Project Name CASTLEGATE II SUBDIVISION- SECTION 106
Contact Name JOE SCHULTZ, P.E. Phone Number 979.764.3900
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
Comprehensive Plan Amendment _ Non-Residential Architectural Standards
Lf Rezoning Application n Irrigation Plan
Conditional Use Permit _ Variance Request
I I Preliminary Plan I Development Permit
Ix' Final Plat I I Development Exaction Appeal
Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
Site Plan x Grading Plan
I I Special District Site Plan Ixi Other- Please specify below
I I Special District Building / Sign Civil Construction Plans stamping
I Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
I I Comprehensive Plan Amendment lXi Waterline Construction Documents
I I TxDOT Driveway Permit Ixi Sewerline Construction Documents
TxDOT Utility Permit Ixi Street Construction Documents
IXI Drainage Letter or Report ❑ Easement Application
❑x Fire Flow Analysis n Other- Please specify
Special Instructions:
10/10 Print Form
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
April 15, 2015
Kevin Ferrer
Graduate Civil Engineer
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Castlegate II Sec 106 (FP) - (15-00900059)
Dear Mr. Ferrer:
Attached are four(4) full sets of construction documents for stamping and one(1) 24"x36" copy
of the erosion control plan.
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering,LLC.
Joe Sr u1tz, P.E.
Manager/Civil Engineer
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Castlegate II Subdivision-Section 106
Engineer's Estimate of Construction
Item Description Unit Estimated Unit Price Total
Quantity
General Items
1 Mobilization,Overhead and Construction Staking LS 1 $ 15,000.00 $ 15,000.00
2 Topsoil Removal and Replacement,complete in place LS 1 $ 12,000.00 $ 12,000.00
3 Pavement Striping and Markings,complete in place LS 1 $ 8,000.00 $ 8,000.00
4 Install End of Street Signs,complete in place LS 3 $ 150.00 $ 450.00
Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,
5 LS 1 $ 5,000.00 $ 5,000.00
Construction Exit,Rock Filter Dam,etc.,complete in place
6 Hydroseed and Hydromulch,complete in place SY 4,800 $ 0.50 $ 2,400.00
General Items Subtotal $ 42,850.00
Street Construction Items Concrete Pavement
7 Excavation&Grading,complete in place LS 1 $ 15,000.00 $ 15,000.00
8 Mixing&incorporation of lime,6"deep,complete in place SY 4,108 $ 2.20 $ 9,037.60
9 Hydrated Lime,complete in place(271b/sy fot 6"deep&36 Ib/sy for 8"deep) Ton 55 $ 170.00 $ 9,426.50
10 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,627 $ 40.00 $ 145,080.00
Street Construction Concrete Pavement Items Subtotal $ 178,544.10
Storm Sewer Construction Items
11 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 248 $ 70.00 $ 17,360.00
12 30"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 268 $ 60.00 $ 16,080.00
13 30"HDPE Pipe,complete in place-Non-Structural Backfill,complete in place LF 105 $ 55.00 $ 5,775.00
14 24"RCP Pipe,complete in place-Structural Backfill,complete in place LF 62 $ 55.00 $ 3,410.00
15 Curb Inlet- 10'wide,complete in place EA 4 $ 3,750.00 $ 15,000.00
16 4'x4'Junction Box,complete in place EA 3 $ 2,500.00 $ 7,500.00
17 TV Testing and Inspection,complete in place LF 683 $ 2.00 $ 1,366.00
Storm Sewer Construction Items Subtotal $ 66,491.00
Water Construction Items
18 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 188 $ 20.00 $ 3,760.00
19 4"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 788 $ 16.00 $ 12,608.00
20 4"x 45°M.J.Bend,complete in place EA 8 $ 200.00 $ 1,600.00
21 1"Water Service,> 15 ft(avg length=48 ft)(4"Line) EA 4 $ 850.00 $ 3,400.00
22 1.5"Water Service,<15 ft(avg length=2 ft)(4"Line) EA 10 $ 800.00 $ 8,000.00
23 1.5"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 8 $ 1,200.00 $ 9,600.00
24 2"Blowoff Assembly,complete in place EA _ 2 $ 1,000.00 $ 2,000.00
25 Connect to Existing 4"Water Line EA 2 $ 1,000.00 $ 2,000.00
26 Waterline Testing LS 1 $ 1,000.00 $ 1,000.00
Water Construction Items Subtotal $ 43,968.00
Page 1 of 2
Castlegate II Subdivision-Section 106
Engineer's Estimate of Construction
Estimated
Item Description Unit Quantity Unit Price Total
Sanitary Sewer Construction Items
27 8"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 89 $ 28.00 $ 2,492.00
28 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 461 $ 24.00 $ 11,064.00
29 6"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 351 $ 16.00 $ 5,616.00
30 4"Sewer Service-Single(avg.length=411),complete in place EA 2 $ 450.00 $ 900.00
31 4"Sewer Service-Single(avg length=48 ft),complete in place EA 2 $ 850.00 $ 1,700.00
32 4"Sewer Service-Double(avg length=4 ft),complete in place EA 6 $ 600.00 $ 3,600.00
33 4"Sewer Service-Double(avg length=48 ft),complete in place EA 10 $ 1,100.00 $ 11,000.00
34 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,950.00 $ 11,800.00
35 TV Testing and Inspection,complete in place LF 901 $ 2.50 $ 2,252.50
Sanitary Sewer Construction Items Subtotal $ 50,424.50
General Items Subtotal $ 42,850.00
OF Street Construction Concrete Pavement Items Subtotal $ 178,544.10
r . Storm Sewer Construction Items Subtotal $ 66,491.00
. ***N6Ai Water Construction Items Subtotal $ 43,968.00
JOSEPH P. SCHULTZ Sanitary Sewer Construction Items Subtotal $ 50,424.50
65889
,, 1. 3,";s • TOTAL CONSTRUCTION $ 382,277.60
' r
F-12327 Z- -Ili cS
SCHULTZ ENGINEERING„ t1C.
Page 2 of 2
Castlegate II Subdivision-Section 106
Engineer's Estimate to Completion
Estimated %Complete Amount Amount
Item Description Unit Unit Price Total
Quantity Quantity Complete(5) Remaining
Sanitary Sewer Construction Items
27 8"PVC Sewer Line-D3034-Structural Backfill,complete in place LF 89 $ 28.00 $ 2,492.00 100% $ 2,492.00 $ -
28 8"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 461 $ 24.00 $ 11,064.00 100% $ 11,064.00 $ -
29 6"PVC Sewer Line-D3034-Non-Structural Backfill,complete in place LF 351 $ 16.00 $ 5,616.00 100% $ 5,616.00 $ -
30 4"Sewer Service-Single(avg.length=4ft),complete in place EA 2 $ 450.00 $ 900.00 100% $ 900.00 $ -
31 4"Sewer Service-Single(avg length=48 ft),complete in place EA 2 $ 850.00 $ 1,700.00 100% $ 1,700.00 $
32 4"Sewer Service-Double(avg length=4 ft),complete in place EA 6 $ 600.00 $ 3,600.00 100% $ 3,600.00 $ -
33 4"Sewer Service-Double(avg length=48 ft),complete in place EA 10 $ 1,100.00 S 11,000.00 100% $ 11,000.00 $ -
34 Concrete Manhole-4'Dia.-complete in place EA 4 $ 2,950.00 $ 11,800.00 100% $ 11,800.00 $ -
35 TV Testing and Inspection,complete in place LF 901 $ 2.50 $ 2,252.50 100% $ 2,252.50 $
Sanitary Sewer Construction Items Subtotal $ 50,42450 Remaining Subtotal $ -
Total Remaining
General Items Subtotal $ 42,850.00 $ 6,1011.1(0
Street Construction Concrete Pavement Items Subtotal $ 178,544.10 $ 1,450.80
Storm Sewer Construction Items Subtotal $ 66,491.00 $ 6,750.011(7.4,..,0, ,,
Water Construction Items Subtotal $ 43,968.00 $Sanitary Sewer Construction Items Subtotal $ 50,424.50 $50%Additional Grass Subtotal $ 1,200.00 $ 1 200.00
%°'+ - TOTAL CONSTRUCTION $ 382,277.60 $ 14,300.80
NuLv.. . 6`',1
rtiY.
/ F-12327 9-f4//5"
SCHULTZ ENGINEERING, LLC.
Page 2 of 2
SCHULTZ ENGINEERING,LLC.
2730 Longmire Drive,Suite A
College Station,Texas 77845
Firm No.12327
Castlegate II Subdivision-Section 106
Engineer's Estimate to Completion
Estimated %Complete Amount Amount
Item Description Unit Unit Price Total
Quantity Quantity Complete(5) Remaining
General Items
1 Mobilization,Overhead and Construction Staking LS I $ 15,000.00 $ 15,000.00 100% $ 15,000.00 $ -
2 Topsoil Removal and Replacement,complete in place LS 1 $ 12,000.00 $ 12,000.00 90% $ 10,800.00 $ 1,200.00
3 Pavement Striping and Markings,complete in place LS 1 $ 8,000.00 $ 8,000.00 100% $ 8,000.00 $ -
4 Install End of Street Signs,complete in place LS 3 $ 150.00 $ 450.00 100% $ 450.00 $ -
5 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence, LS 1 $ 5,000.00 $ 5,000.00 50% $ 2,500.00 $ 2,500.00
Construction Exit,Rock Filter Dam,etc.,complete in place
6 Hydroseed and Hydromulch,complete in place SY 4,800 $ 0.50 $ 2,400.00 0% $ - $ 2,400.00
General Items Subtotal $ 42,850.00 Remaining Subtotal $ 6,100.00
Street Construction Items Concrete Pavement
7 Excavation&Grading,complete in place LS 1 $ 15,000.00 $ 15,000.00 100% $ 15,000.00 $ -
8 Mixing&incorporation of lime,6"deep,complete in place SY 4,108 $ 2.20 $ 9,037.60 100% $ 9,037.60 $ -
9 Hydrated Lime,complete in place(27 Ib/sy fot 6"deep&36 lb/sy for 8"deep) Ton 55 $ 170.00 $ 9,426.50 100% $ 9,426.50 $ -
10 6"Reinforced Concrete Pavement w/Curb,complete in place SY 3,627 $ 40.00 $ 145,080.00 99% $ 143,629.20 $ 1,450.80
Street Construction Concrete Pavement Items Subtotal $ 178,544.10 Remaining Subtotal $ 1,450.80
Storm Sewer Construction Items
11 30"RCP Pipe,complete in place-Structural Backfill,complete in place LF 248 $ 70.00 $ 17,360.00 100% $ 17,360.00 $ -
12 30"HDPE Pipe,complete in place-Structural Backfill,complete in place LF 268 $ 60.00 $ 16,080.00 100% $ 16,080.00 $ -
13 30"HDPE Pipe,complete in place-Non-Structural Backfill,complete in place LF 105 $ 55.00 $ 5,775.00 100% $ 5,775.00 $ -
14 24"RCP Pipe,complete in place-Structural Backfill,complete in place LF 62 $ 55.00 $ 3,410.00 100% $ 3,410.00 $ -
15 Curb Inlet-10'wide,complete in place EA 4 $ 3,750.00 $ 15,000.00 70% $ 10,500.00 $ 4,500.00
16 4'x4'Junction Box,complete in place EA 3 $ 2,500.00 $ 7,500.00 70% $ 5,250.00 $ 2,250.00
17 TV Testing and Inspection,complete in place LF 683 $ 2.00 $ 1,366.00 100% $ 1,366.00 $ -
Storm Sewer Construction Items Subtotal $ 66,491.00 Remaining Subtotal $ 6,750.00
Water Construction Items
18 4"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 188 $ 20.00 $ 3,760.00 100% $ 3,760.00 $ -
19 4"C900 Water Pipe w/tracer wire-Non-Structural Backfill,complete in place LF 788 $ 16.00 $ 12,608.00 100% $ 12,608.00 $ -
20 4"x 45°M.J.Bend,complete in place EA 8 $ 200.00 $ 1,600.00 100% $ 1,600.00 $ -
21 1"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 4 $ 850.00 $ 3,400.00 100% $ 3,400.00 $ -
22 1.5"Water Service,<15 ft(avg length=2 ft)(4"Line) EA 10 $ 800.00 $ 8,000.00 100% $ 8,000.00 $ -
23 1.5"Water Service,>15 ft(avg length=48 ft)(4"Line) EA 8 $ 1,200.00 $ 9,600.00 100% $ 9,600.00 $ -
24 2"Blowoff Assembly,complete in place EA 2 $ 1,000.00 $ 2,000.00 100% $ 2,000.00 $ -
25 Connect to Existing 4"Water Line EA 2 $ 1,000.00 $ 2,000.00 100% $ 2,000.00 $ -
26 Waterline Testing LS 1 $ 1,000.00 $ 1,000.00 100% $ 1,000.00 $ -
Water Construction Items Subtotal $ 43,968.00 Remaining Subtotal $ -
Page 1 of 2
FOR OFFIC USE :3,y ,
CASE NO.: l�J•C
*ff
DATE SUBMITTED: 1 118411111
TIME: .' I
CITY OF COW STATION
Home of Texas A6M University' STAFF: L5----)
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
Incomplete Project Submittal -documents needed to complete an application. Case No.:
❑X Existing Project Submittal. Case No.: 15-00900059
Project Name CASTLEGATE II SUBDIVISION- SECTION 106
Contact Name JOE SCHULTZ, P.E. Phone Number 979.764.3900
We are transmitting the following for Planning & Development Services to review and comment (check all that apply):
I Comprehensive Plan Amendment n Non-Residential Architectural Standards
Rezoning Application n Irrigation Plan
n Conditional Use Permit n Variance Request
❑ Preliminary Plan n Development Permit
❑X Final Plat ] Development Exaction Appeal
❑ Development Plat n FEMA CLOMA/CLOMR/LOMA/LOMR
I I Site Plan x Grading Plan
n Special District Site Plan n Other- Please specify below
❑ Special District Building /Sign Civil Construction Plans
Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
I I Comprehensive Plan Amendment 0 Waterline Construction Documents
TxDOT Driveway Permit Sewerline Construction Documents
TxDOT Utility Permit 0 Street Construction Documents
x Drainage Letter or Report _ Easement Application
IXI Fire Flow Analysis ❑ Other- Please specify
Special Instructions:
10/10 Print Form
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
March 18, 2015
Jessica Bullock
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Castlegate II Sec 106 (FP) - (15-00900059)
Dear Ms. Bullock:
Attached are the following items for the project referenced above:
• One (1) 24"x 36" copy of the revised Final Plat
• Thirteen(13) 11"x17" copies of the revised Final Plat
• One(1) 24"x 36" copy of the grading and erosion control plan
• Two (2) sets of the revised construction documents
• One(1) copy of the revised Engineer's Estimate
• One (1) copy of the Drainage Report
• Response to Staff Comments
If you have any questions,please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
I '
Joe S•1 ltz, P.E.
Manager(Civil Engineer)
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
:9)0
M / A))11 - -
Schultz Engineering, L
roipci
Office: 979.764.3900
Fax: 979.764.3910
September 21, 2015
Jessica Bullock
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: Castlegate II Sec 106 (FP) - (15-00900059)
Dear Ms. Bullock:
Attached are the following items for the project referenced above:
• Mylar original of the Final Plat
• CAD file of plat on a CD
• A check for$27,500 for the Parkland Dedication
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
AtiajaktJoe S I ultz, P.E.
Manager/Civil Engineer
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
Cash Register Receipt Receipt Number
City of College Station R4771
CM'OF COLLEGE STA11OiN
DESCRIPTION I ACCOUNT I QTY I PAID
ProjectTRAK $27,500.00
FP2015-900059 Address: 2600 HAILES CT Apn: 005401-0025-0000 $27,500.00
COMMUNITY PARK A(MULTI-FAMILY)DEVELOPMENT $27,500.00
COMMUNITY PARK A(MULTI FAMILY)
DEVELOPMENT *NONE* $27,500.00