HomeMy WebLinkAboutStaff Comments , "of .'"'' ''''''''-'''''4.
* , m.,,
CITY OF COLIT,GF,STATION
Home of Texas A&M University®
0)0
MEMORANDUM
DATE: March 19, 2015
TO: Rabon Metcalf, RME Consulting Engineers, via; rabon@rmengineer.com
FROM: Rachel Lazo, Planning Technician
SUBJECT: COLLEGE VISTA LOTS 4A&5A, BLK H (FP-MING)
Staff reviewed the above-mentioned final plat as requested. Please submit the following
information and address the attached list of staff review comments:
One (1) 24"x36" copy of the revised final plat;
One (1) Mylar original of the revised final plat (required after Staff approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
pdsdigitalsubmittal a(�cstx.gov.
Upon receipt of the required documents, your project will be considered formally filed with the
City of College Station. Please note that this application will expire in 90 days from the date of
this memo, if the applicant has not provided written response comments and revised documents
to the Administrator that seek to address the staff review comments contained herein.
Please note that a Mylar original of the revised final plat will be required after Staff approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at (979) 764-3570.
Attachments: Staff Review Comments
PC: Trenton L. Owens, via USPS; 2311 Morningside Drive, Bryan Texas, 77802 i
P&DS Project No. 15-00900068
Planning dr Development Services
P.O.BOX 996() • 1 101"11XAS AVL i 1E •COI s LATION • 1 LXAS •778,12
PFI.979.7 64.3s70• FAX 9'9.764.3496
cstx.gov/devservi ces
STAFF REVIEW COMMENTS NO. 1
Project: College Vista Lots 4A&5A, Blk H (FP-MINOR) (15-00900068)
PLANNING
1. Please note that any changes made to the plans that have not been requested by the City of
College Station, must be explained in your next transmittal letter.
2. Please remove Note#6 from plat. Duplex landscaping requirements will apply.
"i 3. Add note indicating existing zoning.
4. Change all references of Lots 4A&5A to say Lots 4R&5R.
5. Please remove all survey data from plat (structures, etc.); original plat should look how the
current plat on file exists.
Reviewed by: Rachel Lazo Date: March 19, 2015
ENGINEERING COMMENTS NO. 1
1. Provide an additional 4' foot PUE at the rear of the lots totaling a 10' rear PUE.
2. Please show existing sewer and water service lines for Lot 5A, Block H.
3. Due to Utility Note # 6, Improvement # 4 appears to be built by open cut. Please
change it to Bore method instead.
4. After talking to Stephen with Utility and seeing how the main is a 2" line. A
service saddle might damage the existing 2" line during installation. A tee would
need to be installed instead of a service saddle, and then have a ball valve prior
the crossing of the street. This would make the current detail W7-00 not
accurate.
5. Also regarding improvement note 4, it's stating a short side. I believe anything
longer than 15' would be considered a "long" service line.
6. Add a note that the curb cuts on Ash Street need to be repaired when they're
building the new driveway between the two lots.
7. FYI... An existing shed appears to be on top of the PUE which needs to be
relocated if it is not planned to be demolished with the buildings.
Reviewed by: Kevin Ferrer Date: March 18, 2015
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN/PLAT: Developer will provide CSU with a digital, AutoCAD dwg format,
version of plat and / or site plan as soon as it is available. Email to:
gmartinez(a)cstx.gov , sweido(cr�.cstx.gov , or wdaviscstx.gov
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available.
This information is critical for CSU to accurately determine the size and number of
transformers, and other equipment, required to provide service to the project. Failure
to provide load data will result in construction delays and, due to clearance
requirements, could affect the final building footprint. Delivery time for transformers
and other equipment not in stock is approximate 26 weeks.
3. If easements are existing, the developer will be responsible for locating easements
on site to insure that electrical infrastructure is installed within easement boundaries.
4. The following easements will be required:
• 5' PUE along Ash Street, for future street lighting
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs
riser.
4. Developer will intercept existing conduit at designated transformers or other existing
devices and extend as required.
5. If conduit does not exist at designated transformer or other existing devices,
developer will furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or
other device, per CSU specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design,
Pull boxes and secondary pedestals provided by CSU.
8. Final site plan must show all proposed electrical facilities necessary to provide
electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations,
and conduit routing as designed by CSU.
9. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255, Sam Weido at 979.764.6314, or Weldon Davis at 979.764.5027.
Reviewed by: Weldon Davis Date: March 5, 2015
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: March 9, 2015
FIRE
1. Fire is ok with this project.
Reviewed by: Steve Smith/Raymond Olson Date: March 19, 2015
CITY OF COLLEGE STATION
Home of Texas A&M University"
MEMORANDUM
DATE: March 5, 2015
TO: Rabon Metcalf, RME Consulting Engineers, via; rabon@rmengineer.com J
FROM: Rachel Lazo, Planning Technician
SUBJECT: COLLEGE VISTA LOTS 4A&5A, BLK H (FP-MINOR)
Thank you for the submittal of your Final Plat - Minor or Amending application. Kevin Ferrer,
Graduate Engineer, and I have been assigned to review this project. It is anticipated that the
review will be completed and any staff comments returned to you on or before Thursday, March
19, 2015. If you have questions in the meantime, please feel free to contact us.
PC: Trenton L. Owens, via USPS; 2311 Morningside Drive, Bryan Texas, 77802
P&DS Project No. 15-00900068
Planning ea''Development Services
Y.O.BOX 9960 • 1101 TEXAS AVENUE •COLLEGE I S'T'ATION •TEXAS •77842
TEL. 979.764.3570 FAX. 971).764.3496
cs tx.govld evs a rvi c e s