I am writing on behalf of Enertech Resources in regard to the proposed tower modification project
known as Brentwood Extension.The scope of work of this project is to extend the existing 35 foot tall stealth
communications tower to 70 feet within the existing 648 square foot compound. This will elevate the
classification of the site from an intermediate to a major wireless telecommunications facility and thus
requires a Conditional Use Permit from The City of College Station.The intent of this letter is to catalog the
contents of the Brentwood Extension Conditional Use Permit Application Package,assembled as follows:
• Conditional Use Permit Checklist Cover Letter
• Conditional Use Permit Checklist
• Conditional Use Permit Application
• Owner and Engineer Certifications
• Owner Authorization Letter
• Letter of Authorities
• Property Lease and Bill of Sale
• Site Plan Checklist Cover Letter
• Site Plan Checklist
• Site Plan(6 copies)
• Site Plan Reference Drawings
o Survey
o Landscape Plan
o Tower and Foundation Designs(as Attachment 1)
• Attachments
1. Tower and Foundation Designs(specifications and structural analyses)
2. Tower Proximity Map(distance to nearby WTF's)
3. Visual Impact Analysis(photographic simulations)
4. Federal Regulatory Compliance(affidavit)
5. Colocation Allowances(letter and affidavit)
6. AT&T Grid Plan(carrier propagation map)
7. Need and Alternative Solutions(affidavit)
If any clarifications are desired during the review process,please feel free to contact me directly.c)Sincerely
(Lal.ir.j
Jus ' uggins,PE
Enertech Resources,LLC
7500 Rialto Blvd,Suite 110
Austin,TX 78735
P:830.387.4502 ext.220
•
E!1TEI1;�" R
January 16,2015
City of College Station
PO Box 9960
College Station,TX 77842
To whom it may concern,
I am writing on behalf of Enertech Resources in regard to the proposed tower modification project
known as Brentwood Extension.The scope of work of this project is to extend the existing 35 foot tall stealth
tower to 70 feet within the existing 648 square foot compound.Throughout the duration of this project no
changes will be made to following aspects of the existing site:
• Ground mechanics including grading,drainage,erosion control and needs thereof
• Impact upon public infrastructure
• Site access
City Planning and Development staff have confirmed during pre-application discussions that this grants
exemption from submission of the following items found on the Conditional Use Permit Application
checklist:
• Development Permit Application/Public Infrastructure Review and Inspection Fee
• Grading,drainage,and erosion control plans and reports
• Public infrastructure plans and documents
Additionally, our client (DIAMOND TOWERS IV, LLC) owns only the Brentwood (1) tower within the
City,ETJ,or one mile of City boundary where the ETJ does not extend that far and has no new sites planned
for construction within this area(i.e.no inventory to report).These checklist items are therefore marked as
"N/A"for not applicable.Thank you for your consideration in this matter.
Sincerely, _
‘11.,(72/...„,
Justi H ggins,PE
Ener Resources,LLC
7500 Rialto Blvd,Suite 110
Austin,TX 78735
P:830.387.4502 ext.220
February 2, 2015
Diamond Communications, LLC
820 Morris Turnpike, Suite 104
Short Hills, New Jersey 07078
SUBJECT: DIAMOND COMMUNICATIONS SITE "BRENTWOOD" AUTHORIZATION LETTER
To Whom It May Concern:
Based on the rights and privileges outlined in the Lease Agreement between Diamond
Communications, LLC and ESPA Manor, LLC, authorization has been obtained to pursue a
Conditional Use Permit to improve, modify or alter to the Premises located at:
2504 Texas Avenue South
College Station, Texas 77845
Z � -
Name:
Title: Matnn4T-t-t 1���'+�t ei--
Date: 2/2/'2 U 1
,.k
0 Et1ERTECH
R E S O U R C E 5
January 16,2015
City of College Station
PO Box 9960
College Station,TX 77842
To whom it may concern,
I am writing on behalf of Enertech Resources in regard to the proposed tower modification project
known as Brentwood Extension.The scope of work of this project is to extend the existing 35 foot tall stealth
tower to 70 feet. This will elevate the classification of the site from an intermediate to a major wireless
telecommunications facility and requires a Conditional Use Permit(CUP)from The City of College Station.
The intent of this letter is to define authorities of the three parties involved in the application process as
follows:
• Enertech Resources,LLC
• CUP Applicant on behalf of our client,Diamond Towers IV,LLC
• Diamond Towers IV,LLC
• Holds the attached lease on the subject property
• Owns all permanently installed equipment on site
• CSTX Hotels,LLC
• Land owner
• Has leased the subject property to our client(lease attached)
Please feel free to contact me directly for additional information.
Sincerely,
4,c2Litir:
Justin Liggins,PE
Enertech Resources,LLC
7500 Rialto Blvd,Suite 110
Austin,TX 78735
P:830.387.4502 ext.220