Loading...
HomeMy WebLinkAboutLetter of Completion CITY OF COLLEGE STATION LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION,TEXAS Re:Completion of(Subdivision/Project):(Cherry Street Apartments 1 P&DS Project No.:ISPR2015-900002 Dear Developer: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station,Texas.This approval and acceptance by the City is requested in order that we may finalize any sub- contracts and to affirm their warranty on the work.This approval and acceptance by the City of improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project.The one year warranty is hereby affirmed and agreed to by the owner,contractor,and by their sub-contractors as indicated by signatures below.The one year warranty begins at Dedication Date,as indicated below. INFRASTRUCTURE COMPLETED DEDICATION DATE 1Water 1 107-11-16 1 ISIIewALK I Ioi- - I 101-1l-16 I Company: CS Second St Company: KWA Construction Address: 16800 Westgrove Dr.,Ste.600 Address: 16800 Westgrove Dr.,Ste.300 Addison,TX 75001 Addison,TX 75001 E-mail: thebelin@newschooladv.com E-mail: dturnbow@kwaconstruction.com Phone No.: (214)265-8686 Phone No.: (940)781-6998 Signature67,/z,e145Zik Signature: k c '.."---.6 Name: GregNash Name : David C.Turnbow Title OcktATtkettAL ..,.(Mit-trA4 Title: Superintendant For Office Use Only7,,/zio•••2 ACCEPTANCE&APPROVAL: 94,Clet.-- PP/1AI) / City E ineer City Inspector ® Plat Filed 0 Off-site Easements Filed ® Temporary Blanket Easement Filed 0 No Other Easements Needed IPrint Form I SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station,Texas 77845 Firm No. 12327 Cherry Street Apartments Engineer's Estimate for Public Infrastructure Construction Improvements Estimated Item Description Unit Unit Price Total Quantity General Items 1 Mobilization,Overhead,General Conditions&Construction Staking LS 1 $ 8,000.00 $ 8,000.00 2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,000 00 $ 1,000 00 Filter Dam,etc.,complete in place 3 Traffic Control LS 1 $ 5,000.00 $ 5,000.00 General Items Subtotal $ 14,000.00 Public Sitework 4 Concrete Sidewalk Under Brick Payers,complete in place SF 4476 $ 4.20 $ 18,799 20 5 Brick Pavers,complete in place SF 4476 $ 5.50 $ 24,618.00 6 Tree Grates,complete in place EA 20 $ 350.00 $ 7,000.00 7 ADA Ramps-Detectable Waming Surfaces,complete in place EA 4 $ 600.00 $ 2,400.00 8 Concrete Curb,complete in place LF 623 $ 4.00 $ 2,492.00 9 Demo&Remove Concrete Pavement,Sidewalk,&Curb,complete in place SF 3050 $ 3.00 $ 9,150.00 10 6"Concrete w/Standard Curb Pavement Removal and Replacement,complete in place SF 1028 $ 10.00 $ 10,280.00 11 HMAC Removal&Replacement,complete in place SF 2054 $ 12.00 $ 24,648.00 Public Sitework Subtotal $ 99,387.20 Public Storm Sewer 12 Junction Box,complete in place EA 4 $ 3,500.00 $ 14,000.00 13 18"RCP Pipe-Structural Backfill,complete in place LF 232 $ 70.00 $ 16,240.00 14 Concrete Headwall,complete in place EA 1 $ 1,500.00 $ 1,500.00 Public Storm Sewer Subtotal $ 31,740.00 Page 1 of 2 Cherry Street Apartments Engineer's Estimate for Public Infrastructure Construction Improvements Item Description Estimated 1 Unit Quantit) Unit Price Total Water Construction Items 15 Connect to Existing 8"Water Line EA 2 $ 1,500.00 $ 3,000.00 16 Connect to Existing 6"Water Line EA 3 $ 1,000.00 $ 3,000.00 17 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 110 $ 32.00 $ 3,520.00 18 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 200 $ 28.00 $ 5,600.00 19 8"45°Bend,complete in place EA 3 $ 500.00 $ 1,500.00 20 6"45°Bend,complete in place EA 4 $ 400.00 $ 1,600.00 21 8"x 8"M.J.Tee,complete in place EA 1 $ 650.00 $ 650.00 22 8"x 6"M.J.Tee,complete in place EA 1 $ 600.00 $ 600.00 23 8"M.J.Gate Valve,complete in place EA 1 $ 1,200.00 $ 1,200.00 24 6"M.J.Gate Valve,complete in place EA 2 $ 1,000.00 $ 2,000.00 25 Water Line Testing LS 1 $ 1,000.00 $ 1,000.00 26 Reconnect Existing Water Services,complete in place LS 1 $ 3,000.00 $ 3,000.00 Water Construction Items Subtotal $ 26,670.00 General Items Subtotal $ 14,000.00 Public Sitework Subtotal $ 99,387.20 Public Storm Sewer Subtotal $ 31,740.00 Water Construction Items Subtotal $ 26,670.00 TOTAL CONSTRUCTION $ 171,797.20 IltO re, ;� DEVEN L. DOYEN 0 109835 f % .• I5 , ,3 •...iii° 21 FIRM // 12327 SCHULTZ ENGINEERING, LLO Page 2 of 2