan, sheet C4.0. Complied 8. The parking spaces along the southeastern boundary of the site are reduced to 18 feet in depth but do not have a minimum 4-foot landscape area located within the property. Complied 9. The perimeter of paved areas are to have a 6-inch raised curb. Revise so that all paved area not directly adjacent to a building, including dumpster enclosure areas, have a curb. A laydown curb with a 5" (0.42') profile can be used in other area within the City. The low point in the surrounding pavement is at least 0.4'below any adjacent FFE. 10. Provide the standard curb detail from the City's Site Design Standards on the site plan. Complied 11. Provide the calculation of the amount of required parking on the site plan. Complied 12. Identify the location of all proposed parking spaces on the site plan. If spaces are provided within a garage, label the garage area and number of spaces on the site plan. In multi-family parking, spaces cannot be stacked two deep and count as parking. Spaces not inside of a garage are to be striped and meet the minimum dimensional requirements. Complied 13. Island areas at the end of each parking row are to be raised with a 6-inch curb and be at least 180 square feet in area. The island in the northwest corner of the site beside the dumpster enclosure does not meet this minimum. Complied 14. Dumpster enclosure areas are to provide at least a 12-foot deep and 24-foot wide clear area (inside bollards and gates) when two 8-yard dumpsters are located next to each other. It does not appear this clear space is provided in the proposed enclosure areas. Complied 15. Dumpsters are to be screened. Provide the dumpster enclosure details or description on the site plan. Complied 16. Identify the thickness of the different pavement types on the site plan legend. Complied 17. Provide the height of the building eaves on the site plan. Complied 18. Provide the fire lane striping detail as per the City's Site Design Standards on the site plan. The option to provide Firelane signage was used according to page 12 of the City of College Station Site Design Standards. 19. Show the electric transformers locations on the site plan. Complied 20. Provide a general note on the site plan that states the following: Exterior building arid site lighting will meet the standards of Section 12-7.11 Outdoor Lighting Standards of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. Complied 21. Please note that parkland fees of $1,636 for each multi-family unit will be due prior to the issuance of building permit. The total fees due for this project are $57,260 (35 proposed units x $1,636). 22. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Reviewed by: Jason Schubert Date: January 24, 2015 LANDSCAPING 1. To help identify potential conflicts, illustrate existing and proposed utilities and infrastructure, retaining walls, drainage features, and easements on the landscape plan. 2. Provide a vicinity map on the landscape plan. 3. On the landscape plan, identify the species of the existing trees that are barricaded to remain. Please note that the species must be on the College Station Plant List as provided in the City's Site Design Standards in order to qualify for point credit. 4. The Site Demolition Plan (sheet C3.0) states to remove all trees in the shaded area (the entire site) which conflicts with the landscape plan's proposal to retain three existing trees. Please reconcile. 5. It appears the existing tree to be retained adjacent to Autumn Chase Lot 6, Block 3 is located where a proposed sewer line will be extended. 6. Provide the barricade detail to be used from the City's Site Design on the landscape plan. 7. In the Tree Size Requirements section, revise the For Non-Canopy Trees to include the minimum size is 1-1/4" for a single cane of a multi-trunk non-canopy tree. 8. Revise the references to the size of the shrubs required to be a minimum of 5 gallon or 1 gallon, instead of less than those amounts. To receive 10 point credit, a shrub is a minimum 5 gallon and to receive 1 point a shrub is a minimum 1 gallon. 9. Revise the Total Landscape Points Accrued calculation to state there are 2,975 points for trees + 440 points for shrubs to equal the total of 3,415. 10. The landscape plan illustrates more than 110 1-gallon shrubs. Please reconcile. 11. Revise the paving shown on the landscape plan to be consistent with the site plan. The landscape plan shows paving going toward Texas Avenue in the private access easement that is not proposed on the site plan. 12. Provide a note on the landscape plan that the irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double- Check Back Flow Device, and all BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Jason Schubert Date: January 24, 2015 ENGINEERING COMMENTS NO. 1 1. FYI...Plan sets should do be divided into Public Infrastructure and Grading & Drainage. We can, however, separate and approve the sheet(s) for the removal of the sanitary sewer line in order to get that work complete and proceed with the PUE abandonment. 2. It looks like the old version of the final plat was included in this plan set. Please update. elluN 3. Please submit an NOI and Letter of Acknowledgement. Letter will be provided upon approval of the site plan 4. C2.1/2.2 - The specified IP1 & IP2 inlet protection specified do not look like they can be applied to grate inlets. Please provide grate inlet protection detail. IP1 and IP2 provided inlet protection in two stages. IP1 is used prior to the construction of the tops and pavement. IP2 is used after tops are installed and pavement is in place. 5. C2.1 - The stabilized construction entrance is supposed to be installed first, but it is located over the detention pond. Where will the temporary stabilized entrance be located? Detention has been shifted. 6. C4.0 - Please show and label all existing and proposed utility lines on the site plan. Complied 7. C4.0 - Add a note regarding the property's location in relation to the FEMA floodplain (including panel number and effective date). Complied 8. C4.0 - Provide table on site plan with building sizes, material type, whether or not it is sprinkled, and the fire flow requirement per the International Fire Code. Complied 9. C4.0 - Add a table with the minimum, average, and maximum domestic water and sanitary sewer demands. Complied 10. C4.0 - Please add a note reminding the contractor that he needs to coordinate with the adjacent property owners prior to beginning off-site construction. Complied 11. C4.0/5.0 - Retaining walls and other private infrastructure (such as storm sewer and detention ponds) are not permitted in PUEs. Please relocate. Complied 12. C5.0 - Provide additional spot elevations on adjacent surrounding properties. Existing Contours are provided on adjacent properties and spot elevations are provided at critical connection points. 13. C5.0 - Shouldn't there be a swale and/or grate inlet between the hotel and the adjacent row of condos? It doesn't appear that the grate inlets in Comfort Suites' parking lot were designed to carry the amount of post-development run-off proposed. The grates are sufficient to carry the area shown which matches the area shown in the drainage report for the adjacent Hotel. 14. C5.0 - It is preferable that curb breaks be a maximum of 12-inches wide. Curb breaks need to be 24"wide. 15. C4.0/8.0- Show and label fire lines, isolation valves, and FDCs. Complied 16. C4.0/8.0 - Please add note on the plans that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. A separate fire suppression line is not being provided. 17. C8.0 - Please add domestic services near fire hydrant leads in order to keep circulation in the dead-end lines. Complied 18. FYI...The abandonment will need to be processed prior to site plan approval or the site plan will need to be phased such that there are no easement encroachments. 19. FYI...An easement dedication application will need to be submitted prior to site plan approval. All required easements must be filed prior to issuance of the Letter of Completion or Certificate of Occupancy. 20. C8.0 - Since the sanitary sewer line is only serving this development, the internal lines should all be private and located outside of PUEs. Please consider making the middle sanitary sewer line public. 21. C8.0 - Please verify that all public waterlines are at least 20-ft from any building. Per discussion with Stephen Maldonado, lines may be as close as 15' although 20' is preferred. All lines are at least 15'from all buildings. 22. C8.0 — The fire hydrant on the far south side of the property needs to be located along the fire lane 3-ft from the back of curb. Complied 23. C8.0 — Is the centrally located fire hydrant proposed to be used for fire coverage? If so, it needs to be moved adjacent to a fire lane. Fire hydrant locations have been revised. 24. C8.5 — Provide two gate valves at each tee. Complied 25. C8.5 — TCEQ standards must be met at water & sanitary sewer crossings. Please add a note and label the crossings with specific requirements. Complied 26. C8.6/8.7 — Please specify two 45-degree bends in place of a 90-degree bend. Complied 27. C7.0 — Provide additional details, flowlines, and cross-sections for the detention ponds and concrete flume. The flume needs a longitudinal detail with flowlines and cut-outs labeled. The Grading Plan and Storm Sewer Plan is sufficient to convey the appropriate construction detail. 28. C7.0 — If the grate inlet in the southeastern corner of the property gets clogged, how will the surrounding properties be effected? Should a swale be cut to direct flow toward the detention pond? Should a different type of inlet grate (i.e. beehive/honeycomb) be utilized to minimize the chances of blockage? The grate inlet has been revised to an area inlet. 29. C7.0 — How will the ponds be accessed for cleaning/maintenance? Underground Ponds will have positive drainage at all points and will function like a normal storm sewer system. There should be no additional need to clean or maintain underground detention other than the access points at drainage structures. 30. Drainage Report — Please provide our standard drainage certification in the report. Complied 31. Drainage Report— Provide ponding analysis for the parking lot. FYI...A maximum of 0.5-ft is permitted. A ponding analysis is not necessary. The water surface elevation for 100 year will be below the top of pavement. 32. Drainage Report — Include the 18-inch pipe to Copy Corner in the "Storm Sewer Summary" table and on C6.1. Complied 33. Drainage Report — Please provide a table summarizes the off-site drainage that was accounted for by adjacent sites versus the proposed run-off from this development.\ Complied 34. Drainage Report — How is the 18-inch pipe proposed to tie into the existing pipe on Copy Corner's site? The existing pipe was supposed to receive additional upstream drainage, so how will that be accommodated with the proposed connection? An area inlet is being provided to catch surface runoff from the adjacent property. 35. Drainage Report— Comfort Suites' Inlet #2 was designed to accommodate a small portion of pre-development area ("natural grasslands" condition). The post-development, undei:ained run-off proposed to flow to this area looks like it exceeds what it was designed to handle. The grates are sufficient to carry the area shown which matches the area shown in the drainage report for the adjacent Hotel. 36. Drainage Report — Which storm event is being analyzed in the "grate inlet calculations" table? 25 year event. Tabled has been labeled 37 Drainage Report—The hydrograph labeling is a bit confusing. Can the red, blue, and green lines be relabeled with what they actually represent rather than numbers? I have labeled to hydrographs in more detail for clarity. 38. Drainage Report — Please provide an analysis for the concrete flumes and curb breaks. Complied 39. Fire Flow— Include a copy of the actual fire flow test. Complied 40. Fire Flow — The report needs to include fire flow calculations per the IFC based on building size, material type, and whether or not it is sprinkled. Complied 41. Cost Estimate — Only public infrastructure and items needed to install the infrastructure (i.e. mobilization) should be included in the estimate. Also, it needs to be signed & sealed by the design engineer. 42. FYI...Additional Development Permit Fee in the amount of 1% of the total public infrastructure cost will be required. Reviewed by: Erika Bridges Date: February 9, 2015 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: qmartinezcstx.gov , sweido(a�cstx.gov , or wdavis(c�cstx.00v 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: January 12, 2015 FIRE 1. Condominiums are built and sold as single family dwelling units. Therefore, Section "D" 107 (IFC 2012) One or Two Family Residential Developments— "D107.1 Developments of one or two family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads...". If all of these units have fire sprinklers they do not have to meet this rule. 2. Provide the eave height of the buildings. Aerial access fire lane having a 26-foot width are required on structures for buildings with eaves 30 feet or more in height. Complied 3. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. 4. A site plan shall not show any part of a structure over 150 feet from an approved access road. 5. If a fire lane extends more than 100 feet, an approved turn-a-round or"T" will be required. 6. No more than a 6% grade is allowed on any length of fire lanes. Complied 7. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of 4-inch letters. 8. A "Knox Box" security key system is required on all buildings and a Knox Switch is required on all gated entrances. 9. If using fire sprinklers, F.D.C. locations will be within 150 feet of a fire hydrant and located on the "road side" of a structure. Reviewed by: Steve Smith Date: January 26, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 15, 2015 (414r CITY OF COLLEGE STATION— Home of Texas A&M University` MEMORANDUM DATE: February 10, 2015 TO: Daniel Beamon, via; danielb(a�johnsonpace.com/ FROM: Jason Schubert, Principal Planner SUBJECT: BLUESTONE CONDOMINIUMS (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Two (2) complete sets of site civil construction documents for the proposed development with the revised site and landscaping plans attached; One (1) 24"x36" revised site plan; One (1) 24"x36" revised landscaping plan; $57,260 in Parkland Dedication fees (based on current 35 unit count x $1,636) prior to issuance of a building permit; and Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If the-e are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jason Schubert at 979.764.3570. Attachments: Staff Review Comments PC: Caleb Venable, via; calebvenable(u�gmail.com P&DS Project No. 14-00900294 Planning e'Development Services P.O.BOX 9960 • 1 101 TEXAS AVENUE •COLLEGE STATION •TExkA5 •77842 'J EI.. 979.764.3570 • FAX. 979.764.3496 cs tx.gov/d ev s e rvi ce s STAFF REVIEW COMMENTS NO. 1 Project: Bluestone Condominiums (SP) 14-00900294 PLANNING 1. Please note that the final plat for this property will need to be filed at the Courthouse before the site plan can be approved. 2. The site plan proposes to construct two buildings where an existing PUE is located. In order to approve the site plan as currently configured, the PUE must be abandoned by City Council before the site plan can be approved. 3. Illustrate all existing and proposed utility and access easements on the site plan. If an easement is existing, label the volume and page of the easement. 4. As site plans on private property are approved by staff, remove the approvals reference of Council members and city management on the covers the construction documents. 5. Illustrate the building setbacks on the site plan. These are a 15-foot front setback from the southeastern property line (common line with the Brentwood subdivision), 20-foot rear setback from the northwestern property line (common line with the KFO Addition Lot 3, Block 1), and 7.5-foot side setbacks for the remaining property lines. 6. The building closest to the southeast corner of Kirkpatrick Lot 1 B, Block 1 is shown to be 3.52 feet from the property line, within the 7.5-foot side setback. Please revise. 7. Provide a vicinity map on the site plan, sheet C4.0. 8. The parking spaces along the southeastern boundary of the site are reduced to 18 feet in depth but do not have a minimum 4-foot landscape area located within the property. 9. The perimeter of paved areas are to have a 6-inch raised curb. Revise so that all paved area not directly adjacent to a building, including dumpster enclosure areas, have a curb. 10. Provide the standard curb detail from the City's Site Design Standards on the site plan. 11. Provide the calculation of the amount of required parking on the site plan. 12. Identify the location of all proposed parking spaces on the site plan. If spaces are provided within a garage, label the garage area and number of spaces on the site plan. In multi-family parking, spaces cannot be stacked two deep and count as parking. Spaces not inside of a garage are to be striped and meet the minimum dimensional requirements. 13. Island areas at the end of each parking row are to be raised with a 6-inch curb and be at least 180 square feet in area. The island in the northwest corner of the site beside the dumpster enclosure does not meet this minimum. 14. Dumpster enclosure areas are to provide at least a 12-foot deep and 24-foot wide clear area (inside bollards and gates) when two 8-yard dumpsters are located next to each other. It does not appear this clear space is provided in the proposed enclosure areas. 15. Dumpsters are to be screened. Provide the dumpster enclosure details or description on the site plan. 16. Identify the thickness of the different pavement types on the site plan legend. 17. Provide the height of the building eaves on the site plan. 18. Provide the fire lane striping detail as per the City's Site Design Standards on the site plan. 19. Show the electric transformers locations on the site plan. 20. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 12-7.11 Outdoor Lighting Standards of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 21. Please note that parkland fees of $1,636 for each multi-family unit will be due prior to the issuance of building permit. The total fees due for this project are $57,260 (35 proposed units x $1,636). 22. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Reviewed by: Jason Schubert Date: January 24, 2015 LANDSCAPING 1. To help identify potential conflicts, illustrate existing and proposed utilities and infrastructure, retaining walls, drainage features, and easements on the landscape plan. 2. Provide a vicinity map on the landscape plan. 3. On the landscape plan, identify the species of the existing trees that are barricaded to remain. Please note that the species must be on the College Station Plant List as provided in the City's Site Design Standards in order to qualify for point credit. 4. The Site Demolition Plan (sheet C3.0) states to remove all trees in the shaded area (the entire site) which conflicts with the landscape plan's proposal to retain three existing trees. Please reconcile. 5. It appears the existing tree to be retained adjacent to Autumn Chase Lot 6, Block 3 is located where a proposed sewer line will be extended. 6. Provide the barricade detail to be used from the City's Site Design on the landscape plan. 7. In the Tree Size Requirements section, revise the For Non-Canopy Trees to include the minimum size is 1-1/4" for a single cane of a multi-trunk non-canopy tree. 8. Revise the references to the size of the shrubs required to be a minimum of 5 gallon or 1 gallon, instead of less than those amounts. To receive 10 point credit, a shrub is a minimum 5 gallon and to receive 1 point a shrub is a minimum 1 gallon. 9. Revise the Total Landscape Points Accrued calculation to state there are 2,975 points for trees + 440 points for shrubs to equal the total of 3,415. 10. The landscape plan illustrates more than 110 1-gallon shrubs. Please reconcile. 11. Revise the paving shown on the landscape plan to be consistent with the site plan. The landscape plan shows paving going toward Texas Avenue in the private access easement that is not proposed on the site plan. 12. Provide a note on the landscape plan that the irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double- Check Back Flow Device, and all BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Jason Schubert Date: January 24, 2015 ENGINEERING COMMENTS NO. 1 1. FYI...Plan sets should do be divided into Public Infrastructure and Grading & Drainage. We can, however, separate and approve the sheet(s) for the removal of the sanitary sewer line in order to get that work complete and proceed with the PUE abandonment. 2. It looks like the old version of the final plat was included in this plan set. Please update. 3. Please submit an NOI and Letter of Acknowledgement. 4. C2.1/2.2 — The specified IP1 & IP2 inlet protection specified do not look like they can be applied to grate inlets. Please provide grate inlet protection detail. 5. C2.1 — The stabilized construction entrance is supposed to be installed first, but it is located over the detention pond. Where will the temporary stabilized entrance be located? 6. C4.0 — Please show and label all existing and proposed utility lines on the site plan. 7. C4.0 - Add a note regarding the property's location in relation to the FEMA floodplain (including panel number and effective date). 8. C4.0 - Provide table on site plan with building sizes, material type, whether or not it is sprinkled, and the fire flow requirement per the International Fire Code. 9. C4.0 - Add a table with the minimum, average, and maximum domestic water and sanitary sewer demands. 10. C4.0 - Please add a note reminding the contractor that he needs to coordinate with the adjacent property owners prior to beginning off-site construction. 11. C4.0/5.0 - Retaining walls and other private infrastructure (such as storm sewer and detention ponds) are not permitted in PUEs. Please relocate. 12. C5.0 - Provide additional spot elevations on adjacent surrounding properties. 13. C5.0 - Shouldn't there be a swale and/or grate inlet between the hotel and the adjacent row of condos? It doesn't appear that the grate inlets in Comfort Suites' parking lot were designed to carry the amount of post-development run-off proposed. 14. C5.0 - It is preferable that curb breaks be a maximum of 12-inches wide. 15. C4.0/8.0 - Show and label fire lines, isolation valves, and FDCs. 16. 04.0/8.0 - Please add note on the plans that the fire suppression line shall have a lockable lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by College Station Utilities Director or his designee. 17. C8.0 - Please add domestic services near fire hydrant leads in order to keep circulation in the dead-end lines. 18. FYI...The abandonment will need to be processed prior to site plan approval or the site plan will need to be phased such that there are no easement encroachments. 19. FYI...An easement dedication application will need to be submitted prior to site plan approval. All required easements must be filed prior to issuance of the Letter of Completion or Certificate of Occupancy. 20. C8.0 - Since the sanitary sewer line is only serving this development, the internal lines should all be private and located outside of PUEs. 21. C8.0 - Please verify that all public waterlines are at least 20-ft from any building. 22. C8.0 - The fire hydrant on the far south side of the property needs to be located along the fire lane 3-ft from the back of curb. 23. C8.0 - Is the centrally located fire hydrant proposed to be used for fire coverage? If so, it needs to be moved adjacent to a fire lane. 24. C8.5 - Provide two gate valves at each tee. 25. C8.5 - TCEQ standards must be met at water & sanitary sewer crossings. Please add a note and label the crossings with specific requirements. 26. C8.6/8.7 - Please specify two 45-degree bends in place of a 90-degree bend. 27. C7.0 - Provide additional details, flowlines, and cross-sections for the detention ponds and concrete flume. The flume needs a longitudinal detail with flowlines and cut-outs labeled. 28. 07.0 - If the grate inlet in the southeastern corner of the property gets clogged, how will the surrounding properties be effected? Should a swale be cut to direct flow toward the detention pond? Should a different type of inlet grate (i.e. beehive/honeycomb) be utilized to minimize the chances of blockage? 29. C7.0 - How will the ponds be accessed for cleaning/maintenance? 30. Drainage Report - Please provide our standard drainage certification in the report. 31. Drainage Report - Provide ponding analysis for the parking lot. FYI...A maximum of 0.5-ft is permitted. 32. Drainage Report - Include the 18-inch pipe to Copy Corner in the "Storm Sewer Summary" table and on C6.1. 33. Drainage Report — Please provide a table summarizes the off-site drainage that was accounted for by adjacent sites versus the proposed run-off from this development.\ 34. Drainage Report — How is the 18-inch pipe proposed to tie into the existing pipe on Copy Corner's site? The existing pipe was supposed to receive additional upstream drainage, so how will that be accommodated with the proposed connection? 35. Drainage Report — Comfort Suites' Inlet#2 was designed to accommodate a small portion of pre-development area ("natural grasslands" condition). The post-development, undetained run-off proposed to flow to this area looks like it exceeds what it was designed to handle. 36. Drainage Report — Which storm event is being analyzed in the "grate inlet calculations" table? 37. Drainage Report —The hydrograph labeling is a bit confusing. Can the red, blue, and green lines be relabeled with what they actually represent rather than numbers? 38. Drainage Report— Please provide an analysis for the concrete flumes and curb breaks 39. Fire Flow— Include a copy of the actual fire flow test. 40. Fire Flow — The report needs to include fire flow calculations per the IFC based on building size, material type, and whether or not it is sprinkled. 41. Cost Estimate — Only public infrastructure and items needed to install the infrastructure (i.e. mobilization) should be included in the estimate. Also, it needs to be signed & sealed by the design engineer. 42. FYI...Additional Development Permit Fee in the amount of 1% of the total public infrastructure cost will be required. Reviewed by: Erika Bridges Date: February 9, 2015 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(a�cstx.gov , sweidoCa)cstx.gov , or wdavis(cr�cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weida at 979.764.6314, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: January 12, 2015 FIRE 1. Condominiums are built and sold as single family dwelling units. Therefore, Section "D" 107 (IFC 2012) One or Two Family Residential Developments — "D107.1 Developments of one or two family dwellings where the number of dwelling units exceeds 30 shall be provided with two separate and approved fire apparatus access roads...". If all of these units have fire sprinklers they do not have to meet this rule. 2. Provide the eave height of the buildings. Aerial access fire lane having a 26-foot width are required on structures for buildings with eaves 30 feet or more in height. 3. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. 4. A site plan shall not show any part of a structure over 150 feet from an approved access road. 5. If a fire lane extends more than 100 feet, an approved turn-a-round or "T" will be required. 6. No more than a 6% grade is allowed on any length of fire lanes. 7. Fire lanes will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of 4-inch letters. 8. A "Knox Box" security key system is required on all buildings and a Knox Switch is required on all gated entrances. 9. If using fire sprinklers, F.D.C. locations will be within 150 feet of a fire hydrant and located on the "road side" of a structure. Reviewed by: Steve Smith Date: January 26, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 15, 2015 CITY OF COLLEGE STATION Home of Texas A&M University° MEMORANDUM DATE: January 12, 2015 TO: Daniel Beamon, via; danielbjohnsonpace.com FROM: Jason Schubert, AICP Principal Planner SUBJECT: BLUESTONE CONDOMINIUMS (DP) Thank you for the submittal of your Site Plan - Residential application to accompany the Development Permit application previously submitted. Erika Bridges, Graduate Engineer II, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Tuesday, January 27, 2015. If you have questions in the meantime, please feel free to contact us. PC: Caleb Venable, via; calebvenable@gmail.com V, P&DS Project No. 14-00900294 Planning 6.Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570•FAX. 979.764.3496 CITY OF COLLEGE STATION Home of Texas AdM University` MEMORANDUM DATE: December 10, 2014 TO: Daniel Beamon, via; danielb ac johnsonpace.com FROM: Jason Schubert, AICP, Principal Planner SUBJECT: BLUESTONE CONDOMINIUMS (DP) I received the above-mentioned Development Permit application and determined it to be incomplete. The following is the preliminary list of items needed to complete the submittal. Please submit the following information so this application can be forwarded for review: Submit a Site Plan application with associated documents and fee. Four sets of civil construction documents were submitted for the site plan of this project. The Site Plan application has the Development Permit component imbedded within it. As stated on the Site Plan application, documents to include with it are separate copies of the site plan, landscape plan, and supporting documents to the infrastructure plans, including fire flow/water report, sanitary sewer report, and drainage report. As this is a multi-family project, the Non-Residential Architectural Standards fee and items are not applicable. Please be aware that if this application is not completed before Monday, January 26, 2015, it will expire and a new application and fees will be necessary to continue the development process. If you have any questions or need additional information, please call me at 979.764.3570. PC: Caleb Venable, via; calebvenable(a7gmail.com P&DS Project No. 14-00900294 Planning er Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 cstx.Pov/dPvsBrviCPc Jason Schubert From: Jason Schubert Sent: Monday, June 29, 2015 5:48 PM To: 'Daniel Beamon' Cc: Caleb Venable; Erika Bridges Subject: Bluestone Condos comments Daniel, I just changed the project status to Awaiting Revision so you should have just received an auto-email notification that comments are available in eTRAKiT. I have also attached the comments here for both yours and Caleb's reference: Planning:Jason Schubert(6/26/15) Provide a written response to the review comments and a revised site plan, revised landscape plan, and set of civil construction documents for further staff review. Site Plan 1. In addition to the total unit count provided, identify the number of each type of unit (1 bedroom, 2 bedroom, etc) included in each building. 2. Revise the parking calculations to show how the minimum parking requirement is achieved.This would include subtotals of the number of each type of unit (#of 1 bedroom units, 2 bedroom units, etc.) and if 2 bedroom units are provided if those bedrooms are greater or less than 130 square feet each as that affects the parking requirement. 3. The site plan states there are 64 garage parking spaces. With 37 units, it is not clear which units have garages and if they do how many spaces they contain. Depict the general location and size of the garages on the site plan so the parking count can be verified and also later confirmed when building permits are sought. 4. Revise the parking counts provided. The parking row next to the KFO Addition lot is labeled to have 11 spaces but has 9. Also, 27 off-street (or non-garage) spaces are listed though the count appears to be 29 spaces. 5. The drive aisle leading up to and around the 3 space parking row by Building IV needs to be curbed with the standard 6- inch curb. If the drive aisle is anticipated to be extended in the future, a temporary curb may be used in that location. If so, use and show the detail for a temporary curb as provided in the Site Design Standards. 6. The option to utilize fire lane signage also requires that where curbs exist along a fire lane that those curbs are painted with the standard fire lane striping and text. Indicate on the site plan where fire lane striping will be provided. 7. The finish of the exposed concrete retaining wall will need to be determined.The ordinance does not allow more than 6- inches of untreated concrete. Provide a detail regarding the proposed treatment to be provided. 8. Provide a detail for the dumpster enclosure and gates. Please note that according to the Site Design Standards, a positive locking mechanism, so the gates can remain open during servicing, needs to be specified. 9. Is the construction going to be phased such that some buildings are occupied before other buildings are constructed or completed? If so,the site plan would need to show the phase lines such that adequate parking and fire and sanitation access is provided with each phase. 10. Please note that as 37 units are now proposed, instead of the previous 35 units, a total of$60,532 in parkland dedication fees ($1,636 per unit)will be due with at the issuance of building permits. Landscape Plan 1. The trunk of a canopy tree is to be planted at least 10 feet away from a public water main or public sanitary sewer main. A number are located within this distance, please revise. 2. If no existing vegetation is proposed to remain, delete Notes#2. 3. If the site is phased, the landscape plan would also need to be phased with calculations such that each phase independently meets minimum requirements. Engineering: Erika Bridges (6/24/15) 1. (Please submit an NOI and Letter of Acknowledgement.) Please submit these items. 1 2. (C2.1/2.2—The specified IP1 & '"' inlet protection specified do not look like "ley can be applied to grate inlets. Please provide grate inlet protection ck_ail.) How will the filter sock work on grate . .;ets? The detail doesn't show how it should be installed on grate inlets. 3. (C4.0—Provide table on site plan with building sizes, material type, whether or not it is sprinkled, and the fire flow requirement per the International Fire Code.) Please specify Type VB as the material type. 4. (C4.0/5.0—Retaining walls and other private infrastructure (such as storm sewer and detention ponds) are not permitted in PUEs. Please relocate.) The private sanitary sewer along the north side of the property needs to be removed from the PUE. 5. (C5.0—Provide additional spot elevations on adjacent surrounding properties.) There wasn't much grading/topo information provided on the Comfort Suites site, and that is of particular interest since a large portion of the site runoff goes that direction. 6. (C5.0—It is preferable that curb breaks be a maximum of 12-inches wide.) Please provide additional clarification. The drainage report short also provide a weir analysis. 7. (C4.0/8.0—Show and label fire lines, isolation valves, and FDCs.) The fire lanes still did not appear to be labeled. 8. (FYI...An easement dedication application will need to be submitted prior to site plan approval. All required easements must be filed prior to issuance of the Letter of Completion or Certificate of Occupancy.) Please submit the easement dedication application. FYI...PUEs must be a minimum 15-ft wide. 9. (C8.0—Since the sanitary sewer line is only serving this development,the internal lines should all be private and located outside of PUEs.) Per the water department, the main line at the center of the property may be public. Please submit a plan and profile drawing for this line. Additionally, the abandonment application should be revised to remove a portion of the PUE along the northern property line as we previously discussed. 10. (C8.0—Please verify that all public waterlines are at least 20-ft from any building.) There are still water and sanitary sewer that need to be shifted to be at least 15-ft from the buildings. 11. (C8.5—TCEQ standards must be met at water& sanitary sewer crossings. Please add a note and label the crossings with specific requirements.) Please also specify the required bedding, a joint of water pipe centered at the crossing, and label the separation distance. 12. (C8.6/8.7—Please specify two 45-degree bends in place of a 90-degree bend.) The bend by Building 6 needs to be revised. 13. C8.5-8.7—On the profile drawings, please label all valves, the radius of curvature at each pipe deflection, and water meters (including meter sizes). 14. (C7.0—Provide additional details, flowlines, and cross-sections for the detention ponds and concrete flume. The flume needs a longitudinal detail with flowlines and cut-outs labeled.) These items were still not provided, but it doesn't appear that there is sufficient detail. 15. (Drainage Report—Please provide our standard drainage certification in the report.) The standard certification language can be found in Section III.C.1. of the BCS Stormwater Design Guidelines. 16. (Drainage Report—Provide ponding analysis for the parking lot. FYI...A maximum of 0.5-ft is permitted.) Will there not be any ponding at the grate inlets during larger storm events? 17. (Drainage Report—Comfort Suites' Inlet#2 was designed to accommodate a small portion of pre-development area ("natural grasslands" condition). The post-development, undetained run-off proposed to flow to this area looks like it exceeds what it was designed to handle.) Please provide further clarification. 18. (Drainage Report—Please provide an analysis for the concrete flumes and curb breaks.) Provide analysis for the curb breaks. 19. (Fire Flow—The report needs to include fire flow calculations per the IFC based on building size, material type, and whether or not it is sprinkled.) Specify the Type VB material type. Also,the report mentions 2700 gpm max volume while the fire flow requirement table references 2750 gpm. 20. (Cost Estimate—Only public infrastructure and items needed to install the infrastructure (i.e. mobilization) should be included in the estimate. Also, it needs to be signed &sealed by the design engineer.) Please submit a revised cost estimate. 21. (FYI...Additional Development Permit Fee in the amount of 1%of the total public infrastructure cost will be required.) If additional DP fee is required, it will be assessed based on the revised cost estimate. Thanks, Jason