Loading...
HomeMy WebLinkAboutCorrespondence Jessica Bullock From: Benjamin Mccarty Sent: Tuesday, January 20, 2015 11:52 AM To: Jessica Bullock Subject: RE: Second St Apts Thank you! Benjamin McCarty Plans Examiner(Commercial & Multi-Family Projects) Building Division Planning & Development Services Dept. P: 979.764.3754 F: 979.764.3496 City Website:www.cstx.gov P.O. Box 9960 1101 Texas Avenue College Station,Texas 77842 (*I CITY c W COI1i:G1-.ST.1TIoN Horst of Ties AoM LSurr►uq' From:Jessica Bullock Sent:Tuesday,January 20, 2015 11:23 AM To: Benjamin Mccarty Subject: RE: Second St Apts Ok. I will add that to my comments. Also I have looked at the building set already so I can call them and say it will be on hold until the SP is stamped but they may still get comments from you. From: Benjamin Mccarty Sent:Tuesday,January 20, 2015 11:21 AM To:Jessica Bullock Subject: RE: Second St Apts Jess, Accessible parking required for apartments is 2 percent of the approved provided total parking count per the UDO. Example: (if 176 x .02 = 3.52) = round up to 4 Accessible Parking Spaces. The entry doors and exit doors shall have hard, solid surface landings and sidewalks to comply with the Accessibility Standards for an Accessible Route. Decomposed granite does not meet ccessible Route requirements. CO Benjamin McCarty 011 Plans Examiner(Commercial & Multi-Family Projects) Building Division Planning & Development Services Dept. 1 Jessica Bullock From: Samuel D. Weido Sent: Tuesday, January 27, 2015 7:55 AM To: Jessica Bullock Cc: Deven Doyen Subject: RE: Second Street Apts Jessica I visited with Deven at Schultz Engineering and he is currently working on that easement. Right now it looks like about a 10' x 32'. However, he is still tweaking things and will submit it to your office once he has the exact size nailed down. Let me know if you need anything else. From:Jessica Bullock Sent: Monday,January 26, 2015 5:38 PM To: Samuel D. Weido Subject: RE: Second Street Apts What size easement do you need for the transformer? From: Samuel D. Weido Sent: Friday,January 16, 2015 3:26 PM To:Jessica Bullock Subject: RE: Second Street Apts You can mention it again, it never hurts to remind them. I have been in contact with the civil engineer and he is aware that we need one light on boyett st. He has the specs as well. From:Jessica Bullock Sent: Friday,January 16, 2015 3:25 PM To: Samuel D. Weido Subject: RE: Second Street Apts One more thing, I noticed there is currently one street light there. Do they need any others, should I include a note for them to contact you about that? From: Samuel D. Weido Sent: Friday,January 16, 2015 3:20 PM To:Jessica Bullock Subject: RE: Second Street Apts There is a transformer going on the Boyett St side right behind the traditions parking garage and yes it will need an easement. From:Jessica Bullock Sent: Friday,January 16, 2015 3:11 PM 1 Jessica Bullock From: Jessica Bullock Sent: Friday, January 16, 2015 4:15 PM To: Wally Urrutia Subject: RE: Second St Apts Ok, that works. Just wanted to make sure that you are covered. It wasn't until I looked at the building elevation sheets that I could see the clearance space is less than 14. From: Wally Urrutia Sent: Friday,January 16, 2015 3:37 PM To:Jessica Bullock Subject: RE: Second St Apts That's what we noticed on the site plan. I had made a comment asking that we need to discuss how garbage services would be collected. Some of these roll-out the container from the building, so I don't know if this is what their intention is. I have not heard anything from the developer. Thanks. From:Jessica Bullock Sent: Friday,January 16, 2015 3:21 PM To: Wally Urrutia Subject: Second St Apts Wally, For project 15-02, the clear space for the compactor does not appear to have a 14' clear space. They are also showing roll-up doors. I wanted to check with you to see if you had any conversations with the applicant. Jessica Bullock Staff Planner Planning & Development Services City of College Station P.O. Box 9960 1 101 Texas Avenue College Station, TX 77842 Office: 979.764.3757 Fax: 979.764.3496 Email:jbullock@cstx.gov Website: www.cstx.gov 1 Jessica Bullock From: Samuel D. Weido Sent: Friday, January 16, 2015 3:26 PM To: Jessica Bullock Subject: RE: Second Street Apts You can mention it again, it never hurts to remind them. I have been in contact with the civil engineer and he is aware that we need one light on boyett st. He has the specs as well. From:Jessica Bullock Sent: Friday,January 16, 2015 3:25 PM To: Samuel D. Weido Subject: RE: Second Street Apts One more thing, I noticed there is currently one street light there. Do they need any others, should I include a note for them to contact you about that? From: Samuel D. Weido Sent: Friday,January 16, 2015 3:20 PM To:Jessica Bullock Subject: RE: Second Street Apts There is a transformer going on the Boyett St side right behind the traditions parking garage and yes it will need an easement. From:Jessica Bullock Sent: Friday,January 16, 2015 3:11 PM To: Samuel D. Weido Subject: Second Street Apts Sam, For project 15-02,they are proposing an electrical transformer on the bottom left of the site plan. Will they need an easement for that? Jessica Bullock Staff Planner Planning & Development Services City of College Station P.O. Box 9960 1 101 Texas Avenue College Station, TX 77842 Office: 979.764.3757 Fax: 979.764.3496 Email:jbullock@cstx.gov Website:www.cstx.gov i 4. The tree planter detail on the site plan shows that 4" min caliper will be on Boyett St with 3" min caliper on Cherry and Second. The landscape plan shows 4" min caliper all around, please confirm which is used and revise plans accordingly. 5. Please provide detail for tree grates that are not located back of curb. 6. Please remove landscaping point calculations. 7. The label shows 54 H.D. Nandina but I am showing 59. Please revise plantings or quantity. 8. Please label existing and proposed street lights. 9. Decomposed granite does not meet accessibility standards. From the doorway to the sidewalk there needs to be a hard, solid surface landing and sidewalk. 10. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. 11. Please add the following notes to the landscape plan. • Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. • All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Reviewed by: Jessica Bullock Date: 1/26/15