Loading...
HomeMy WebLinkAboutSewer Report Sewer System Report for Castlegate II Subdivision College Station, Texas Prepared by Phillips Engineering Original Report - Section 200 - February 2011 Section 201 - December 2011 Section 202 - June 2012 Prepared by Schultz Engineering Section 100-November 2012 Section 101 -April 2013 Section 102 -July 2013 Section 203 -August 2013 Section 103 -August 2013 Section 204-August 2013 Section 205-October 2013 Section 104-November 2013 Section 105 -July 2014 Section 106-February 2015 Prepared By: Schultz Engineering, LLC TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 OF r 979.764.3900 jam* * iii •{R#i#Ail+lrrY*•*44*s*• JOSEPH P. ScHUL"2 6. .. Rn F X 414 0400w 2 -Z3-/ S 1 F-12327 SCHULTZ ENGINEERING. LLC. GENERAL INFORMATION The Castlegate II Subdivision is a 202-acre residential subdivision being developed immediately southwest of the existing Castlegate Subdivision in College Station. The approved Preliminary Plat shows a total of 645 lots in the whole development. Sections 200, 201, 202, 203, 205, 100, 101, 103, 104, and 105 have been completed or are under construction. Section 106 is unchanged from the Preliminary Plat and will add 44 new lots. The tract of land that comprises this subdivision lies across a drainage divide that cannot be crossed using gravity lines. As a result, a lift station is being planned in a later phase of the development. The force main from this development will empty into one of the trunk lines that serve much of the rest of the development. On the spreadsheet shown in Exhibit C, the force main is shown as a 12" gravity line for computational purposes. Sewer line S-12 along Kinnersley Court is being extended to the adjacent property to provide sewer service to the property. 105 Lots have been assumed to be developed on the adjacent property and included in this analysis. Design Criteria: Primary Sewer Outfall: Section 106- 8"sewer line at existing terminus of Kinnersley Court and a 6" sewer line at existing terminus of Hailes Court both constructed with Section 101. Domestic Demand: Avg. Pop Density: 2.67 people per lot Average Flow: 100 gpd/cap or 267 gpd per lot Peaking Factor: 4 Pipe: PVC D3034 SDR 26 Applicable Exhibits: Exhibit A—Overall Sewer System Layout Exhibit B—Section 106 Sewer System Layout Exhibit C—Sanitary Sewer Analysis Spreadsheet Conclusion: The sewer system shown in Exhibit A has been laid out using the criteria in the Bryan/College Station Design Guidelines and TCEQ. It is analyzed assuming peak flow conditions when the subdivision is fully developed. The spreadsheet in Exhibit C shows all lines depicted in Exhibit B to be capable of carrying the flows that come to them under these conditions. This analysis will be used as the basis for all subsequent sewer line designs in the subdivision. The systepm will function as intended as long as the line sizes and slopes are equal to or greater than those shown herein. It should be noted that any significant additional flow from off-site sources will likely exceed the capacity of several lines, so careful study is advised of any changes to the contributing area. 2 EXHIBIT A OVERALL SEWER SYSTEM LAYOUT f • ED!?' t �rr..rw+�►rwrvrr.r.r.+..ir�� a�=4 ,� '" 4 i' \ 1E1 qi n. ,....„,„......., ,!, , lig, - , -iiii----iiipp al mo ,?4,3 :iim '1,'H :. 3 ' -ja. .... 4 all i* ..1 , .. .in t . . . .: . ,. ms. , : . 1 iliv. • ..fir.. t IAI1►,. ...... .. . , ti. ......J .,:aini ' :mit au r .:....alt it ''..714;i ... IP . ' ' .....,' .-. '': ' -:. ' :' '''' Ill . #0, ill . 111411111111 l 2 ► '( , alli imam ma _ . .. .. ...... , , ....... 4 Itaa am• skan !i ,. ,T; bil.. ' I. rid*"stu...',. , .. , ,.44 . .. ,Iii. am if *Mil alli '' 111111111111 111.11111111 '''k'''• illk - d? II' 111 timi milimit.,..amimm F,`, 71.1.--Iiklit,1-- 1-1" ,....... '11,3........4: Mak a NI 1111 , 7� .,......+,�.�.w":': Vit• i,:.. mow..,.... w �, . � -� . .�,_ r im MI MIMI 11111111111 . . i . le 4 t4 � � 111 '` 1 1.1 Ile II MAIM i 1111111111111 ' ' IN 1 III Mr)0 ..r- ., Par,,, ,kittiPrti ., , i ' .i) 1 ,. ,. .__„_„_.) ,,.. , ..,,IN ,,,,1/4. , . yak OM 10„.„ ,,,,. ., . i.:: , . __ . .• . __ .,, .E �._ _ � EXHIBIT EXHIBIT B SECTION 106 SEWER SYSTEM LAYOUT EXHIBIT C SANITARY SEWER ANALYSIS SPREADSHEET