HomeMy WebLinkAboutCorrespondence Jessica Bullock
From: Benjamin Mccarty
Sent: Tuesday, January 20, 2015 11:52 AM
To: Jessica Bullock
Subject: RE: Second St Apts
Thank you!
Benjamin McCarty
Plans Examiner(Commercial & Multi-Family Projects)
Building Division
Planning & Development Services Dept.
P: 979.764.3754 F: 979.764.3496
City Website:www.cstx.gov
P.O. Box 9960
1101 Texas Avenue
College Station,Texas 77842
(*I
CITY c W COI1i:G1-.ST.1TIoN
Horst of Ties AoM LSurr►uq'
From:Jessica Bullock
Sent:Tuesday,January 20, 2015 11:23 AM
To: Benjamin Mccarty
Subject: RE: Second St Apts
Ok. I will add that to my comments. Also I have looked at the building set already so I can call them and say it will be on
hold until the SP is stamped but they may still get comments from you.
From: Benjamin Mccarty
Sent:Tuesday,January 20, 2015 11:21 AM
To:Jessica Bullock
Subject: RE: Second St Apts
Jess,
Accessible parking required for apartments is 2 percent of the approved provided total parking count per the UDO.
Example: (if 176 x .02 = 3.52) = round up to 4 Accessible Parking Spaces.
The entry doors and exit doors shall have hard, solid surface landings and sidewalks to comply with the Accessibility
Standards for an Accessible Route. Decomposed granite does not meet ccessible Route requirements.
CO
Benjamin McCarty 011
Plans Examiner(Commercial & Multi-Family Projects)
Building Division
Planning & Development Services Dept.
1
Jessica Bullock
From: Samuel D. Weido
Sent: Tuesday, January 27, 2015 7:55 AM
To: Jessica Bullock
Cc: Deven Doyen
Subject: RE: Second Street Apts
Jessica I visited with Deven at Schultz Engineering and he is currently working on that easement. Right now it looks like
about a 10' x 32'. However, he is still tweaking things and will submit it to your office once he has the exact size nailed
down. Let me know if you need anything else.
From:Jessica Bullock
Sent: Monday,January 26, 2015 5:38 PM
To: Samuel D. Weido
Subject: RE: Second Street Apts
What size easement do you need for the transformer?
From: Samuel D. Weido
Sent: Friday,January 16, 2015 3:26 PM
To:Jessica Bullock
Subject: RE: Second Street Apts
You can mention it again, it never hurts to remind them. I have been in contact with the civil engineer and he is aware
that we need one light on boyett st. He has the specs as well.
From:Jessica Bullock
Sent: Friday,January 16, 2015 3:25 PM
To: Samuel D. Weido
Subject: RE: Second Street Apts
One more thing, I noticed there is currently one street light there. Do they need any others, should I include a note for
them to contact you about that?
From: Samuel D. Weido
Sent: Friday,January 16, 2015 3:20 PM
To:Jessica Bullock
Subject: RE: Second Street Apts
There is a transformer going on the Boyett St side right behind the traditions parking garage and yes it will need an
easement.
From:Jessica Bullock
Sent: Friday,January 16, 2015 3:11 PM
1
Jessica Bullock
From: Jessica Bullock
Sent: Friday, January 16, 2015 4:15 PM
To: Wally Urrutia
Subject: RE: Second St Apts
Ok, that works. Just wanted to make sure that you are covered. It wasn't until I looked at the building elevation sheets
that I could see the clearance space is less than 14.
From: Wally Urrutia
Sent: Friday,January 16, 2015 3:37 PM
To:Jessica Bullock
Subject: RE: Second St Apts
That's what we noticed on the site plan. I had made a comment asking that we need to discuss how garbage services
would be collected. Some of these roll-out the container from the building, so I don't know if this is what their intention
is. I have not heard anything from the developer.
Thanks.
From:Jessica Bullock
Sent: Friday,January 16, 2015 3:21 PM
To: Wally Urrutia
Subject: Second St Apts
Wally,
For project 15-02, the clear space for the compactor does not appear to have a 14' clear space. They are also showing
roll-up doors. I wanted to check with you to see if you had any conversations with the applicant.
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1 101 Texas Avenue
College Station, TX 77842
Office: 979.764.3757
Fax: 979.764.3496
Email:jbullock@cstx.gov
Website: www.cstx.gov
1
Jessica Bullock
From: Samuel D. Weido
Sent: Friday, January 16, 2015 3:26 PM
To: Jessica Bullock
Subject: RE: Second Street Apts
You can mention it again, it never hurts to remind them. I have been in contact with the civil engineer and he is aware
that we need one light on boyett st. He has the specs as well.
From:Jessica Bullock
Sent: Friday,January 16, 2015 3:25 PM
To: Samuel D. Weido
Subject: RE: Second Street Apts
One more thing, I noticed there is currently one street light there. Do they need any others, should I include a note for
them to contact you about that?
From: Samuel D. Weido
Sent: Friday,January 16, 2015 3:20 PM
To:Jessica Bullock
Subject: RE: Second Street Apts
There is a transformer going on the Boyett St side right behind the traditions parking garage and yes it will need an
easement.
From:Jessica Bullock
Sent: Friday,January 16, 2015 3:11 PM
To: Samuel D. Weido
Subject: Second Street Apts
Sam,
For project 15-02,they are proposing an electrical transformer on the bottom left of the site plan. Will they need an
easement for that?
Jessica Bullock
Staff Planner
Planning & Development Services
City of College Station
P.O. Box 9960
1 101 Texas Avenue
College Station, TX 77842
Office: 979.764.3757
Fax: 979.764.3496
Email:jbullock@cstx.gov
Website:www.cstx.gov
i
4. The tree planter detail on the site plan shows that 4" min caliper will be on Boyett St with 3"
min caliper on Cherry and Second. The landscape plan shows 4" min caliper all around,
please confirm which is used and revise plans accordingly.
5. Please provide detail for tree grates that are not located back of curb.
6. Please remove landscaping point calculations.
7. The label shows 54 H.D. Nandina but I am showing 59. Please revise plantings or quantity.
8. Please label existing and proposed street lights.
9. Decomposed granite does not meet accessibility standards. From the doorway to the
sidewalk there needs to be a hard, solid surface landing and sidewalk.
10. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights-of-way, and adjacent property disturbed during
construction.
11. Please add the following notes to the landscape plan.
• Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and
installed as per City Ordinance 2394.
• All BackFlow devices must be installed and tested upon installation as per City
Ordinance 2394.
Reviewed by: Jessica Bullock Date: 1/26/15