Loading...
HomeMy WebLinkAboutDevelopment Permit ffp.s.444 DEVELOPMENT PERMIT PERMIT NO. 15-29 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA CITY arninCOLLECT ION Pl<ani»g tMrl.-p,»gni cell 71, RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: (CSISD A&M Consolidated GYM Exp.) 1801 Harvey Mitchell Parkway South Southwood, Section 5, Tract 1 DRAINAGE BASIN: Bee Creek Trib. "B" DATE OF ISSUE: 03/09/2015 VALID FOR 24 MONTHS OWNER: CONTRACTOR: College Station Independent School District 1812 Welsh Ave. College Station, TX 77840 TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized. 2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements. If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor's responsibility to implement measures that will meet City, State, and Federal requirements. 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed. 10. Special Conditions: I,—Z AeAN 7- 5 , the Contractor, hereby agree to comply with all conditions herein. actor Signature Date Calo) 41 � - oy ZtSc.\n'. �o►�4 ' cc'1s. cow% Phone number E-mail I hereby grant this permit for development. Contact Ketll., I th kev (979) 777- 0.M , the Public Works Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. � -- 37y/.20 City En net/Representative Date -411 IMES "'MOM - Ai IIlaw SMALL CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from small construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: http://www.tceq.state.tx.usinav/permits/wq_construction.html Operator Name: A&M Consolidated High School Renovations Contact Name and Phone Number: Zach Tschirhart, (210) 412-0734 A&M Consolidated High School Renovations 1801 Harvey Mitchell Parkway South Project Description: Physical address or College Station, Texas 77840 description of the site's location, estimated start Start Date: 2/18/2015 date and projected end date, or date that disturbed End Date: 8/17/2015 soils will be stabilized Location of Storm Water Pollution Prevention Plan: For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the following certification must be completed: Zach Tschirhart (Typed or Printed Name Person Completing This Certification)certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting nauthorized discharges,including the possibility of fine and imprisonment for knowing violations. Signature and Title =— Date 3 / ions Date Notice Removed MS4 operator notified per Part II.F.3.