DATE: February 24, 2015
TO: Veronica Morgan, Mitchell and Morgan, via; v(cmitchellandmorgan.com
FROM: Jessica Bullock, Staff Planner
SUBJECT: 8500 EARL RUDDER FWY S (REZ)
Staff reviewed the above-mentioned rezoning as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) Letter addressing TIA comments
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If all required
items are not received, your project will be not be scheduled on the P&Z agenda. Your project
may be placed on a future agenda once all comments have been addressed.
Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.qov/pz
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff Review Comments
PC: SKF Enterprise for LA Fcxd Family Trust, C/O L A Ford III (AKA Trey Ford), via;
treylaford(a�yahoo.com.i /
Danny & Susan Clancy, via; danny.susiegmail.com -I.
Clint Albert & Ruth Marie Porter Be9rand Revocable Living Trust, C/O Steve Bertrand,
via; steve.bertrand(a�paccar.com
P&DS Project No. 14-00900308 -
Planning dr Development Services
P.O.BOX 9960 • 1101 TEXAS AVENUE•COLLEGE STATION •TEXAS •77842
TEL.979.7 64.3570•FAX. 97 9.764.3496
STAFF REVIEW COMMENTS
Project: 8500 EARL RUDDER FWY S (REZ) - 14-00900308
PLANNING
1. Please see comments below.
Reviewed by: Jessica Bullock Date: 2/24/15
TRANSPORTATION
1. This development would be responsible for the addition of a west bound right turn lane at
the intersection of Texas Avenue and 2818. During the AM peak hour, of which the site
contributes 5% of the traffic at this intersection, the delay for that movement almost doubles
based on the site traffic. Please provide a letter to attach to the TIA stating that the
developer will construct the turn lane with development of the site.
Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 2/23/2015
("0,i .a.er"
CITY OF COLI LEGE STATION
Home of Texas A&M University'
MEMORANDUM
DATE: January 16, 2015
TO: Veronica Morgan, Mitchell and Morgan, via; v@mitchellandmorgan.com -
FROM: Jessica Bullock, Staff Planner
SUBJECT: 8500 EARL RUDDER FWY S (REZ)
Staff reviewed the above-mentioned rezoning as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and to be scheduled for a future Planning
& Zoning Commission meeting:
One (1) 24"x36" copy of the revised Rezoning Map;
One (1) revised TIA
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If all required
items are not received, your project will be not be scheduled on the P&Z agenda. Your project
may be placed on a future agenda once all comments have been addressed.
Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be
accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/pz
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff Review Comments
PC: SKF Enterprise for LA Ford-Family Trust, C/O L A Ford III (AKA Trey Ford), via;
treylaford(a yahoo.com
Danny & Susan Clancy, via; danny.susie(a�gmail.com'
Clint Albert & Ruth Marie Porter Bertrand Revocable Living Trust, C/O Steve Bertrand,
via; steve.bertrand(a�paccar.com
P&DS Project No. 14-00900308
Planning er Development Services
P.O.BOX 9960 • 1101'TEXAS AVENUE•COLLEGE STATION •TEXAS •77842
TEL.979.764.3570•FAX. 979.764.3496
STAFF REVIEW COMMENTS NO. 1
Project: 8500 EARL RUDDER FWY S (REZ) — (14-00900308)
PLANNING
1. No comments at this time.
Reviewed by: Jessica Bullock Date:1/13/15
ENGINEERING COMMENTS NO. 1
1. FYI...Per our previous discussions and comments, portions of the floodplain may be
reclaimable, but a No Adverse Impacts flood study will need to be provided with the site
plan/development permit application. Please note that although some portions of the
floodplain are proposed to be rezoned, further drainage analysis may determine that all of
these areas may not be developable.
Reviewed by: Erika Bridges
Date: 1/14/15
TRANSPORTATION
1. Driveway locations will be reviewed with the site layout.
2. Please show the 2016+site conditions with only the improvements that are proposed by the
development. Please provide the program outputs for this scenario. The text was
somewhat confusing for what improvements the development would be constructing.
3. Driveway C would require a right turn lane due to the volume. With a speed limit greater
than 40 mph, a driveway with 25 vph would require a right turn lane.
Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 1/15/15
MITCHELL
MORGAN
Jessica Bullock February 5, 2015
City of College Station
P.O. Box 9960
College Station, Texas 77842
RE: 8500 EARL RUDDER FWY S (REZ)
Dear Jessica,
Attached please find the following:
• We did not provide a 24"x36" copy of the revised Rezoning Map, because there were no
required changes; and
• One (1) revised TIA has been emailed to Danielle Singh, PE.
STAFF REVIEW COMMENTS NO. 1
Project: 8500 EARL RUDDER FWY S (REZ) — (14-00900308)
PLANNING
1. No comments at this time.
Response: Thank you.
ENGINEERING COMMENTS NO. 1
1. FYI...Per our previous discussions and comments, portions of the floodplain may be
reclaimable, but a No Adverse Impacts flood study will need to be provided with the site
plan/development permit application. Please note that although some portions of the
floodplain are proposed to be rezoned, further drainage analysis may determine that all of
these areas may not be developable.
Response: Understood.
TRANSPORTATION
1. Driveway locations will be reviewed with the site layout.
Response: Understood.
2. Please show the 2016+site conditions with only the improvements that are proposed by the
development. Please provide the program outputs for this scenario. The text was
somewhat confusing for what improvements the development would be constructing.
1
3204 EARL RUDDER FWY.S. • COLLEGE STATION,TX 77845 • T 979.260.6963 • F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
Response: Noted. Two scenarios are presented in the updated TIA: S+F with "site-
required improvements" and S+F with "all improvements". It should be noted that
"site-required improvements" were made to maintain the existing LOS at all locations.
Further recommendations to achieve LOS D are evaluated under the "all
improvements" scenario. Additional text and figures were added for clarification.
3. Driveway C would require a right turn lane due to the volume. With a speed limit greater
than 40 mph, a driveway with 25 vph would require a right turn lane.
Response: Agreed. A right-turn deceleration lane is recommended in the updated
TIA.
If . have any questions or comments, please feel free to call our office at 979-260-6963.
`in•-rely,
1 0 __
Veronica J.:. •rg.�' .E., C.F.M.
Managing P-rt er