HomeMy WebLinkAboutCost Estimate f .
Mike R Choate
stripes Engineering&Construction
Tel:361.693.8828
TM Cell:361.290.3037
Fax:361.851.9514
mchoate@susser.com
May 18th 2015 •
Erika Bridges
Planning & Development Services
City of College Station
1101 Texas Avenue S.
College Station, TX 77842
Re: Dick's Iron Dukes Letter of Credit
Mrs. Bridges,
Our Engineer has prepared a cost estimate for the public improvements associated with Dick's Iron Dukes Final Plat in the
amount of$25,657.50. This cost is for the sidewalks along Wellborn Road, water line extension and fire hydrant.
As required by the Subdivision Regulations in the Unified Development Code, a Check, or Letter of Credit is being provided
in lieu of construction in order to obtain final plat approval by the Planning & Zoning Commission. All public and private
improvements are expected to commence upon approval of the development permit and is expected to be completed by
DEC. 2015.
Should you have any questions in regards to the cost estimate, check or Letter of Credit, please contact me.
Sincerely,
ke:L
,, r
Mike R. Choate
Sunoco - Stripes LLC
Engineering &Construction
Street Address: 4525 Ayers Street,Corpus Christi,Texas 78415 Mailing Address: P.O.Box 9036,Corpus Christi,Texas 78469 www.susser.com
Bank of America„...?....,,,
��ko,A�.Texas a=NA 15 4 2 7 3
APT Bank el Amen.
Texas
Member Federal Deposit Insurance Corporallon
APPLIED PETROLEUM TECHNOLOGIES,LTD. 88130 TX CHECK NO.
1119
P.O.Box 4227 CORPUS CHRIsil,TEXAS 78469-4227 (361)884-2463
DATE AMOUNT
*****$25, 657 dollars and . 50 cents***************** 5/19/2015********$25, 657 . 50**"
PAY VOID AFTER 90 DAYS
TOTHE City of College Station
ORDER 1101 Texas Avenue
OF
College Station, TX 77840
AUTHORIZ SIGNATURE
ii' L542730 1: L L L90 L 30 21: 00 2 3 3094 3 7 70 0