Loading...
HomeMy WebLinkAboutStaff Review 4.r. CITY OF COLLEGE STATION Home of Texas A&M University' MEMORANDUM k\)\ DATE: February 16, 2015 l� TO: Steve Duncan, via; sduncanta7ionescaccom FROM: Rachel Lazo, Planning Technician SUBJECT: PARKWAY BAPTIST PORTABLE ADDITION (SP) Staff reviewed the above-mentioned Site Plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) set of site civil construction documents for the proposed development; Two (2) 24"x36" revised site plans; One (1) 24"x36" grading and erosion control plan; Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please contact Rachel Lazo at (979) 764-3570. Attachments: Staff Review Comments PC: P&DS Project No. 15-00900021 Planning etr Development Services P.O. BOX 9960 • 1101 ERAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.3570 •FAX. 979.764.3496 cstx.govtd evservices (Iirr4 CITY OF COLLEGE STATION Home of Texas A&M University' MEMORANDUM DATE: January 27, 2015 TO: Steve Duncan, via; sduncanAjonescarter.com FROM: Rachel Lazo, Planning Technician SUBJECT: PARKWAY BAPTIST PORTABLE ADDITION (SP) 17-- Thank SP) V/Thank you for the submittal of your Site Plan - Commercial application. Kevin Ferrer, Graduate Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Tuesday, February 10, 2015. If you have questions in the meantime, please feel free to contact us. PC: P&DS Project No. 15-00900021 / Planning er Development Services P.O.BOX 9960 • I I01 TEXAS AVENUE•COLLEGE STATION •TEXAS •77841 TrT ')7Q 7Aa ;S-1) •FAX 979.7(4.3496 0 STAFF REVIEW COMMENTS NO. 1 Project: Parkway Baptist Portable Addition (Sp) 15-00900021 PLANNING 1. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Rachel Lazo Date: February 13, 2015 ENGINEERING COMMENTS NO. 1 1. Check the scale of the plans, they don't correspond with each other. 2. The proposed waterline through parkland is not a viable option. Please look into alternative option to provide an additional fire hydrant 3. Provide a legend for the different line types on the Hydrant Extension sheet. 4. Use FIRM panel 48041C0305F Dated 4/2/2014 when determining if property is in floodplain. 5. Bee Creek is in Detention required area. Please provide a drainage report or address this issue that these incremental impervious covers are meeting the B/CS guidelines. 6. Plans need to be sealed. 7. Provide a sealed cost estimate, erosion control plan, grading plan, Fire Flow report, B/CS standard details. Reviewed by: Kevin Ferrer Date: February 10, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 29, 2015