HomeMy WebLinkAboutLetter of Completion CITY OF COLLEGE STATION
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS
Re:Completion of(Subdivision/Project):(Cherry Street Apartments 1
P&DS Project No.:ISPR2015-900002
Dear Developer:
The purpose of our letter is to request that the following listed improvements be approved and accepted as being
constructed under city inspection and completed according to plans and specifications as approved and required by the
City of College Station,Texas.This approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work.This approval and acceptance by the City of improvements listed below
does hereby void the letter of guarantee for the listed improvements on the above referenced project.The one year
warranty is hereby affirmed and agreed to by the owner,contractor,and by their sub-contractors as indicated by signatures
below.The one year warranty begins at Dedication Date,as indicated below.
INFRASTRUCTURE COMPLETED DEDICATION DATE
1Water 1 107-11-16
1
ISIIewALK I Ioi- -
I
101-1l-16
I
Company: CS Second St Company: KWA Construction
Address: 16800 Westgrove Dr.,Ste.600 Address: 16800 Westgrove Dr.,Ste.300
Addison,TX 75001 Addison,TX 75001
E-mail: thebelin@newschooladv.com E-mail: dturnbow@kwaconstruction.com
Phone No.: (214)265-8686 Phone No.: (940)781-6998
Signature67,/z,e145Zik Signature: k c
'.."---.6
Name: GregNash
Name : David C.Turnbow
Title OcktATtkettAL ..,.(Mit-trA4
Title: Superintendant
For Office Use Only7,,/zio•••2
ACCEPTANCE&APPROVAL: 94,Clet.-- PP/1AI)
/ City E ineer City Inspector
® Plat Filed 0 Off-site Easements Filed
® Temporary Blanket Easement Filed 0 No Other Easements Needed
IPrint Form I
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station,Texas 77845
Firm No. 12327
Cherry Street Apartments
Engineer's Estimate for
Public Infrastructure Construction Improvements
Estimated
Item Description Unit Unit Price Total
Quantity
General Items
1 Mobilization,Overhead,General Conditions&Construction Staking LS 1 $ 8,000.00 $ 8,000.00
2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,000 00 $ 1,000 00
Filter Dam,etc.,complete in place
3 Traffic Control LS 1 $ 5,000.00 $ 5,000.00
General Items Subtotal $ 14,000.00
Public Sitework
4 Concrete Sidewalk Under Brick Payers,complete in place SF 4476 $ 4.20 $ 18,799 20
5 Brick Pavers,complete in place SF 4476 $ 5.50 $ 24,618.00
6 Tree Grates,complete in place EA 20 $ 350.00 $ 7,000.00
7 ADA Ramps-Detectable Waming Surfaces,complete in place EA 4 $ 600.00 $ 2,400.00
8 Concrete Curb,complete in place LF 623 $ 4.00 $ 2,492.00
9 Demo&Remove Concrete Pavement,Sidewalk,&Curb,complete in place SF 3050 $ 3.00 $ 9,150.00
10 6"Concrete w/Standard Curb Pavement Removal and Replacement,complete in place SF 1028 $ 10.00 $ 10,280.00
11 HMAC Removal&Replacement,complete in place SF 2054 $ 12.00 $ 24,648.00
Public Sitework Subtotal $ 99,387.20
Public Storm Sewer
12 Junction Box,complete in place EA 4 $ 3,500.00 $ 14,000.00
13 18"RCP Pipe-Structural Backfill,complete in place LF 232 $ 70.00 $ 16,240.00
14 Concrete Headwall,complete in place EA 1 $ 1,500.00 $ 1,500.00
Public Storm Sewer Subtotal $ 31,740.00
Page 1 of 2
Cherry Street Apartments
Engineer's Estimate for
Public Infrastructure Construction Improvements
Item Description Estimated
1 Unit Quantit) Unit Price Total
Water Construction Items
15 Connect to Existing 8"Water Line EA 2 $ 1,500.00 $ 3,000.00
16 Connect to Existing 6"Water Line EA 3 $ 1,000.00 $ 3,000.00
17 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 110 $ 32.00 $ 3,520.00
18 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 200 $ 28.00 $ 5,600.00
19 8"45°Bend,complete in place EA 3 $ 500.00 $ 1,500.00
20 6"45°Bend,complete in place EA 4 $ 400.00 $ 1,600.00
21 8"x 8"M.J.Tee,complete in place EA 1 $ 650.00 $ 650.00
22 8"x 6"M.J.Tee,complete in place EA 1 $ 600.00 $ 600.00
23 8"M.J.Gate Valve,complete in place EA 1 $ 1,200.00 $ 1,200.00
24 6"M.J.Gate Valve,complete in place EA 2 $ 1,000.00 $ 2,000.00
25 Water Line Testing LS 1 $ 1,000.00 $ 1,000.00
26 Reconnect Existing Water Services,complete in place LS 1 $ 3,000.00 $ 3,000.00
Water Construction Items Subtotal $ 26,670.00
General Items Subtotal $ 14,000.00
Public Sitework Subtotal $ 99,387.20
Public Storm Sewer Subtotal $ 31,740.00
Water Construction Items Subtotal $ 26,670.00
TOTAL CONSTRUCTION $ 171,797.20
IltO re, ;�
DEVEN L. DOYEN 0
109835 f %
.• I5
, ,3
•...iii° 21
FIRM // 12327
SCHULTZ ENGINEERING, LLO