Loading...
HomeMy WebLinkAboutMisc FOR OFFI FUSE ONL CASE DATE SUB ITTED: r 1 S` J TIME: '9i 90 CITY OF COLLEGE STATION STAFF: Home of Texas A&M University' PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. I I New Project Submittal I I Incomplete Project Submittal -documents needed to complete an application. Case No.: IXI Existing Project Submittal. Case No.: 15-00900059 Project Name CASTLEGATE II SUBDIVISION- SECTION 106 Contact Name JOE SCHULTZ, P.E. Phone Number 979.764.3900 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): Comprehensive Plan Amendment _ Non-Residential Architectural Standards Lf Rezoning Application n Irrigation Plan Conditional Use Permit _ Variance Request I I Preliminary Plan I Development Permit Ix' Final Plat I I Development Exaction Appeal Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR Site Plan x Grading Plan I I Special District Site Plan Ixi Other- Please specify below I I Special District Building / Sign Civil Construction Plans stamping I Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: I I Comprehensive Plan Amendment lXi Waterline Construction Documents I I TxDOT Driveway Permit Ixi Sewerline Construction Documents TxDOT Utility Permit Ixi Street Construction Documents IXI Drainage Letter or Report ❑ Easement Application ❑x Fire Flow Analysis n Other- Please specify Special Instructions: 10/10 Print Form Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 April 15, 2015 Kevin Ferrer Graduate Civil Engineer City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Castlegate II Sec 106 (FP) - (15-00900059) Dear Mr. Ferrer: Attached are four(4) full sets of construction documents for stamping and one(1) 24"x36" copy of the erosion control plan. If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering,LLC. Joe Sr u1tz, P.E. Manager/Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Castlegate II Subdivision-Section 106 Engineer's Estimate of Construction Item Description Unit Estimated Unit Price Total Quantity General Items 1 Mobilization,Overhead and Construction Staking LS 1 $ 15,000.00 $ 15,000.00 2 Topsoil Removal and Replacement,complete in place LS 1 $ 12,000.00 $ 12,000.00 3 Pavement Striping and Markings,complete in place LS 1 $ 8,000.00 $ 8,000.00 4 Install End of Street Signs,complete in place LS 3 $ 150.00 $ 450.00 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence, 5 LS 1 $ 5,000.00 $ 5,000.00 Construction Exit,Rock Filter Dam,etc.,complete in place 6 Hydroseed and Hydromulch,complete in place SY 4,800 $ 0.50 $ 2,400.00 General Items Subtotal $ 42,850.00 Street Construction Items Concrete Pavement 7 Excavation&Grading,complete in place LS 1 $ 15,000.00 $ 15,000.00 8 Mixing&incorporation of lime,6"deep,complete in place SY 4,108 $ 2.20 $ 9,037.60 9 Hydrated Lime,complete in place(271b/sy fot 6"deep&36 Ib/sy for 8"deep) Ton 55 $ 170.00 $ 9,426.50 10 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,627 $ 40.00 $ 145,080.00 Street Construction Concrete Pavement Items Subtotal $ 178,544.10 Storm Sewer Construction Items 11 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 248 $ 70.00 $ 17,360.00 12 30"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 268 $ 60.00 $ 16,080.00 13 30"HDPE Pipe,complete in place-Non-Structural Backfill,complete in place LF 105 $ 55.00 $ 5,775.00 14 24"RCP Pipe,complete in place-Structural Backfill,complete in place LF 62 $ 55.00 $ 3,410.00 15 Curb Inlet- 10'wide,complete in place EA 4 $ 3,750.00 $ 15,000.00 16 4'x4'Junction Box,complete in place EA 3 $ 2,500.00 $ 7,500.00 17 TV Testing and Inspection,complete in place LF 683 $ 2.00 $ 1,366.00 Storm Sewer Construction Items Subtotal $ 66,491.00 Water Construction Items 18 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 188 $ 20.00 $ 3,760.00 19 4"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 788 $ 16.00 $ 12,608.00 20 4"x 45°M.J.Bend,complete in place EA 8 $ 200.00 $ 1,600.00 21 1"Water Service,> 15 ft(avg length=48 ft)(4"Line) EA 4 $ 850.00 $ 3,400.00 22 1.5"Water Service,<15 ft(avg length=2 ft)(4"Line) EA 10 $ 800.00 $ 8,000.00 23 1.5"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 8 $ 1,200.00 $ 9,600.00 24 2"Blowoff Assembly,complete in place EA _ 2 $ 1,000.00 $ 2,000.00 25 Connect to Existing 4"Water Line EA 2 $ 1,000.00 $ 2,000.00 26 Waterline Testing LS 1 $ 1,000.00 $ 1,000.00 Water Construction Items Subtotal $ 43,968.00 Page 1 of 2 Castlegate II Subdivision-Section 106 Engineer's Estimate of Construction Estimated Item Description Unit Quantity Unit Price Total Sanitary Sewer Construction Items 27 8"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 89 $ 28.00 $ 2,492.00 28 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 461 $ 24.00 $ 11,064.00 29 6"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 351 $ 16.00 $ 5,616.00 30 4"Sewer Service-Single(avg.length=411),complete in place EA 2 $ 450.00 $ 900.00 31 4"Sewer Service-Single(avg length=48 ft),complete in place EA 2 $ 850.00 $ 1,700.00 32 4"Sewer Service-Double(avg length=4 ft),complete in place EA 6 $ 600.00 $ 3,600.00 33 4"Sewer Service-Double(avg length=48 ft),complete in place EA 10 $ 1,100.00 $ 11,000.00 34 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,950.00 $ 11,800.00 35 TV Testing and Inspection,complete in place LF 901 $ 2.50 $ 2,252.50 Sanitary Sewer Construction Items Subtotal $ 50,424.50 General Items Subtotal $ 42,850.00 OF Street Construction Concrete Pavement Items Subtotal $ 178,544.10 r . Storm Sewer Construction Items Subtotal $ 66,491.00 . ***N6Ai Water Construction Items Subtotal $ 43,968.00 JOSEPH P. SCHULTZ Sanitary Sewer Construction Items Subtotal $ 50,424.50 65889 ,, 1. 3,";s • TOTAL CONSTRUCTION $ 382,277.60 ' r F-12327 Z- -Ili cS SCHULTZ ENGINEERING„ t1C. Page 2 of 2 Castlegate II Subdivision-Section 106 Engineer's Estimate to Completion Estimated %Complete Amount Amount Item Description Unit Unit Price Total Quantity Quantity Complete(5) Remaining Sanitary Sewer Construction Items 27 8"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 89 $ 28.00 $ 2,492.00 100% $ 2,492.00 $ - 28 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 461 $ 24.00 $ 11,064.00 100% $ 11,064.00 $ - 29 6"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 351 $ 16.00 $ 5,616.00 100% $ 5,616.00 $ - 30 4"Sewer Service-Single(avg.length=4ft),complete in place EA 2 $ 450.00 $ 900.00 100% $ 900.00 $ - 31 4"Sewer Service-Single(avg length=48 ft),complete in place EA 2 $ 850.00 $ 1,700.00 100% $ 1,700.00 $ 32 4"Sewer Service-Double(avg length=4 ft),complete in place EA 6 $ 600.00 $ 3,600.00 100% $ 3,600.00 $ - 33 4"Sewer Service-Double(avg length=48 ft),complete in place EA 10 $ 1,100.00 S 11,000.00 100% $ 11,000.00 $ - 34 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,950.00 $ 11,800.00 100% $ 11,800.00 $ - 35 TV Testing and Inspection,complete in place LF 901 $ 2.50 $ 2,252.50 100% $ 2,252.50 $ Sanitary Sewer Construction Items Subtotal $ 50,42450 Remaining Subtotal $ - Total Remaining General Items Subtotal $ 42,850.00 $ 6,1011.1(0 Street Construction Concrete Pavement Items Subtotal $ 178,544.10 $ 1,450.80 Storm Sewer Construction Items Subtotal $ 66,491.00 $ 6,750.011(7.4,..,0, ,, Water Construction Items Subtotal $ 43,968.00 $Sanitary Sewer Construction Items Subtotal $ 50,424.50 $50%Additional Grass Subtotal $ 1,200.00 $ 1 200.00 %°'+ - TOTAL CONSTRUCTION $ 382,277.60 $ 14,300.80 NuLv.. . 6`',1 rtiY. / F-12327 9-f4//5" SCHULTZ ENGINEERING, LLC. Page 2 of 2 SCHULTZ ENGINEERING,LLC. 2730 Longmire Drive,Suite A College Station,Texas 77845 Firm No.12327 Castlegate II Subdivision-Section 106 Engineer's Estimate to Completion Estimated %Complete Amount Amount Item Description Unit Unit Price Total Quantity Quantity Complete(5) Remaining General Items 1 Mobilization,Overhead and Construction Staking LS I $ 15,000.00 $ 15,000.00 100% $ 15,000.00 $ - 2 Topsoil Removal and Replacement,complete in place LS 1 $ 12,000.00 $ 12,000.00 90% $ 10,800.00 $ 1,200.00 3 Pavement Striping and Markings,complete in place LS 1 $ 8,000.00 $ 8,000.00 100% $ 8,000.00 $ - 4 Install End of Street Signs,complete in place LS 3 $ 150.00 $ 450.00 100% $ 450.00 $ - 5 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence, LS 1 $ 5,000.00 $ 5,000.00 50% $ 2,500.00 $ 2,500.00 Construction Exit,Rock Filter Dam,etc.,complete in place 6 Hydroseed and Hydromulch,complete in place SY 4,800 $ 0.50 $ 2,400.00 0% $ - $ 2,400.00 General Items Subtotal $ 42,850.00 Remaining Subtotal $ 6,100.00 Street Construction Items Concrete Pavement 7 Excavation&Grading,complete in place LS 1 $ 15,000.00 $ 15,000.00 100% $ 15,000.00 $ - 8 Mixing&incorporation of lime,6"deep,complete in place SY 4,108 $ 2.20 $ 9,037.60 100% $ 9,037.60 $ - 9 Hydrated Lime,complete in place(27 Ib/sy fot 6"deep&36 lb/sy for 8"deep) Ton 55 $ 170.00 $ 9,426.50 100% $ 9,426.50 $ - 10 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,627 $ 40.00 $ 145,080.00 99% $ 143,629.20 $ 1,450.80 Street Construction Concrete Pavement Items Subtotal $ 178,544.10 Remaining Subtotal $ 1,450.80 Storm Sewer Construction Items 11 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 248 $ 70.00 $ 17,360.00 100% $ 17,360.00 $ - 12 30"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 268 $ 60.00 $ 16,080.00 100% $ 16,080.00 $ - 13 30"HDPE Pipe,complete in place-Non-Structural Backfill,complete in place LF 105 $ 55.00 $ 5,775.00 100% $ 5,775.00 $ - 14 24"RCP Pipe,complete in place-Structural Backfill,complete in place LF 62 $ 55.00 $ 3,410.00 100% $ 3,410.00 $ - 15 Curb Inlet-10'wide,complete in place EA 4 $ 3,750.00 $ 15,000.00 70% $ 10,500.00 $ 4,500.00 16 4'x4'Junction Box,complete in place EA 3 $ 2,500.00 $ 7,500.00 70% $ 5,250.00 $ 2,250.00 17 TV Testing and Inspection,complete in place LF 683 $ 2.00 $ 1,366.00 100% $ 1,366.00 $ - Storm Sewer Construction Items Subtotal $ 66,491.00 Remaining Subtotal $ 6,750.00 Water Construction Items 18 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 188 $ 20.00 $ 3,760.00 100% $ 3,760.00 $ - 19 4"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 788 $ 16.00 $ 12,608.00 100% $ 12,608.00 $ - 20 4"x 45°M.J.Bend,complete in place EA 8 $ 200.00 $ 1,600.00 100% $ 1,600.00 $ - 21 1"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 4 $ 850.00 $ 3,400.00 100% $ 3,400.00 $ - 22 1.5"Water Service,<15 ft(avg length=2 ft)(4"Line) EA 10 $ 800.00 $ 8,000.00 100% $ 8,000.00 $ - 23 1.5"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 8 $ 1,200.00 $ 9,600.00 100% $ 9,600.00 $ - 24 2"Blowoff Assembly,complete in place EA 2 $ 1,000.00 $ 2,000.00 100% $ 2,000.00 $ - 25 Connect to Existing 4"Water Line EA 2 $ 1,000.00 $ 2,000.00 100% $ 2,000.00 $ - 26 Waterline Testing LS 1 $ 1,000.00 $ 1,000.00 100% $ 1,000.00 $ - Water Construction Items Subtotal $ 43,968.00 Remaining Subtotal $ - Page 1 of 2 FOR OFFIC USE :3,y , CASE NO.: l�J•C *ff DATE SUBMITTED: 1 118411111 TIME: .' I CITY OF COW STATION Home of Texas A6M University' STAFF: L5----) PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal Incomplete Project Submittal -documents needed to complete an application. Case No.: ❑X Existing Project Submittal. Case No.: 15-00900059 Project Name CASTLEGATE II SUBDIVISION- SECTION 106 Contact Name JOE SCHULTZ, P.E. Phone Number 979.764.3900 We are transmitting the following for Planning & Development Services to review and comment (check all that apply): I Comprehensive Plan Amendment n Non-Residential Architectural Standards Rezoning Application n Irrigation Plan n Conditional Use Permit n Variance Request ❑ Preliminary Plan n Development Permit ❑X Final Plat ] Development Exaction Appeal ❑ Development Plat n FEMA CLOMA/CLOMR/LOMA/LOMR I I Site Plan x Grading Plan n Special District Site Plan n Other- Please specify below ❑ Special District Building /Sign Civil Construction Plans Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: I I Comprehensive Plan Amendment 0 Waterline Construction Documents TxDOT Driveway Permit Sewerline Construction Documents TxDOT Utility Permit 0 Street Construction Documents x Drainage Letter or Report _ Easement Application IXI Fire Flow Analysis ❑ Other- Please specify Special Instructions: 10/10 Print Form Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 March 18, 2015 Jessica Bullock Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Castlegate II Sec 106 (FP) - (15-00900059) Dear Ms. Bullock: Attached are the following items for the project referenced above: • One (1) 24"x 36" copy of the revised Final Plat • Thirteen(13) 11"x17" copies of the revised Final Plat • One(1) 24"x 36" copy of the grading and erosion control plan • Two (2) sets of the revised construction documents • One(1) copy of the revised Engineer's Estimate • One (1) copy of the Drainage Report • Response to Staff Comments If you have any questions,please do not hesitate to call. Sincerely, Schultz Engineering, LLC. I ' Joe S•1 ltz, P.E. Manager(Civil Engineer) P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com :9)0 M / A))11 - - Schultz Engineering, L roipci Office: 979.764.3900 Fax: 979.764.3910 September 21, 2015 Jessica Bullock Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Castlegate II Sec 106 (FP) - (15-00900059) Dear Ms. Bullock: Attached are the following items for the project referenced above: • Mylar original of the Final Plat • CAD file of plat on a CD • A check for$27,500 for the Parkland Dedication If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. AtiajaktJoe S I ultz, P.E. Manager/Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com Cash Register Receipt Receipt Number City of College Station R4771 CM'OF COLLEGE STA11OiN DESCRIPTION I ACCOUNT I QTY I PAID ProjectTRAK $27,500.00 FP2015-900059 Address: 2600 HAILES CT Apn: 005401-0025-0000 $27,500.00 COMMUNITY PARK A(MULTI-FAMILY)DEVELOPMENT $27,500.00 COMMUNITY PARK A(MULTI FAMILY) DEVELOPMENT *NONE* $27,500.00 TOTAL FEES PAID BY RECEIPT: R4771 $27,500.00 Date Paid:Tuesday, September 22, 2015 Paid By: 3-D DEVELOPMENT Cashier: GB Pay Method: CHECK 8323 Printed:Tuesday,September 22,2015 8:23 AM 1 of 1