Loading...
HomeMy WebLinkAboutMisc (2) SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Polo Estates Subdivision Engineer's Estimate of Street Construction ItemDescription 1 Unit EstimatedI 1 Quantity Unit Price Total Sitework&Pavement 1 Mobilization/Construction Staking LS 1 7,500.00 7,500 2 Site Preparation/Clearing and Grubbing AC 5 1,500.00 7,500 3 fTo soil Removal ---_._,_.. Topsoil &Replacement LS 1 6 000.00 6,000 4 Excavation/Gradin --- g - --- - - __ -LS 1 . . ..-.1,750.00 . .. -- 1,750 5 iMixmg&mco oration of lime'6"de SY .__ iP 8,476 2.20 18,647 6H --- ------.__ - � y drate d Lime(271b/sy) Ton 115 180.00 20 700 7 6"Crushed Limestone Base -- ._._. .----__.-_ _—._ _.. SY 7,557 11.00 83,127 8 t 2"Hot Mix Asphaltic Concrete _ SY 6,180 11.50 71,070 9 i Rock Ri ra p--___.. SY 205 40.00 8,200 10 Erosion Control Blanket SY 355 3.00 1,065 11 Seeding(edge of pavement to ROW&easements) SY 18,800 0.25 4,700 Sitework and Paving Subtotal $230,259 Drainage System 12 118"ADS HP Pipe-Structural Backfill LF 118 40.00 4,720 13 '24"ADS HP Pipe-Structural Backfill LF 54 50.00 2,700 _. 1--___ Grading 14 Drainage Channel Excavation and —_- - - LF �_ 599 8.00 4 792 15 -WPPP Implementation&Maintenance,Construction Exit LS 1 2,000.00 2,000 Drainage Subtotal $14,212 STREET ESTIMATED CONSTRUCTION TOTAL $244,4711 voxO c, �k »«» ».»»(�y.»,***tan * 4.*4.»3»»***4* w»,*** - 43.7' s F-12327 SCHULTZ ENGINEERING. LIC. SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Polo Estates Subdivision Engineer's Estimate of Waterline Construction Item Description Estimated p Unit ' Unit Price Total Quantity Water System 1 8"C900 Water Pipe-Non-Structural Backfill LF 1467 $241 $35,208 2 8"C900 Water Pipe-Structural Backfill LF 40 $28 $1,120 3 6"C900 Water Pipe-Non-Structural Backfill LF 829 $22 $18,238 4 Fire Hydrant Assembly(w/valve,vert.extension) EA 4 $3,250 $13,000 5 6"Tee-cut into existing line EA 2 $2,000 $4,000 6 8"x 8"M.J.Tee EA 1 $450 $450 7 8"x 6"M.J.Tee EA 3 $450 $1,350 8 6"x 6"M.J.Tee EA 1 $450 $450 9 8"x 6"M.J.Reducer EA 2 $450 $900 10 8"M.J.Gate Valve EA 4 $1,250 $5,000 11 6"M.J.Gate Valve EA 5 $950 $4,750 12 8" 11.25°M.J.Bend EA 2 $350 $700 13 8"22.5°M.J.Bend EA 3 $350 $1,050 14 8"45°M.J.Bend EA 9 $350 $3,150 14 6" 11.25°M.J.Bend EA 6 $275 $1,650 15 6"22.5°M.J.Bend EA I $275 $275 15 2"Blowoff Assembly EA 1 $1,250 $1,250 16 Connect to Existing Water Line EA 2 $2,500 $5,000 17 1"Water Service -long side EA 1 $850 $850 18 4"PVC Sleeves EA 5 $200 $1,000 19 16"PVC Sleeve EA 1 $500 $500 20 1.0"Water Service-short side EA 5 $1,300 $6,500 21 1.5"Water Service-short side EA 4 $1,300 $5,200 22 1.5"Water Service -long side EA 4 $1,500 $6,000 23 Waterline Testing LS I $1,000 $1,000 24 Meter Boxes i EA 22 $100; $2,200 ESTIMATED WATERLINE CONSTRUCTION', $120,791 OF .fir""**Nsts, 1110 *111W CHIA' *Il 65889 1 Pr 4- 5/ Y/ 5 SCHULTZ ountERiro. (LC. Page 1 of 1 WINN PROFESSIONAL ENGINEERS AND CONSTRUCTORS, LLC July 29, 2014 Mr. Stephen Cast Wellborn Special Utility District P.O. Box 250 Wellborn, Texas 77881 RE: Graham Rd. and South Dowling Rd. Proposed Subdivision Service Study Dear Stephen: The current KYPipe model for the Wellborn SUD Main System was used to perform a water service analysis for a proposed residential development located at the corner of Graham Rd. and South Dowling Rd. in the extraterritorial jurisdiction of College Station, Texas. According to a July 23, 2014 letter from the developer's engineer, the proposed residential development would serve 21 new connections within a 31.5 acre subdivision. Our analysis indicates that service is available for the proposed development to meet TCEQ requirements for residential use of 1.5 gpm per connection and a minimum residual pressure of 35 psi. Our analysis also indicates that service is available to provide the minimum fire flow requirements for the City of College Station. The City's fire flow requirements are to provide 1,000 gpm from two adjacent fire hydrants at a minimum operating pressure of 20 psi while supplying the maximum demand of 0.76 gpm per connection. Any dead end water lines within the proposed development providing supply to a fire hydrant need to be a minimum of 8" in diameter. Tie-in to the Wellborn SUD water system can be made at the existing 6" line along Graham Rd. If a fire hydrant is required to provide service to the proposed lots numbered 15 and 16, it can be placed on the existing Wellborn SUD 6" line along South Dowling Rd. or Graham Rd. We appreciate the opportunity to provide this information. Please do not hesitate to call if you have any questions or comments. Sincerely yours, Winn Professional Engineers & Constructors, LLC Texas Registered Firm No. F-7846 „, P-4 ••:t., • WALTER T.WINN, JR. 1-1‘(vl Walter T. i , Jr., RE. Principal WTW/pkw -7 141c • •. k:404146064619,,saleArai,s46,44c,:fru 11}-,CarAcp Ch teiy I ni-har 117701 d rig 505 Pation • P. 0. Box 2727 • Long-vim;Texas 75606 1. 903..553050() • f 903-553-0555 • wwwwinnpec.com