HomeMy WebLinkAboutStaff Review YO(ok, n cirNecx_ (ods • V-t,0.11. Ct vsWicuLd RESPONSE TO STAFF REVIEW COMMENTS NO. 1 Project: Polo Estates (FP-Replat) (15-00900027) PLANNING .. 1. Meets and bounds do not close, please revise. A call was missing on the northwest boundary line. It has been added to the Final LL Plat. V . Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with this plat. 3.5' of right-of-way was added to the tract. In addition, 3.5' of pue was added to the lots so that there is a total of 20'of PUE. A . Please project a public street to the unplatted lots to the south, east, and west with a 70-foot right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac does not break block length. A street was extended to the south. A waiver is being requested for block length and street extensions to the east and west. 4. The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot exceed cannot exceed 750 feet in length. The alignment of the subdivision streets changed so that the cul-de-sac is less than 750 feet. (ynok,ber to e t S `74 a . iSµcLuet LA.Ad nD toTo A Ct (A. Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots 13-17 should be revised to meet the requirement of 100-foot lot width as measured at the street. All cul-de-sac lots meet the 75'width and all other lots are 100'in width. 6. Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall be substantially right angles. The lots are "substantially"at right angles in our opinion. (.O4 5) lot 13 ,or i S•i(o f- 7. 'Parkland in the amount of $26,481 ($1261x21) will be due upon filing of the final plat. Noted. FYI, there are 22 lots on this Final Plat. With there being 1 lot in the Foxworth Subdivision already, only 21 are being added so $1261x21 should be the amount due. t.-)Ot 05 ea j5 retsot e rw,cu ea_ - - ,.,b ..•� ,/ 8. Please move the Certificate of the County Clerk to the �ther side of sheet two with the other certifications. The certificate of the county clerk has been moved. 7 9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning Commission. The certificate of City Planner has been removed and the certificate of planning and zoning commission has been added. ✓10. The building setback identified in note 15 are different from building setbacks on the original plat. Please confirm that this is current standards. Note 15 has been revised to match the original plat. A 1. All structures will need to be removed prior to the filing of the plat. Noted. „1.2. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. ✓13. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. gore t$ Noted. woo(.31- L �� [Of- « It- Nf N'� ru� S ' c,1u be yP/ e do 1.�, 1 ,(�'^` . 001-e O- GS 150 14. County comments are still being worked on and will follow. Noted. ENGINEERING COMMENTS NO. 1 1. Add a note on the Replat stating whose responsibility it is to maintain, and stating that fences, grading, and landscape cannot impede the flow of the private drainage easement. Note 17 was added to the plat. 2. Add a note on the Replat and construction documents regarding requirement for compaction of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots that would require this. Note 19 was added to the plat. There isn't any grading proposed on the lots near the buildable area of the future homes. Therefore, we cannot tell which lots are going to require greater than 2 feet of fill. The note was left as a general statement to include any lots that require greater than 2 feet of fill. 3. Add a note on the Replat stating that the proposed lots can't be located further than 500' from a fire hydrants which is based on the lay of the hose along the street. Note 20 was added to the final plat. 4. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision appears to be not located on that map. Note revised. 5. Cul-de sac's length is exceeding the allowed length in the UDO. The alignment of the subdivision streets has been revised so that the cul-de-sac is less than 750. 6. Please provide a private drainage easement for the estimated 100-year storm & the creek. Please show this on the Replat & Construction documents. A private drainage easement is shown on the plat and the construction plans. 7. Change construction note #6 regarding Wickson SUD to Wellborn SUD. Note 6 has been revised. 8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an easement? If it does please show it on the Replat. It is going to be removed. 9. Please increase the symbol size for hydrants and gate valves on the overall plan. The symbol size was changed on the overall plan. 10. Adjust Mallet Way grade at intersection with North Graham Road to have no more than plus or minus 2% grade. The Grade was changed. 11. Provide horizontal curves for Mallet Way. Horizontal curves are provided for Mallet Way. —alignment has been revised 12. Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No. 1. All of the Rock Rip Rap is now in a private drainage easement. 13. Provide erosional control measurements such as silt fences, hay bales, etc. Silt fence is provided. It is shown on the Overall plan. In addition, erosion control blankets are proposed. 14. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing currently exceeds 800'. The alignment of the Waterlines changed, but the gate valve spacing is less than 800' on the new layout. 15. Provide additional easement on lot 14, or realign the waterline W-2 in such a way that there's at least 5.5' clearance between the waterline's centerline & edge of PUE. FOR OFFICE USE ONLY CASE NO.: I ✓ c'7 DATE SUBMITTED: ' I� TIME: CITY OF COLLEGE STATION Home of Texas A6111 University' STAFF: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. n New Project Submittal Incomplete Project Submittal -documents needed to complete an application. Case No.: IXI Existing Project Submittal. Case No.: (15-00900027) Project Name Polo Estates (FP-REPLAT) Contact Name Phone Number We are transmitting the following for Planning & Development Services to review and comment (check all that apply): Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards Rezoning Application n Irrigation Plan Conditional Use Permit Variance Request ❑ Preliminary Plan Development Permit n Final Plat n Development Exaction Appeal Development Plat n FEMA CLOMA/CLOMR/LOMA/LOMR Site Plan n Grading Plan Special District Site Plan n Other- Please specify below — Special District Building /Sign n Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Comprehensive Plan Amendment n Waterline Construction Documents ❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents TxDOT Utility Permit x Street Construction Documents [1 Drainage Letter or Report ❑ Easement Application ❑x Fire Flow Analysis H Other- Please specify Special Instructions: 10/10 [ Print Form Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 April 3, 2015 Jessica Bullock Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Polo Estates (FP-REPLAT) - (15-00900027) Dear Ms. Bullock: Attached are the following items for the project referenced above: • One (1) 24" x 36" copy of the revised Final Plat • One(1) set of the revised construction documents • One(1) copy of the Engineer's Estimate • One(1) copy of the revised Drainage Report • One(1) copy of the Water Report • Revised Final Plat Application • Waiver Request • Response to Staff Comments If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. I Joeichultz, P.E. M. ager/Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com RESPONSE TO STAFF REVIEW COMMENTS NO. 1 Project: Polo Estates (FP-Replat) (15-00900027) PLANNING 1. Meets and bounds do not close, please revise. A call was missing on the northwest boundary line. It has been added to the Final Plat. 2. Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with this plat. 3.5'of right-of-way was added to the tract. In addition, 3.5' of pue was added to the lots so that there is a total of 20' of PUE. 3. Please project a public street to the unplatted lots to the south, east, and west with a 70-foot right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac does not break block length. A street was extended to the south. A waiver is being requested for block length and street extensions to the east and west. 4. The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot exceed cannot exceed 750 feet in length. The alignment of the subdivision streets changed so that the cul-de-sac is less than 750 feet. 5. Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots 13-17 should be revised to meet the requirement of 100-foot lot width as measured at the street. All cul-de-sac lots meet the 75' width and all other lots are 100'in width. 6. Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall be substantially right angles. The lots are "substantially"at right angles in our opinion. 7. Parkland in the amount of$26,481 ($1261x21) will be due upon filing of the final plat. Noted. FYI, there are 22 lots on this Final Plat. With there being 1 lot in the Foxworth Subdivision already, only 21 are being added so $1261x21 should be the amount due. 8. Please move the Certificate of the County Clerk to the other side of sheet two with the other certifications. The certificate of the county clerk has been moved. 9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning Commission. The certificate of City Planner has been removed and the certificate of planning and zoning commission has been added. 10. The building setback identified in note 15 are different from building setbacks on the original plat. Please confirm that this is current standards. Note 15 has been revised to match the original plat. 11. All structures will need to be removed prior to the filing of the plat. Noted. 12. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. Noted. 13. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. Noted. 14. County comments are still being worked on and will follow. Noted. ENGINEERING COMMENTS NO. 1 ! Add a note on the Replat stating whose responsibility it is to maintain, and stating that fences, grading, and landscape cannot impede the flow of the private drainage easement. Note 17 was added to the plat. 7 Add a note on the Replat and construction documents regarding requirement for compaction of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots that would require this. Note 19 was added to the plat. There isn't any grading proposed on the lots near the buildable area of the future homes. Therefore, we cannot tell which lots are going to require greater than 2 feet of fill. The note was left as a general statement to include any lots that require greater than 2 feet of fill. / Add a note on the Replat stating that the proposed lots can't be located further than 500' from a fire hydrants which is based on the lay of the hose along the street. Note 20 was added to the final plat. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision appears to be not located on that map. Note revised. l5' Cul-de sac's length is exceeding the allowed length in the UDO. The alignment of the subdivision streets has been revised so that the cul-de-sac is less than 750. X Please provide a private drainage easement for the estimated 100-year storm & the creek. Please show this on the Replat & Construction documents. A private drainage easement is shown on the plat and the construction plans. 7 Change construction note #6 regarding Wickson SUD to Wellborn SUD. Note 6 has been revised. 8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an easement? If it does please show it on the Replat. It is going to be removed. ,2 Please increase the symbol size for hydrants and gate valves on the overall plan. The symbol size was changed on the overall plan. Adjust Mallet Way grade at intersection with North Graham Road to have no more than plus or minus 2% grade. The Grade was changed. Provide horizontal curves for Mallet Way. Horizontal curves are provided for Mallet Way. —alignment has been revised YL• Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No. 1. All of the Rock Rip Rap is now in a private drainage easement. Provide erosional control measurements such as silt fences, hay bales, etc. Silt fence is provided. It is shown on the Overall plan. In addition, erosion control blankets are proposed. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing currently exceeds 800'. The alignment of the Waterlines changed, but the gate valve spacing is less than 800'on the new layout. 3157. Provide additional easement on lot 14, or realign the waterline W-2 in such a way that there's at least 5.5' clearance between the waterline's centerline & edge of PUE. The alignment of the Waterlines changed, and now the waterline has adequate spacing from the edge of the PUE. )4. Please verify and place a note on plans that water services will be left between 2 & 3 feet deep at the point of terminus by developer's contractor. ,22 Note 9 was added to the water sheets. X/. According to the letter address to Stephen Cast, Fire hydrants need to be connected via 8" lines. What's the reason for connecting Fire hydrant No. 2 to only a 6" line? A complete water report is attached to this submittal. ),8'. Please provide a written correspondence with Wellborn SUD regarding the 1700' dead end line. The water line is now looped and is extended to the adjacent property so that it can be looped in the future. 14. Please provide a Water system report. A water report is attached to this submittal. ?X. Please change Primary Drainage Facility to Hopes Creek & Firm panel # to 48041C0325E in the General description of the drainage report. The drainage report has been revised. A copy of the revised drainage report is included in this submittal. I. Provide sealed engineer cost estimate, erosion control details. A sealed engineer cost estimate is included in this submittal. ADDRESSING 11. Please change Mallet Way to Mallet Court. The street name should be continuous. The street alignments changed. SANITATION 11. Sanitation is ok with this project. Noted. i ter) (*ffill1114 CITY OF COLLEGE STATION Home of Texas Ae.M University' MEMORANDUM DATE: February 18, 2015 TO: Louis A. Malechek, Ill, via; malechek[a�thepaynelawgroup.com / FROM: Jessica Bullock, Staff Planner SUBJECT: POLO ESTATES (FP-REPLAT) Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24"x36" copy of the revised final plat; One (1) set of revised construction documents; Parkland Dedication in the amount of $$26,481 must be submitted prior to the filing of the final plat; Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.qov/pz Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84verizon.net vi P&DS Project No. 15-00900027 Planning 6 Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 cstx.govld evservi ces 1. 0 STAFF REVIEW COMMENTS NO. 1 Project: Polo Estates (FP-Replat) (15-00900027) PLANNING 1. Meets and bounds do not close, please revise. 2. Right-of-way on N. Graham should be 77'. Half of the deficiency should be dedicated with this plat. 3. Please project a public street to the unplatted lots to the south, east, and west with a 70-foot right-of-way. As proposed the block length currently exceeds 1500 feet as the cul-de-sac does not break block length. 4. The proposed Mallet Court and Mallet Way all count as a cul-de-sac. The cul-de-sac cannot exceed cannot exceed 750 feet in length. 5. Lots around cul-de-sacs need to meet the 75-foot lot width as measured at the street. Lots 13-17 should be revised to meet the requirement of 100-foot lot width as measured at the street, 6. Lots platted adjacent to straight right of way (S. Dowling, Mallet Way, and Mallet Court) shall be substantially right angles. 7. Parkland in the amount of$26,481 ($1261x21) will be due upon filing of the final plat. 8. Please move the Certificate of the County Clerk to the other side of sheet two with the other certifications. 9. Please remove the Certificate of City Planner and add Certificate of Planning and Zoning Commission. 10. The building setback identified in note 15 are different from building setbacks on the original plat. Please confirm that this is current standards. 11. All structures will need to be removed prior to the filing of the plat. 12. Please note that you may be required to submit paid tax certificates if they are not current prior to the filing of your plat. 13. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. 14. County comments are still being worked on and will follow. Reviewed by: Jessica Bullock Date: February 16, 2015 ENGINEERING COMMENTS NO. 1 1. Add a note on the Replat stating whose responsibility it is to maintain, and stating that fences, grading, and landscape cannot impede the flow of the private drainage easement. 2. Add a note on the Replat and construction documents regarding requirement for compaction of fill or engineered slab for affected lots that have greater than 2 feet of fill. Also list the lots that would require this. 3. Add a note on the Replat stating that the proposed lots can't be located further than 500' from a fire hydrants which is based on the lay of the hose along the street. 4. Remove FEMA Map with ending numbers, 375-E, from the Replat note. Subdivision appears to be not located on that map. 5. Cul-de sac's length is exceeding the allowed length in the UDO. 6. Please provide a private drainage easement for the estimated 100-year storm & the creek. Please show this on the Replat & Construction documents. 7. Change construction note #6 regarding Wickson SUD to Wellborn SUD. 0 8. Is the Overhead electric line a BTU line that is to remain or be relocated? Does it have an easement? If it does please show it on the Replat. 9. Please increase the symbol size for hydrants and gate valves on the overall plan. 10. Adjust Mallet Way grade at intersection with North Graham Road to have no more than plus or minus 2% grade. 11. Provide horizontal curves for Mallet Way. 12. Entire Rock Rip Rap needs to be in a private drainage easement. See Chanel No. 1. 13. Provide erosional control measurements such as silt fences, hay bales, etc. 14. Provide an additional gate valve between Fire hydrant No 1 & 2. The gate valve spacing currently exceeds 800'. 15. Provide additional easement on lot 14, or realign the waterline W-2 in such a way that there's at least 5.5' clearance between the waterline's centerline & edge of PUE. 16. Please verify and place a note on plans that water services will be left between 2 & 3 feet deep at the point of terminus by developer's contractor. 17. According to the letter address to Stephen Cast, Fire hydrants need to be connected via 8" lines. What's the reason for connecting Fire hydrant No. 2 to only a 6" line? 18. Please provide a written correspondence with Wellborn SUD regarding the 1700' dead end line. 19. Please provide a Water system report. 20. Please change Primary Drainage Facility to Hopes Creek & Firm panel # to 48041C0325E in the General description of the drainage report. 21. Provide sealed engineer cost estimate, erosion control details. Reviewed by: Kevin Ferrer Date: February 16, 2015 ADDRESSING 1. Please change Mallet Way to Mallet Court. The street name should be continuous. Reviewed by: Robin Krause, Permit Technician Date: February 4, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: February 4, 2015 Grffia4 CITY OF COLLEGE STATION Home of Texas A&M University* MEMORANDUM DATE: February 2, 2015 TO: Louis A. Malecheck, Ill, via; malecheck@thepaynelawgroup.com V FROM: Jessica Bullock, Staff Planner SUBJECT: POLO ESTATES (FP-REPLAT) Thank you for the submittal of your Final Plat - Residential application. Kevin Ferrer, Graduate Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, February 16, 2015. If you have questions in the meantime, please feel free to contact us. PC: Joe Schultz, Schultz Engineering, LLC, via; joeschultz84( verizon.net v P&DS Project No. 15-00900027 Planning&Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE•COLLEGE STATION •TEXAS •77842 TEL.979.764.357(( •FAX. 979.764.3496 Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 January 16, 2015 Alan Gibbs, P.E. City Engineer Development Services City of College Station College Station, Texas RE: Letter Acknowledging City Standards—Polo Estates, Brazos County, Texas Dear Mr. Gibbs: The purpose of this letter is to acknowledge that the construction plans for the water line, roadway and drainage construction for the above-referenced project, to the best of my knowledge, do not deviate from the B/CS Design Guideline Manual. incer- y, seph P. Schultz, P.E. Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com