HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE:)-19 a/06 _
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS y
RE:• COMPLETION OF�71fili 0 oF,
t iC, S -1-con btnkeS
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by /
and by their subcontractors as indicated by signatures below.
Cid,....7
WORK COMPLETED WARRANTY DATE
A/64/e M-e A-'A/ r/f aer /l putt, II-6 -/5-
,EweQ .�{.1 n &i.4-C
Owner:J7riLle£S Lam-- • Contractor: <jUti17ECH eutuLN5 sor,....1 ;'•
Phone Number: 7/3-Sof-a9 Phone Number;eP3 S J5 j
Address: 15:73Ares yr. Address: 9/.1 Aok 4/
E
U .1 , h e. Siit(10 o.CCWI ii.mfY11 tp`SI/1N1412:Ctel-in':. awl
��/
Signatu ,� Signature: y� «.
ACCEPTANCE & APPROVAL
City Representative
,,/J 4PLAT FILED
`� TOFFSITE ESMTS FILED
ty E gineer
�TEMP BLANKET ESMT FILED
NO OTHER ESMTS NEEDED
Revised 1/31/07
SOP: Filing of Final Plats - Letters of Completion 04/23/14
Engineering Inspector/Date:
Project Engineer/Date:
DP Number:
- Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written
confirmation from the following contacts before forwarding Letter of Completion to development
review engineer:
o Erosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632)
o CS Water Services - General: Charles"Butch"Willis (0: 764-3435, C: 777-1202)
■ Water - coordinate fire flow analyses (or the design engineer for non-city utilities)
and confirm test results meets min requirements with the dev review engineer
(specific hydrants to test, if simultaneous, and min allowable flow)
■ Sanitary
VA,
CS Water Service— Liftstation: Doug Wallace (0: 764-6333)
o CS Electric and Streetlights: Gilbert Martinez (0: 764-6255)
o CS Public Works—Traffic Signs/Markings): Lee Robinson (0: 764-3695)
a' BTU Electric and Streetlights: Sonia Creda (0: 821-5770)
John Fontinoe or Randy Trimble (0: 821-5728)
Confirm with development review engineer that service agreement is in place with BTU
d�1p, Non-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson
Creek SUD, etc) confirm with development review engineer that infrastructure is complete
and for outstanding issues,
o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file
Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the
following attestation:
"I, , General Contractor for development, certify that the
improvements shown on this sheet were actually built, and that said improvements are
shown substantially hereon. I hereby certify that to the best of my knowledge, that the
materials of construction and sizes of manufactured items, if any are stated correctly
hereon."
General Contractor
o Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including
Private Detention Facilities with the following attestations:
"I hereby attest that I am familiar with the approved drainage plan and associated
construction drawings and furthermore, attest that the drainage facilities have been
constructed within dimensional tolerances prescribed by the Bryan &College station
Unified Stormwater Design Guidelines and in accordance with the approved construction
plans or amendments thereto approved by the City of College Station."
(affix seal) Licensed Professional Engineer
State of Texas No.
"I certify that the subdivision improvements shown on this sheet were actually built, and
that said improvements are substantially as shown hereon. I further certify, to the best of
my knowledge, that the materials of construction and sizes of manufactured items, if any,
are stated correctly hereon."
General Contractor
- Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings,
inspector to:
o file one set of Record Drawings in Public Works files, and
o forward one set of Record Drawings to Jeffery Speed (CSU)
- Inspectors should forward Letters of Completion to the development review engineer that
reviewed and stamped the construction plans after confirming:
o the date on the Letter of Completion Warranty should reflect the date when all associated
punchlist items are completed, and
o the Owner is shall be listed as the one affirming the one-year warranty
- Development review engineer to:
o add Dev Permit Number to Letter of Completion
o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar
is ready to be filed), all necessary easements (including offsite) have been filed, and
blanket easement issues are resolved, and
o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the
plat it may have been filed ahead of construction.)
- Deborah Grace-Rosier(Planning) to file the Final Plat utilizes a coversheet to confirm:
o infrastructure is accepted by Letter of Completion —or- Surety is provided and acceptable,
o signed and notarized mylar of final plat,
o parkland dedication has been paid,
o digital file of final plat is provided,
o a current paid tax certificate has been submitted,
o sidewalk fee in lieu paid (if applicable), and
- Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion
with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been
filed, we have all necessary easements, etc - and then forward the Letter of Completion to Alan
Gibbs (City Engineer) for final signature.
- Carol (Sr. Asst. City Engineer) to:
o enter the engineer's estimate and Letter of Completion date into Inspection List
o forward hard original of finalized Letter of Completion to Crystal (P&DS).
- Crystal to: verify
o signatures on the Letter of Completion,
o forward scanned copy of Letter of Completion and associated Engineers Estimate to the
owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Chris
Haver (Building), Carol Thompson (Accounting), Kristina Keller (Accounting), Courtney
Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles
"Butch"Willis (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges
(Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace-
Rosier(Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review.
o if don't have email addresses, mail copies to the owner and contractor, and
o place the original in Development Permit file.
- Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file.
VICollege station Utilities
Reliable, Affordable, Community Owned
Date test completed Monday November 2, 2015
Time completed 9:00 A.M.
Test completed by Howard Mitchell
Witness Jeff Boriski
FLOW HYDRANT
Location Stripes on Wellborn
Nozzle size 2.5
Hydrant number V-133
Pitot reading in PSI 65
Flow in G.P.M. 1350
STATIC HYDRANT
Location 4005 Southern Trace
Hydrant number V-068
Static PSI 77
Residual PSI 72
Comments Initial
LETTER OF COMPLETION
CITY ENGINEER DATE: `/" 30-,77°13-
CITY
0 )°13CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF
DICKS T %N C:DTPc; #2`NO2.)
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station, Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project. tic,
The one-year warranty is hereby affirmed and agreed to by .c RI PES UC,
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
P /Suc S(nEw,4i_kj• ;,?°/S
Owner: ST7I PrY L.0 . Contractor: SUM eti 61ti IA(Ittsystwit
Phone Number: 3/-- 693 3858 Phone Number: 530-00?-5 833-3
Address:/3C0 Address: 9// ?14(-r
Mic..lotkel, Chottte_Zstv-'oc o. Com "imnn a Are_ - ne . ' 'vx
Signatu Signature: Ilk . r
ACCEPTANCE & A
PPROVAL
City Rep r ntative
PLAT FILED
-�- OFF8ITE ESMTS FLEDity Engineer
)ITEMP BLANKET ESMT FILED
_ NO OTHER ESMTB NEEDED
Revised 1/31/07
SOP: Filing of Final Plats - Letters of Completion 04/23/14
Engineering Inspector/Date: F.,\-( A,kzu_izst�c:•e R
Project Engineer/Date:
DP Number: r-' 15 -l 5
- Inspectors shall acquire written (i.e. email) punchlist comments and subsequently written
confirmation from the following contacts before forwarding Letter of Completion to development
review engineer:
6 Erosion/Drainage: Donnie Willis (0: 764-6375, C: 229-7632)
,4*-- CS Water Services - General: Charles"Butch"Willis (0: 764-3435, C: 777-1202)
• Water - coordinate fire flow analyses (or the design engineer for non-city utilities)
and confirm test results meets min requirements with the dev review engineer
(specific hydrants to test, if simultaneous, and min allowable flow)
• Sanitary
CS Water Service— Liftstation: Doug Wallace (0: 764-6333)
r,1' CS Electric and Streetlights: Gilbert Martinez (0: 764-6255)
CS Public Works—Traffic Signs/Markings): Lee Robinson (0: 764-3695)
,- BTU Electric and Streetlights: Sonia Creda (0: 821-5770)
John Fontinoe or Randy Trimble (0: 821-5728)
Confirm with development review engineer that service agreement is in place with BTU
NIP Non-City Utility Service Providers: (Wellborn Water SUD, Brushy Creek SUD, Wickson
Creek SUD, etc) confirm with development review engineer that infrastructure is complete
and for outstanding issues,
o Digital Constrution Pictures: From contractor on CD-R, Inspector to confirm and file
o Record Drawings: (2 Red-Lined Copies) for all Public Infrastructure with the
following attestation:
"I, , General Contractor for development, certify that the
improvements shown on this sheet were actually built, and that said improvements are
shown substantially hereon. I hereby certify that to the best of my knowledge, that the
materials of construction and sizes of manufactured items, if any are stated correctly
hereon."
General Contractor
o Record Drawings: (2 Red-Lined Copies) for Public Drainage Infrastructure including
Private Detention Facilities with the following attestations:
"I hereby attest that I am familiar with the approved drainage plan and associated
construction drawings and furthermore, attest that the drainage facilities have been
constructed within dimensional tolerances prescribed by the Bryan &College station
Unified Stormwater Design Guidelines and in accordance with the approved construction
plans or amendments thereto approved by the City of College Station."
(affix seal) Licensed Professional Engineer
State of Texas No.
"I certify that the subdivision improvements shown on this sheet were actually built, and
that said improvements are substantially as shown hereon. I further certify, to the best of
my knowledge, that the materials of construction and sizes of manufactured items, if any,
are stated correctly hereon."
General Contractor
- Inspectors to review Red-lined Record Drawings, upon acceptable confirmation of drawings,
inspector to:
o file one set of Record Drawings in Public Works files, and
o forward one set of Record Drawings to Jeffery Speed (CSU)
- Inspectors should forward Letters of Completion to the development review engineer that
reviewed and stamped the construction plans after confirming:
o the date on the Letter of Completion Warranty should reflect the date when all associated
punchlist items are completed, and
o the Owner is shall be listed as the one affirming the one-year warranty
- Development review engineer to:
o add Dev Permit Number to Letter of Completion
o stamp the Letter of Completion to confirm by initialing that the final plat is filed (or mylar
is ready to be filed), all necessary easements (including offsite) have been filed, and
blanket easement issues are resolved, and
o initial and route the Final Plat mylar for filing. (Note if the developer provided surety the
plat it may have been filed ahead of construction.)
- Deborah Grace-Rosier(Planning) to file the Final Plat utilizes a coversheet to confirm:
o infrastructure is accepted by Letter of Completion —or- Surety is provided and acceptable,
o signed and notarized mylar of final plat,
o parkland dedication has been paid,
o digital file of final plat is provided,
o a current paid tax certificate has been submitted,
o sidewalk fee in lieu paid (if applicable), and
- Development review engineer, upon the filing of Final Plat, stamp the Letter of Completion
with the new stamp and verify-initial-n/a the Final Plat was filed, offsite easements have been
filed, we have all necessary easements, etc - and then forward the Letter of Completion to Alan
Gibbs (City Engineer) for final signature.
- Carol (Sr. Asst. City Engineer) to:
o enter the engineer's estimate and Letter of Completion date into Inspection List
o forward hard original of finalized Letter of Completion to Crystal (P&DS).
- Crystal to: verify
o signatures on the Letter of Completion,
o forward scanned copy of Letter of Completion and associated Engineers Estimate to the
owner, developer, contractor, Terry Boriskie (Building), Ben McCarty (Building), Chris
Haver (Building), Carol Thompson (Accounting), Kristina Keller (Accounting), Courtney
Kennedy (Accounting), Jeffery Speed (CSU), Stephen Maldonado Sr. (CSU), Charles
"Butch"Willis (CSU), Carol Cotter (Engineering), Alan Gibbs (Engineering), Erika Bridges
(Engineering), Danielle Singh (Engineering), Gilbert Martinez (Electric) and Deborah Grace-
Rosier (Planning). Kristina Keller will forward to Diane Broadhurst (CSU) after her review.
o if don't have email addresses, mail copies to the owner and contractor, and
o place the original in Development Permit file.
- Deborah to place a hard copy of the Letter of Completion in the associated Planning Final Plat file.
HProject Name:Stripes
ARCHITECTS Project Location:College Station,TX
ENGINEERS Date: April 28,2015
INTERIORS OPINION OF PROBABLE COST
Estimate is based upon Sidewalk Plan OTP
SITE PREPARATION Quanity Unit Unit Price Total
Earthwork
Clear,grub,and prep 0.2 AC $ 1,500.00 $ 300.00
SITE PREP TOTAL $ 300.00
EROSION AND SEDIMENT CONTROL Quanity Unit Unit Price Total
Erosion Control Lump Sum 1 EA $ 750.00 $ 750.00
EROSION TOTAL $ 750.00
SIDEWALK Quanity Unit Unit Price Total
Aggregate Base 6" 275 SY $ 10.00 $ 2,750.00
Sidewalk 4" 275 SY $ 25.00 $ 6,875.00
SIDEWALK $ 9,625.00
WATER LINE AND HYDRANT Quanity Unit Unit Price Total
C900 Main Extension w/Fittings 8" 90 LF $ 35.00 $ 3,150.00
Fire Hydrant Valve&Assembly 1 EA $ 4,000.00 $ 4,000.00
12"Gate Valve and Valve Box 1 EA $ 2,500.00 $ 2,500.00
8"Gate Valve and Valve Box 1 EA $ 1,500.00 $ 1,500.00
8"Tap Assembly 1 EA 5 1,500.00 $ 1,500.00
WATER LINE AND HYDRANT $ 12,650.00
SITE PREPARATION $ 300.00
EROSION AND SEDIMENT CONTROL $ 750.00
SIDEWALK $ 9,625.00
--...�G`w►MNNo o WATER LINE AND HYDRANT $ 12,650.00
2.1
�PfiE'OF14i SUB-TOTAL $ 23,325.00
Ksr oI
,.j .. `.s*v1 10%CONTINGENCY $ 2,332.50
GRAND TOTAL $ 25,657.50
PAUL J. MOSS ol,
o'•)s.4,s
116731 t;i
, �'•.
.:
•
i$ '°17OENS'*\ .\+$.