Loading...
HomeMy WebLinkAboutStaff Review CITY OF COI:LIGE STATION Home of Texas AcI M University* MEMORANDUM DATE: February 16, 2015 TO: Veronica Morgan, Mitchell & Morgan, LLP, via; v( mitcfndmorgan.com FROM: Jessica Bullock, Staff Planner SUBJECT: CSISD A&M CONSOLIDATED GYM EXPANSION (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) 24"x36" of the following revised sheets CVL-1, CVL-2, and A2.01; Easement Dedication Sheet and required documents (please note that the Site Plan will not be stamped approved until the Blanket Easement, or all other appropriate easements, have been dedicated to the City of College Station). Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Jessica Bullock at 979.764.3570. Attachments: Staff Review Comments PC: John Hall, College Station, Independent School District, via.jhall4isd.org Melissa Fleming, VLK Architects, via; mfleminq( vlkarc it cts.com P&DS Project No. 15-00900029 Planning 6 Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 rctu onv/devservices STAFF REVIEW COMMENTS NO. 1 Project: CSISD A&M Consolidated Gym Expansion (SP 15-00900029) PLANNING 1. Please provide a phase line for the area disturbed including a 20-foot buffer. 2. Please adjust the scale on sheet A2.01 looks like it is 1:30. 3. Please call Sam Weido at 764-6314 regarding the easement for the electrical work. 4. Please continue to follow-up with Steven Smith at 764-6273 regarding fire comments. 5. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter. Reviewed by: Jessica Bullock Date: February 16, 2015 LANDSCAPING/STREETSCAPING/BUFFER 1. Please show the barricade around the trees to be protected. Reviewed by: Jessica Bullock Date: February 16, 2015 ENGINEERING COMMENTS NO. 1 1. Provide a 15 foot PUE instead of a 10 foot PUE. 2. Provide a title report confirming that there's no existing PUE crossing the proposed building. 3. Provide silt fence for the underground electric line passing between the sidewalks by the detention pond area. 4. Provide Building type and fire flow on the site plan. Show existing fire flow demand and additional fire flow demand required for the additional building. 5. FYI it is recommended to have a junction boxes where changes of alignments are made for storm sewer system. 6. FYI it is recommended to have adequate clearing space with infrastructures for maintenance purposes. Reviewed by: Kevin Ferrer Date: February 16, 2015 FIRE 1. Working with CSISD and Contractor about exits in the gym. They want to close off several exits but still use the gym for games. Their architect will determine how many people can be in the gym due to exit requirements during tournaments. Check back Reviewed by: Steve Smith Date: February 16, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 4, 2015 41r IC v401,54,01,54 CITY OF COLLEGE STATION t "- Home of Texas A&M University" Co MEMORANDUM DATE: February 2, 2015 TO: Veronica Morgan, Mitchell & Morgan, LLP, via; v@mitchellandmorgan.com ✓ FROM: Jessica Bullock, Staff Planner SUBJECT: CSISD A&M CONSOLIDATED GYM EXPANSION (SP) Thank you for the submittal of your Site Plan - Commercial application. Kevin Ferrer, Graduate Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, February 16, 2015. If you have questions in the meantime, please feel free to contact us. PC: John Hall, College Station, Independent School District, via; jhallAcsisd.org Melissa Fleming, VLK Architects, via; mfleming@vlkarchitects.comv7 P&DS Project No. 15-00900029 Planning ti' Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •7 842 TFT 070 7(a 157() .FAY &)7() 7(. 2ugt.