HomeMy WebLinkAboutStaff Review 4.r.
CITY OF COLLEGE STATION
Home of Texas A&M University'
MEMORANDUM k\)\
DATE: February 16, 2015 l�
TO: Steve Duncan, via; sduncanta7ionescaccom
FROM: Rachel Lazo, Planning Technician
SUBJECT: PARKWAY BAPTIST PORTABLE ADDITION (SP)
Staff reviewed the above-mentioned Site Plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
City of College Station Transmittal Letter;
Memo providing written responses to all of staff's comments (identify the specific
page that each comment was addressed on or the reason for not addressing the
comment);
One (1) set of site civil construction documents for the proposed development;
Two (2) 24"x36" revised site plans;
One (1) 24"x36" grading and erosion control plan;
Please note that this application will expire in 90 days from the date of this memo, if the
applicant has not provided written response comments and revised documents to the
Administrator that seek to address the staff review comments contained herein. If there are
comments that you are not addressing with the revised site plan, please attach a letter
explaining the details. If you have any questions or need additional information, please contact
Rachel Lazo at (979) 764-3570.
Attachments: Staff Review Comments
PC: P&DS Project No. 15-00900021
Planning etr Development Services
P.O. BOX 9960 • 1101 ERAS AVENUE •COLLEGE STATION •TEXAS •77842
TEL.979.764.3570 •FAX. 979.764.3496
cstx.govtd evservices
(Iirr4
CITY OF COLLEGE STATION
Home of Texas A&M University'
MEMORANDUM
DATE: January 27, 2015
TO: Steve Duncan, via; sduncanAjonescarter.com
FROM: Rachel Lazo, Planning Technician
SUBJECT: PARKWAY BAPTIST PORTABLE ADDITION (SP) 17--
Thank
SP) V/Thank you for the submittal of your Site Plan - Commercial application. Kevin Ferrer, Graduate
Engineer, and I have been assigned to review this project. It is anticipated that the review will be
completed and any staff comments returned to you on or before Tuesday, February 10, 2015. If
you have questions in the meantime, please feel free to contact us.
PC:
P&DS Project No. 15-00900021 /
Planning er Development Services
P.O.BOX 9960 • I I01 TEXAS AVENUE•COLLEGE STATION •TEXAS •77841
TrT ')7Q 7Aa ;S-1) •FAX 979.7(4.3496
0
STAFF REVIEW COMMENTS NO. 1
Project: Parkway Baptist Portable Addition (Sp) 15-00900021
PLANNING
1. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
Reviewed by: Rachel Lazo Date: February 13, 2015
ENGINEERING COMMENTS NO. 1
1. Check the scale of the plans, they don't correspond with each other.
2. The proposed waterline through parkland is not a viable option. Please look into
alternative option to provide an additional fire hydrant
3. Provide a legend for the different line types on the Hydrant Extension sheet.
4. Use FIRM panel 48041C0305F Dated 4/2/2014 when determining if property is in
floodplain.
5. Bee Creek is in Detention required area. Please provide a drainage report or
address this issue that these incremental impervious covers are meeting the
B/CS guidelines.
6. Plans need to be sealed.
7. Provide a sealed cost estimate, erosion control plan, grading plan, Fire Flow
report, B/CS standard details.
Reviewed by: Kevin Ferrer Date: February 10, 2015
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: January 29, 2015