Loading...
HomeMy WebLinkAboutStaff Review 4,91414 CITY OF CO.I.FGE STATION Home of Texas A&M University` MEMORANDUM DATE: March 19, 2015 TO: Rabon Metcalf, RME Consulting Engineers, via; rabon(c�rmengineer.com FROM: Rachel Lazo, Planning Technician SUBJECT: COLLEGE VISTA LOTS 4A&5A, BLK H (FP-MINO Staff reviewed the above-mentioned final plat as requested. Please submit the following information and address the attached list of staff review comments: X One (1) 24"x36" copy of the revised final plat; X One (1) Mylar original of the revised final plat (required after Staff approval); and X One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal(a�cstx.gov. Upon receipt of the required documents, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after Staff approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at(979) 764-3570. Attachments: Staff Review Comments PC: Trenton L. Owens, via USPS; 2311 Morningside Drive, Bryan Texas, 77802 P&DS Project No. 15-00900068 Planning er Development Services 1).O. EIOv 096(1 • 1 101 TEXAS AVENUE. •COI.I.F.GF STATION •'11-XAS • 8=+2, 111.. 35-0 • FAX. 9-9.'64.3496 cstx.gov/devservices STAFF REVIEW COMMENTS NO. 1 Project: College Vista Lots 4A&5A, BIk H (FP-MINOR) (15-00900068) PLANNING 1. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. None. 2. Please remove Note #6 from plat. Duplex landscaping requirements will apply. Revised accordingly. 3. Add note indicating existing zoning. Revised accordingly. 4. Change all references of Lots 4A&5A to say Lots 4R&5R. Revised accordingly. 5. Please remove all survey data from plat (structures, etc.); original plat should look how the current plat on file exists. Revised accordingly. Reviewed by: Rachel Lazo Date: March 19, 2015 ENGINEERING COMMENTS NO. 1 1. Provide an additional 4' foot PUE at the rear of the lots totaling a 10' rear PUE. Revised accordingly. 2. Please show existing sewer and water service lines for Lot 5A, Block H. Revised accordingly. Please note that the sewer service locations are approximate. Please also not that I no longer believe that the new sewer service for existing Lot 4A will be required. 3. Due to Utility Note # 6, Improvement # 4 appears to be built by open cut. Please change it to Bore method instead. Revised accordingly. 4. After talking to Stephen with Utility and seeing how the main is a 2" line. A service saddle might damage the existing 2" line during installation. A tee would need to be installed instead of a service saddle, and then have a ball valve prior the crossing of the street. This would make the current detail W7-00 not accurate. Revised accordingly. 5. Also regarding improvement note 4, it's stating a short side. I believe anything longer than 15' would be considered a "long" service line. Revised accordingly. 6. Add a note that the curb cuts on Ash Street need to be repaired when they're building the new driveway between the two lots. Revised accordingly. 7. FYI... An existing shed appears to be on top of the PUE which needs to be relocated if it is not planned to be demolished with the buildings. Understood. Please also see Plat Note #6. Reviewed by: Kevin Ferrer Date: March 18, 2015 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez(a�cstx.gov , sweidoa,cstx.gov , or wdavis(c�cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 4. The following easements will be required: • 5' PUE along Ash Street, for future street lighting. Revised accordingly. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: March 5, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: March 9, 2015 FIRE 1. Fire is ok with this project. Reviewed by: Steve Smith/Raymond Olson Date: March 19, 2015 ` FOR OFFICE USE ONLYf,^ CASE NO.: c5—' W DATE SUBMITTED: If.)";* l5 CITY OF COIJJ?Gli STATION TIME: �; 0 Home of Texas AerM University' STAFF: Pst'S PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Incomplete Project Submittal-documents needed to complete an application. Case No.: [Jf Existing Project Submittal. Case No.: Project Name C,0 1 1 eG�e Vi Sk2 Lo-A-5 9- /� + �j 131 k' Pr Contact Name �J Phone Number We are transmitting the following for Planning & Development Services to review and comment(check all that apply): ❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards ❑ Rezoning Application ❑ Irrigation Plan ❑ Conditional Use Permit ❑ Variance Request ❑ Preliminary Plan n Development Permit ® Final Plat ❑ Development Exaction Appeal ❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR ❑ Site Plan ❑ Grading Plan ❑ Special District Site Plan ❑ Other- Please specify below ❑ Special District Building/Sign ❑ Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Comprehensive Plan Amendment ❑ Waterline Construction Documents ❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents ❑ TxDOT Utility Permit ❑ Street Construction Documents ❑ Drainage Letter or Report ❑ Easement Application n Fire Flow Analysis I Other- Please specify Special Instructions: 10/10 printForm,-, G.rir CITY OF COI.t FGE STATION Home of Texas A&M University" MEMORANDUM DATE: March 19, 2015 TO: Rabon Metcalf, RME Consulting Engineers, via; rabon(a�rmengineer.com FROM: Rachel Lazo, Planning Technician SUBJECT: COLLEGE VISTA LOTS 4A&5A, BLK H (FP-MINO Staff reviewed the above-mentioned final plat as requested. Please submit the following information and address the attached list of staff review comments: X One (1) 24"x36" copy of the revised final plat; X One (1) Mylar original of the revised final plat (required after Staff approval); and X One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal(c@cstx.gov. Upon receipt of the required documents, your project will be considered formally filed with the City of College Station. Please note that this application will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. Please note that a Mylar original of the revised final plat will be required after Staff approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at (979) 764-3570. Attachments: Staff Review Comments PC: Trenton L. Owens, via USPS; 2311 Morningside Drive, Bryan Texas, 77802 P&DS Project No. 15-00900068 Planning e 'Development Services P.O. BOX 9060 • 1 101 TEXAS AVENUE •C011 FOE STAT]C)N •TEAS •77842 FEl.9,9.,6 x.3570 • FAX. 979.764.3496 cstx.gov/devsenrices STAFF REVIEW COMMENTS NO. 1 Project: College Vista Lots 4A&5A, Blk H (FP-MINOR) (15-00900068) PLANNING 1. Please note that any changes made to the plans that have not been requested by the City of College Station, must be explained in your next transmittal letter. None. 2. Please remove Note #6 from plat. Duplex landscaping requirements will apply. Revised accordingly. 3. Add note indicating existing zoning. 4. Change all references of Lots 4A&5A to say Lots 4R&5R. Revised accordingly. 5. Please remove all survey data from plat (structures, etc.); original plat should look how the current plat on file exists. Revised accordingly. Reviewed by: Rachel Lazo Date: March 19, 2015 ENGINEERING COMMENTS NO. 1 1. Provide an additional 4' foot PUE at the rear of the lots totaling a 10' rear PUE. Revised accordingly. 2. Please show existing sewer and water service lines for Lot 5A, Block H. Revised accordingly. Please note that the sewer service locations are approximate. Please also not that I no longer believe that the new sewer service for existing Lot 4A will be required. 3. Due to Utility Note # 6, Improvement # 4 appears to be built by open cut. Please change it to Bore method instead. Revised accordingly. 4. After talking to Stephen with Utility and seeing how the main is a 2" line. A service saddle might damage the existing 2" line during installation. A tee would need to be installed instead of a service saddle, and then have a ball valve prior the crossing of the street. This would make the current detail W7-00 not accurate. Revised accordingly. 5. Also regarding improvement note 4, it's stating a short side. I believe anything longer than 15' would be considered a "long" service line. Revised accordingly. 6. Add a note that the curb cuts on Ash Street need to be repaired when they're building the new driveway between the two lots. Revised accordingly. 7. FYI... An existing shed appears to be on top of the PUE which needs to be relocated if it is not planned to be demolished with the buildings. Understood. Please also see Plat Note #6. Reviewed by: Kevin Ferrer Date: March 18, 2015 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinezCa�cstx.gov , sweido@cstx.gov , or wdavis@cstx.gov 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. 3. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. 4. The following easements will be required: • 5' PUE along Ash Street, for future street lighting. Revised accordingly. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other device, per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design, Pull boxes and secondary pedestals provided by CSU. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, or Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: March 5, 2015 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: March 9, 2015 FIRE 1. Fire is ok with this project. Reviewed by: Steve Smith/Raymond Olson Date: March 19, 2015