HomeMy WebLinkAboutMisc (2) SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Polo Estates Subdivision
Engineer's Estimate of Street Construction
ItemDescription 1 Unit EstimatedI
1 Quantity Unit Price Total
Sitework&Pavement
1 Mobilization/Construction Staking LS 1 7,500.00 7,500
2 Site Preparation/Clearing and Grubbing AC 5 1,500.00 7,500
3 fTo soil Removal ---_._,_..
Topsoil &Replacement LS 1 6 000.00 6,000
4 Excavation/Gradin
--- g - --- - - __ -LS 1 . . ..-.1,750.00 . .. -- 1,750
5 iMixmg&mco oration of lime'6"de SY .__
iP 8,476 2.20 18,647
6H --- ------.__ -
� y drate d Lime(271b/sy) Ton 115 180.00 20 700
7 6"Crushed Limestone Base -- ._._. .----__.-_ _—._ _..
SY 7,557 11.00 83,127
8 t 2"Hot Mix Asphaltic Concrete _ SY 6,180 11.50 71,070
9 i Rock Ri ra
p--___.. SY 205 40.00 8,200
10 Erosion Control Blanket SY 355 3.00 1,065
11 Seeding(edge of pavement to ROW&easements) SY 18,800 0.25 4,700
Sitework and Paving Subtotal $230,259
Drainage System
12 118"ADS HP Pipe-Structural Backfill LF 118 40.00 4,720
13 '24"ADS HP Pipe-Structural Backfill LF 54 50.00 2,700
_. 1--___ Grading
14 Drainage Channel Excavation and
—_- - - LF �_ 599 8.00 4 792
15 -WPPP Implementation&Maintenance,Construction Exit LS 1 2,000.00 2,000
Drainage Subtotal $14,212
STREET ESTIMATED CONSTRUCTION TOTAL $244,4711
voxO
c,
�k
»«» ».»»(�y.»,***tan
* 4.*4.»3»»***4* w»,*** -
43.7' s
F-12327
SCHULTZ ENGINEERING. LIC.
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Polo Estates Subdivision
Engineer's Estimate of Waterline Construction
Item Description Estimated
p Unit ' Unit Price Total
Quantity
Water System
1 8"C900 Water Pipe-Non-Structural Backfill LF 1467 $241 $35,208
2 8"C900 Water Pipe-Structural Backfill LF 40 $28 $1,120
3 6"C900 Water Pipe-Non-Structural Backfill LF 829 $22 $18,238
4 Fire Hydrant Assembly(w/valve,vert.extension) EA 4 $3,250 $13,000
5 6"Tee-cut into existing line EA 2 $2,000 $4,000
6 8"x 8"M.J.Tee EA 1 $450 $450
7 8"x 6"M.J.Tee EA 3 $450 $1,350
8 6"x 6"M.J.Tee EA 1 $450 $450
9 8"x 6"M.J.Reducer EA 2 $450 $900
10 8"M.J.Gate Valve EA 4 $1,250 $5,000
11 6"M.J.Gate Valve EA 5 $950 $4,750
12 8" 11.25°M.J.Bend EA 2 $350 $700
13 8"22.5°M.J.Bend EA 3 $350 $1,050
14 8"45°M.J.Bend EA 9 $350 $3,150
14 6" 11.25°M.J.Bend EA 6 $275 $1,650
15 6"22.5°M.J.Bend EA I $275 $275
15 2"Blowoff Assembly EA 1 $1,250 $1,250
16 Connect to Existing Water Line EA 2 $2,500 $5,000
17 1"Water Service -long side EA 1 $850 $850
18 4"PVC Sleeves EA 5 $200 $1,000
19 16"PVC Sleeve EA 1 $500 $500
20 1.0"Water Service-short side EA 5 $1,300 $6,500
21 1.5"Water Service-short side EA 4 $1,300 $5,200
22 1.5"Water Service -long side EA 4 $1,500 $6,000
23 Waterline Testing LS I $1,000 $1,000
24 Meter Boxes i EA 22 $100; $2,200
ESTIMATED WATERLINE CONSTRUCTION', $120,791
OF
.fir""**Nsts,
1110 *111W CHIA' *Il
65889 1
Pr
4- 5/ Y/ 5
SCHULTZ ountERiro. (LC.
Page 1 of 1
WINN PROFESSIONAL ENGINEERS
AND
CONSTRUCTORS, LLC
July 29, 2014
Mr. Stephen Cast
Wellborn Special Utility District
P.O. Box 250
Wellborn, Texas 77881
RE: Graham Rd. and South Dowling Rd. Proposed Subdivision Service Study
Dear Stephen:
The current KYPipe model for the Wellborn SUD Main System was used to perform a water
service analysis for a proposed residential development located at the corner of Graham Rd.
and South Dowling Rd. in the extraterritorial jurisdiction of College Station, Texas. According
to a July 23, 2014 letter from the developer's engineer, the proposed residential
development would serve 21 new connections within a 31.5 acre subdivision.
Our analysis indicates that service is available for the proposed development to meet TCEQ
requirements for residential use of 1.5 gpm per connection and a minimum residual pressure
of 35 psi. Our analysis also indicates that service is available to provide the minimum fire
flow requirements for the City of College Station. The City's fire flow requirements are to
provide 1,000 gpm from two adjacent fire hydrants at a minimum operating pressure of 20
psi while supplying the maximum demand of 0.76 gpm per connection. Any dead end water
lines within the proposed development providing supply to a fire hydrant need to be a
minimum of 8" in diameter. Tie-in to the Wellborn SUD water system can be made at the
existing 6" line along Graham Rd. If a fire hydrant is required to provide service to the
proposed lots numbered 15 and 16, it can be placed on the existing Wellborn SUD 6" line
along South Dowling Rd. or Graham Rd.
We appreciate the opportunity to provide this information. Please do not hesitate to call if
you have any questions or comments.
Sincerely yours,
Winn Professional Engineers & Constructors, LLC
Texas Registered Firm No. F-7846 „, P-4 ••:t.,
• WALTER T.WINN, JR.
1-1‘(vl
Walter T. i , Jr., RE.
Principal
WTW/pkw -7 141c
• •. k:404146064619,,saleArai,s46,44c,:fru 11}-,CarAcp Ch teiy I ni-har 117701 d rig
505 Pation • P. 0. Box 2727 • Long-vim;Texas 75606