Loading...
HomeMy WebLinkAboutCost Estimate f . Mike R Choate stripes Engineering&Construction Tel:361.693.8828 TM Cell:361.290.3037 Fax:361.851.9514 mchoate@susser.com May 18th 2015 • Erika Bridges Planning & Development Services City of College Station 1101 Texas Avenue S. College Station, TX 77842 Re: Dick's Iron Dukes Letter of Credit Mrs. Bridges, Our Engineer has prepared a cost estimate for the public improvements associated with Dick's Iron Dukes Final Plat in the amount of$25,657.50. This cost is for the sidewalks along Wellborn Road, water line extension and fire hydrant. As required by the Subdivision Regulations in the Unified Development Code, a Check, or Letter of Credit is being provided in lieu of construction in order to obtain final plat approval by the Planning & Zoning Commission. All public and private improvements are expected to commence upon approval of the development permit and is expected to be completed by DEC. 2015. Should you have any questions in regards to the cost estimate, check or Letter of Credit, please contact me. Sincerely, ke:L ,, r Mike R. Choate Sunoco - Stripes LLC Engineering &Construction Street Address: 4525 Ayers Street,Corpus Christi,Texas 78415 Mailing Address: P.O.Box 9036,Corpus Christi,Texas 78469 www.susser.com Bank of America„...?....,,, ��ko,A�.Texas a=NA 15 4 2 7 3 APT Bank el Amen. Texas Member Federal Deposit Insurance Corporallon APPLIED PETROLEUM TECHNOLOGIES,LTD. 88130 TX CHECK NO. 1119 P.O.Box 4227 CORPUS CHRIsil,TEXAS 78469-4227 (361)884-2463 DATE AMOUNT *****$25, 657 dollars and . 50 cents***************** 5/19/2015********$25, 657 . 50**" PAY VOID AFTER 90 DAYS TOTHE City of College Station ORDER 1101 Texas Avenue OF College Station, TX 77840 AUTHORIZ SIGNATURE ii' L542730 1: L L L90 L 30 21: 00 2 3 3094 3 7 70 0