HomeMy WebLinkAboutStaff Comments * ,e) CITY OF COLLEGE STATION , max... „ :.w. Home of Texas A&M Universisf MEMORANDUM DATE: March 18, 2015 TO: Keller Webster/Gary Daily, KWA Construction, via; gdaily©kwaconstruction.com ,,/ FROM: Jessica Bullock, Staff Planner SUBJECT: SECOND STREET APTS (PIP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, DATE, at 10:00 a.m. for further staff review: Two (2) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached. OR Two (2) revised site and landscaping plans. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: CS Second Street Apartments II, LLC, via; therbelin@newschooladv.com V P&DS Project No. 15-00900046 Planning 6'Development Services P.O.BOX 9960 • 1.101 TEXAS AVENUE •COLLEGE S IA FION •TEXAS •77842 TEL.979.764.3570•FAX.. 979.764.3496 STAFF REVIEW COMMENTS Project: SECOND STREET APTS (PIP) - 15-00900046 PLANNING 1. The note requested under Transportation comments should also be placed on the landscape plan. 2. Just a reminder to ensure the landscape plan for the PIP and the Site Plan Application should show the same information. 3. Any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. Reviewed by: Jessica Bullock Date: 3/17/15 ENGINEERING COMMENTS NO. 1 1. The existing 6-inch and 8-inch waterlines that are being relocated should be labeled as such rather than being labeled "proposed." 2. Clearly label the private storm infrastructure, benches, trees, irrigation, etc. as "private." 3. Erosion & Sediment Control Notes and details are not necessary on the PIP. 4. Please dimension the location of all private improvements from the back of curb or edge of the right-of-way. 5. Per application, please provide a Signage Plan and Engineer's Cost Estimate for the removal of all private infrastructure. 6. FYI...Surety will be required for the removal of the private infrastructure prior to approval of the PIP or Site Plan. Landscape and irrigation removal is typically a flat $50 fee, but all other items need to be estimated. Reviewed by: Erika Bridges Date: 3/12/15 TRANSPORTATION 1. The trees located within 30' of intersections of Cherry/Boyett and Cherry/Second Street may block the stop signs. Please add a note stating that these trees need to be trimmed so the lowest branches start at a height of 9'. Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 3/18/15 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure as designed by CSU. 2. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU, as shown on plat or site plan. 3. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 4. Three decorative streetlights required for this project. Contact CSU Electric for decorative streetlight requirements. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 6. Developer installs pull boxes per CSU specs and design, Pull boxes provided by CSU. 7. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 8. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 2/17/15 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: 2/19/15 Lir (*. CITY OF COLLEGE STATION Home of 7exas A&M University' MEMORANDUM Up DATE: February 17, 2015 TO: Keller Webster/Gary Daily, KWA Construction, via; gdaily(7a,kwaconstruction.com FROM: Jessica Bullock, Staff Planner SUBJECT: SECOND STREET APTS (PIP) Thank you for the submittal of your Private Improvement in Public Right-of-Way Permit (PIP) application. Erika Bridges, Graduate Engineer II, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, March 2, 2015. If you have questions in the meantime, please feel free to contact us PC: CS Second Street Apartments II, LLC, via; therbelin(a�newschooladv.com V P&DS Project No. 15-00900046 Planning 6'Development Services P.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE STATION •TEXAS •77842 TEL.979.764.357(1 •FAX. 979.764.3496 c s tx.eovld evs a rvi ce s Staff Review Comments 1 Project: Second Street Apts (PIP) — 15-00900046 LANNING 4,/ . The note requested under Transportation comments should also be placed on the landscape plan.Noted. 2. Just a reminder to ensure the landscape plan for the PIP and the Site Plan Application should show the same information. Noted. 3. Any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter.Noted. Reviewed by: Jessica Bullock Date: 3/17/15 ENGINEERING COMMENTS NO. 1 it The existing 6-inch and 8-inch waterlines that are being relocated should be labeled as such rather than being labeled "proposed." Water line labels have been revised Q/Clearly label the private storm infrastructure, benches, trees, irrigation, etc. as "private." 43,00%-x P ivate labels have been added. Erosion & Sediment Control Notes and details are not necessary on the PIP. Erosion and W- ediment control notes and details have been removed. a%rte . Please dimension the location of all private improvements from the back of curb or edge of ' he right-of-way.Additional dimensions have been added. Per application, please provide a Signage Plan and Engineer's Cost Estimate for the removal of all private infrastructure. A signage plan has been added to the PIP exhibit and a cost estimate is attached. 4.f FYI...Surety will be required for the removal of the private infrastructure prior to approval of the PIP or Site Plan. Landscape and irrigation removal is typically a flat $50 fee, but all other items need to be estimated. Noted Reviewed by: Erika Bridges Date: 3/12/15 j'RANSPORTATION V�`( The trees located within 30' of intersections of Cherry/Boyett and Cherry/Second Street may block the stop signs. Please add a note stating that these trees need to be trimmed so the lowest branches start at a height of 9'. PIP note 1 has been added. Reviewed by: Danielle Singh, P.E., Transportation Planning Coord. Date: 3/18/15 . k EJ,ECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 4 EASEMENTS: Developer provides temporary blanket easement for construction purposes and upon completion of project must provide descriptive easements for electric infrastructure / as designed by CSU. Noted. V 2. EASEMENTS: Developer provides descriptive easements for electric infrastructure as / designed by CSU, as shown on plat or site plan.Noted. 9./3. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries.Noted. /4. Three decorative streetlights required for this project. Contact CSU Electric for decorative streetlight requirements. Noted. ENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. Noted. 2. CSU will provide drawings for electrical installation.Noted. ✓3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Noted. )4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout.Noted X15. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device,per CSU specs and design.Noted. 116. Developer installs pull boxes per CSU specs and design, Pull boxes provided by CSU. Noted. ij 7. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU.Noted. 8. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Noted. Reviewed by: Sam Weido Date: 2/17/15 SANITATION 1 1. Sanitation is ok with this project.Noted. Reviewed by: Wally Urrutia Date: 2/19/15 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive,Suite A College Station,Texas 77845 Firm No. 12327 Cherry Street Apartments Engineer's Estimate for Private Improvements in Public Right of Way Item DescriptionUnit Estimated Unit Price Total �J � 'i rogwti �` t 3 � qua � o , I Landscape&Irrigation Removal(City Flat Fee) LS 1 $ 50.00 $ 50.00 2 Park Bench Removal LS 1 $ 100.00 $ 100.00 3 Private Storm Outfall Structure Removal LS 1 $ 2,000.00 $ 2,000.00 3 4"Private Storm Drain Piping Removal LF 534 $ 5.00 $ 2,670.00 General Items Subtotal $ 4,820.00 TOTAL CONSTRUCTION $ 4,820.00 OFie7 `_t,AE.• `__ ,t r .* DEVLN L. DOYEN 0 14. 109835 f . c, FIRM # 12327 SCHULTZ ENGINEERING, LLC Page 1 of 1 FOR OFFICE USE ONLY CASE NO.: 15- -I1 DATE SUBMITTED: 03 '2S IS TIME: '.3o CITY OF COLLEGE STATION pcsHome of Texas A&M University° STAFF: PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. I I New Project Submittal ❑ Incomplete Project Submittal -documents needed to complete an application. Case No.: n Existing Project Submittal. Case No.: 15-00900046 Project Name Second Street Apartments Contact Name Joe Schultz, P.E. Phone Number 979.764.3900 We are transmitting the following for Planning & Development Services to review and comment(check all that apply): ❑ Comprehensive Plan Amendment Non-Residential Architectural Standards n Rezoning Application Irrigation Plan I I Conditional Use Permit ❑ Variance Request Preliminary Plan ❑ Development Permit n Final Plat ❑ Development Exaction Appeal LJ Development Plat _ FEMA CLOMA/CLOMR/LOMA/LOMR Site Plan ❑ Grading Plan Special District Site Plan ❑x Other- Please specify below ❑ Special District Building /Sign PIP Exhibit& PIP Engineer's Estimate lx1 Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: Comprehensive Plan Amendment Waterline Construction Documents TxDOT Driveway Permit LJ Sewerline Construction Documents U TxDOT Utility Permit LJ Street Construction Documents ❑ Drainage Letter or Report Li Easement Application Fire Flow Analysis ❑ Other- Please specify Special Instructions: 10/1 o Prtnt Form Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 March 25, 2015 Jessica Bullock Staff Planner Development Services City of College Station College Station, Texas Re: Second Street Apartments (PIP) 15-00900046 Dear Ms. Bullock: Attach is the response to comments for the PIP and the following: • 2–Revised PIP Exhibits • 2 –Revised Landscape Plan • Engineer's Estimate for PIP Application Sincerely, _____ T__— Deven L. Doyen, P.E. Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com 0g w ' ' '',,.i—11 3: ' \ ' . , ] 0/ M t s £ 11 lig nr,,W' t I a1 g (In le I I o ,,iia �i : � a D1lpt©' _RA.: p4;2 al ffi3 ./lir 1.,,,,,,r, 8— N9r /C t I Ti .q� E1 ! � / 1 fart ,,� 9 t t A _ h T '. 0— • g �,,L4',9-i,,� $ '� , � E ; g 11 A £ rim W i■ i l‘ a* 01 **4 i'' it A — \ F' 1111 l';1!. '' 1 "lill 11 e = .;,... :ft Oft , , roi A �: i�: , p " q moi„ tl I i I I IIA 4 2 : ift ) ,.. i t ` ' 7 s slil$R1 t IV gg • g �ilgig Er R ��ar f ■ e:2 1. NA sl! N► .._ __,_ � as I yL K 1 C] ' r 8 i ilk ., I b ✓�. / nv wv nvvu ioc 6g4 i cn et \d/ / a 1, .i. _ ,,q.."3 '8 n ,,, / P'1 .% -> 1.:/Li' 1 lip jk 1 41. i' 0,sir `� r,Kz�R QTR : €aait � o°z as 1A - ;apl i tat $ p q /2 aly !' "A'9 ,-i./.x'i!�!r ash h I �� b EE D 1 111 3 A, /�"-" r I\C mil. t!4°n } o 5�g :ii g'6 s €.e. ,its Liy _ �llliliiyii.� c:^ �' �B - �rL \'� :Za!iil e�:! j !A 8" d P 1111 ro Z 1 elk*** C') —Ca g g £ 1r1 P 0 1 IR i* i il.11;,r•i E, 5 V' Raa< a d� �e5 ./�, " Q �> -• ft E7 t 1�q 4 ` •�` 1 _r' c o. ''"" 5` a ill @' SFJ i