Loading...
HomeMy WebLinkAboutStaff Review t CITY OF COL J GE STATION Home of Texas A&M University' MEMORANDUM 0.}0 DATE: March 3, 2015 e TO: Veronica Morgan, Mitchell & Morgan, LLP, via; vmitchellandmorgan.com V FROM: Mark Bombek, Staff Planner SUBJECT: RIO GRANDE TOWNHOMES (PP) Staff reviewed the above-mentioned preliminary plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and to be scheduled for a future Planning & Zoning Commission meeting: One (1) 24" x 36" copy of the revised Preliminary Plan; and Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/pz If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Unisource Real Estate Investments, LLC, via; sultan.mahmoodsbc/cilobal.net v.- Kamal Texas Business Exchange, via; kamal(c�texasbizx.com \vf P&DS Project No. 15-00900040 Planning&Development Services P.O.BOX 9960 • 1101"TEXAS AVENUE•COLLEGE STATION •TEXAS •77842 TEL.979.764.3570•FAX. 979.764.3496 STAFF REVIEW COMMENTS NO. 1 Project: RIO GRANDE TOWNHOMES (PP) — (15-00900040) PLANNING 1. The waivers requested with this application cannot be addressed as a waiver to the Subdivision Regulations as those requirements are tied to the dimensional standards under section 5 of the Unified Development Ordinance. A variance to the setbacks would not need to be addressed until the project is ready to acquire a building permit. However, the lot size variance would need be approved by the Zoning Board of Adjustment before any approval of a Final Plat. 2. Please provide a revised application with the waiver requests removed. Once resubmitted appropriate refunds will be processed for the initial waiver request. 3. Sidewalks are required for this development along all streets within the development except for alleys and the bulb of the cul-de-sac. Please show the sidewalk layout on the Preliminary Plan. 4. Please provide the cross access easements for all private drives crossing lot lines. 5. Please also provide a note on the plan that all private access easements and common areas related to the development are going to be owned and maintained by the Homeowners Association. 6. What residential parking options are being used for the purposes of this plan? These options should also be noted on the Plan as a general note. 7. Please provide locations and screening of all proposed dumpsters serving the development. 8. There is what appears to be a visitor parking area incorporated into lot 16 of Block 4. All visitor parking must be placed in separate lots noted as common area. 9. Being a Preliminary Plan, structures are not required to be included on the site layout. Please remove all building footprints. Also, is it possible to take all of the lot dimensions from sheet 2 and consolidate it to just have sheet 1? 10.Please change Zoning for the property to state `Townhouse' instead of Townhome. 11. In the Title block please change the word `Plat' to `Plan' 12.FYI...Parkland Dedication at a rate of $1,636 per residential lot will be required to be paid prior to filing the Final Plat. 13.Please add a general note that each lot will provide a minimum of two (2) trees of at least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No. 3222. Reviewed by: MARK BOMBEK Date: 02-25-2015 NOTE: Any changes made to the plans which have not been requested by the City of College Station, must be explained in your next transmittal letter. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. 2ura 0 ENGINEERING COMMENTS NO. 1 1. Is there a reason that the private alley at the rear of Block 4 does not connect between Lots 27 and 28? 2. Also, please provide a 20 ft. public utility easement at the rear of all lots that do not contain an alley. Specifically Lots 2-41 of Block 4 3. Please show 10' Public Utility Easements along the rear of the lots. 4. There is an existing fire hydrant shown in the road where Big River Street is connecting to the existing access road. Please add a note that the existing fire hydrant, will be removed and replaced. Reviewed by: Danielle Singh Date: 3/02/15 TxDOT COMMENTS 1. Proposed access is sufficient for meeting the TxDOT Access Management Manual guidelines for distance between intersection and or access points. Also include a right turn deceleration lane and a provision for cross access easement at the southwest property line. Before access can be approved these revisions must be implemented into the property's proposed plan and commercial access request. Please revise request and resubmit. Reviewed by: Vincent Espinoza Date: 02-20-2015 FIRE 1) No comments at this time Reviewed by: Steve Smith Date: 02/25/2015 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: sweido(a�cstx.cgov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 3or4 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 2.17.15 SANITATION 1. Need to discuss garbage type services. Reviewed by: Wally Urrutia Date: 02-19-2015 ADDRESSING 1. Addresses for this project will be verified and distributed after the final plat has been approved and filed at the Brazos County Courthouse. 2. The proposed street names have been preliminarily approved and will be re-verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County. Reviewed by: Robin Krause, Address Technician Date: 02-20-2015 4ot4 CITY OF COLLEGE STATION ~ Home ofTexasA&M University°' MEMORANDUM DATE: February 17, 2015 TO: Veronica Morgan, Mitchell & Morgan, LLP, via; v@mitchellandmorgan.com FROM: Mark Bombek, Staff Planner SUBJECT: RIO GRANDE TOWNHOMES (PP) Thank you for the submittal of your Preliminary Plan application. Danielle Singh and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, March 2, 2015. If you have questions in the meantime, please feel free to contact us. PC: Unisource Real Estate Investments, LLC, via; sultan.mahmoodas, bcglobal.net Kamal Texas Business Exchange, via; km_aal@texasbizx.com \ P&DS Project No. 15-00900040 Planning d.Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STA['JON •TEXAS •77842 Tr'T Cn n 7/_A I C I\ r A V '2!I ^1 A 2 ..12 MITCHELL/R MM MORGAN Mark Bombek April 8, 2015 City of College Station P.O. Box 9960 College Station, Texas 77842 RE: RIO GRANDE TOWNHOMES (PP) Dear Mark, Attached please find the following: • One (1) 24"x36" copy of the revised Preliminary Plan; • Preliminary Layout (for reference purpose only); and • A revised Preliminary Plan Application. STAFF REVIEW COMMENTS NO. 1 Project: RIO GRANDE TOWNHOMES (PP) — (15-00900040) PLANNING 1. The waivers requested with this application cannot be addressed as a waiver to the Subdivision Regulations as those requirements are tied to the dimensional standards under section 5 of the Unified Development Ordinance. A variance to the setbacks would not need to be addressed until the project is ready to acquire a building permit. However, the lot size variance would need be approved by the Zoning Board of Adjustment before any approval of a Final Plat. Response: Understood. We have modified the preliminary plan and this comment is no longer applicable. 0 Please provide a revised application with the waiver requests removed. Once resubmitted appropriate refunds will be processed for the initial waiver request. Response: Understood. Please see attached for the revised application. 3. Sidewalks are required for this development along all streets within the development except for alleys and the bulb of the cul-de-sac. Please show the sidewalk layout on the Preliminary Plan. Response: These sidewalks have been added. 1 3204 EARL RUDDER FWY.S. • COLLEGE STATION,TX 77845 • T 979.260.6963 • F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmoraan.com • www.mitchellandmoraan.com 4. Please provide the cross access easements for all private drives crossing lot lines. Response: Cross access easements have been added. 5. Please also provide a note on the plan that all private access easements and common areas related to the development are going to be owned and maintained by the Homeowners Association. Response: This note has been added as Note #6. 6. What residential parking options are being used for the purposes of this plan? These options should also be noted on the Plan as a general note. Response: This note has been added as Note #7. -r \--r.. _otA-T /7. Please provide locations and screening of all proposed dumpsters serving the development • Response: Dumpster pad locations have been added to the preliminary plan. ,' There is what appears to be a visitor parking area incorporated into lot 16 of Block 4. All visitor parking must be placed in separate lots noted as common area. Response: This lot has now been designated as a common area for parking. 9. Being a Preliminary Plan, structures are not required to be included on the site layout. Please remove all building footprints. Also, is it possible to take all of the lot dimensions from sheet 2 and consolidate it to just have sheet 1? Response: We have removed these layouts but are providing you a separate sheet to review. Xi. Please change Zoning for the property to state 'Townhouse' instead of Townhome. Response: The zoning for the property has been revised. 11. In the Title block please change the word 'Plat' to `Plan' Response: The title block has been revised. 1,2. FYI...Parkland Dedication at a rate of $1,636 per residential lot will be required to be paid prior to filing the Final Plat. Response: Understood. p. Please add a general note that each lot will provide a minimum of two (2) trees of at least two inches (2") in caliper or one (1) tree of four inch (4") caliper per Ordinance No. 3222. Response: This note has been added as Note #8. 2 ENGINEERING COMMENTS NO. 1 1. Is there a reason that the private alley at the rear of Block 4 does not connect between Lots 27 and 28? Response: Originally this could not be connected because of the ROW location. It now fits given the shift in layout needed to address planning comment #1 so we have added the connection. NOTE: THE FOLLOWING 2 COMMENTS WERE REVISED BASED UPON AN EMAIL FROM MARK BOMBEK TO VERONICA MORGAN ON 3-10-15. 2. Also, please provide a 20 ft. access easement centered on the alley. Response: A 20ft access easement has been provided centered on the alley. 3. Please show 10' Public Utility Easements along the rear of the lots. Response: A 10ft PUE has been added to the rear of the lots. 4. There is an existing fire hydrant shown in the road where Big River Street is connecting to the existing access road. Please add a note that the existing fire hydrant, will be removed and replaced. Response: A note has been added noting the fire hydrant will be relocated. TxDOT COMMENTS 1. Proposed access is sufficient for meeting the TxDOT Access Management Manual guidelines for distance between intersection and or access points. Also include a right turn deceleration lane and a provision for cross access easement at the southwest property line. Before access can be approved these revisions must be implemented into the property's proposed plan and commercial access request. Please revise request and resubmit. Response: Understood. We have added the deceleration lane to the plan as requested. Construction drawings for this deceleration lane will be forthcoming. FIRE 1. No comments at this time Response: Thank you. 3 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: sweido(a�cstx.gov Response: Understood. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Response: Understood. 3. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. Response: Understood. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. Response: Understood. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Response: Understood. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. Response: Understood. 2. CSU will provide drawings for electrical installation. Response: Understood. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. Response: Understood. 4 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Response: Understood. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Response: Understood. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. Response: Understood. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. Response: Understood. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. Response: Understood. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Response: Thank you. SANITATION 1. Need to discuss garbage type services. Response: We are providing nine (9) 10' x 10' concrete pads to be used with the 300- gallon containers. The concrete pads will be screened using 6' high wood fences on three sides (no gates). 5 ADDRESSING 1. Addresses for this project will be verified and distributed after the final plat has been approved and filed at the Brazos County Courthouse. Response: Understood. 2. The proposed street names have been preliminarily approved and will be re-verified prior to filing any plats to ensure no duplicate street names are being created within Brazos County. Response: Understood. If you have any questions or comments, please feel free to call our office at 979-260-6963 erely, 1 Veronica J.i�Mo n, P.E., C.F.M. Managing 'artne cc: File 6