HomeMy WebLinkAboutStaff Comments FOR OFFICE USE ONLY
Grffill141
CASENO.: IS— (P9—
DATE SUBMITTED: 03'31. IS
CITY OF COLLEGE STATION TIME: $'. I S
Home of Texas A&M University' STAFF: Au
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
❑ Incomplete Project Submittal-documents needed to complete an application. Case No.:
❑x Existing Project Submittal. Case No.: 15-00900064
Project Name ROANS CHAPEL COMMERCIAL SUBDIVISION(FP)
Contact Name Kenn Walsh Phone Number 979.774.3600
We are transmitting the following for Planning & Development Services to review and comment(check all that apply):
❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
❑ Rezoning Application ❑ Irrigation Plan
❑ Conditional Use Permit ❑ Variance Request
❑ Preliminary Plan ❑ Development Permit
X❑ Final Plat ❑ Development Exaction Appeal
❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan ❑ Grading Plan
❑ Special District Site Plan X❑ Other-Please specify below
❑ Special District Building/Sign Construction Documents, Engineer's Estimate,
❑ Landscape Plan BTU Correspondence, Approval Letter
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑ Comprehensive Plan Amendment Waterline Construction Documents
❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
❑ Drainage Letter or Report ❑ Easement Application
❑X Fire Flow Analysis ❑ Other- Please specify
3 - LI'VtLS
Special Instructions:
10/10
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
March 30, 2015
Mark Bombek
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: ROANS CHAPEL COMMERCIAL SUBDIVISION (FP) - (15-00900064)
Dear Mr. Bombek:
Attached are the following items for the project referenced above:
• Two (2) 24"x 36" copies of the revised Final Plat
• Two (2) sets of the revised construction documents
• One(1) copy of the revised Engineer's Estimate
• One(1) copy of the Water Report
• BTU Correspondence
• Wickson Creek Approval Letter
• Response to Staff Comments
If you have any questions, please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
Deven Doyen, P.E.
Civil Engineer
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
1
Staff Review Comments No. 1
Project: Roans Chapel Commercial Subdivision (FP) — 15-00900064
PLANNING
1. The Certificate of the City Planner should be changed out for the Certificate of the
Planning and Zoning Commission. The city planner certification has been replaced with
the planning and zoning commission certification.
2. In the Certificate of Ownership, Please add the Owner(s) under the lines provided for the
owner signature. Owner information has been added to the Certificate of Ownership.
3. For the Curve Table, are there chord lengths labeled as C3, C4, C6, and C7? If not, please
renumber labels to be in numerical order. The curves have been renumbered.
4. Please note that you, the applicant, are responsible for scheduling the plat for
consideration by the County Commissioner's Court and for getting the County Judge's
signature on the Mylar after they approve the plat. Noted
5. Please note that any changes made to the plans, which have not been requested by the
City of College Station, must be explained in your next transmittal letter. Any additional
changes on these plans that the City has not been made aware of will constitute a
completely new review. Noted.
Reviewed by: Mark Bombek Date: 03-14-2015
BRAZOS COUNTY
1. Duplicate Certificate of Ownership & Dedication- please correct. There are two owners
for this property.
2. Duplicate Certificate of Notary- please correct. There are two owners for this property.
3. Certificate of Surveyor is inconsistent with Surveyor of record in Title Block- please
correct Certificate of surveyor has been revised
4. Provide Approval from Brazos Health District.Approval will be provided.
5. Provide letter of available capacity from water supplier.A letter will be provided.
Reviewed by: Alan Munger Date: 03-11-2015
ENGINEERING COMMENTS NO. 1
4. Move "Detention Area" from lot 6 out of the proposed 20' PUE on Final Plat and
Construction Document.Detention area has been relocated.
-2' Relabel "Detention Area" to "Common Area" or "Private Drainage Easement." Per our
phone conversation the "Detention Area"labels will remain.
X Add a note on the Final Plat stating that fences, grading, and landscape cannot impede the
flow of the private drainage easement.Note 30 has been added.
Add a note on final plat and construction documents regarding requirement for
compaction of fill or engineered slab for affected lots that have greater than 2 feet of fill.
Also list any lot that would require this.Note 31 has been added
sl Are there any restriction on the pipe easement that would not allow the PUE dedication
on top of their easement? There are no restrictions on the pipeline easement that would
not allow the PUE dedication.
•(f Does lot 1 going to have sufficient room for a building & a septic system? Since the pipe
easement is taking up most of the lot. Yes, lot 1 has sufficient room.
Provide written documentation that the pipe line company has given consent for the
encroachment and proposed construction documents. We are working with the pipeline
company regarding the proposed improvements.
XPlease show where the ROW utility lines are being relocated on the construction
documents. FYI... additional easement may be required depending on the pole spacing
with the water line. The BTU lines have been added to the construction document BTU
and Wickson SUD HWE are fine with Easement provided
A. A letter/correspondence from the Utility company (BTU?) approving the relocation.
Correspondence with BTU regarding the relocation is attached.
A Utility installation request for State Highway 30 is going to be required. FYI... We're
not the end operator, Wickson Creek SUD would have to ultimately submit the UIR to
TxDOT. We are working with Wickson SUD on the UIR.
j-1. Relocate the gate valve on the 12" crossing the 6" line to the opposite site. So that future
maintenance on the 12" casing does not affect the serviceability of the area. A 12"gate
valve has been added.
y2. Please provide clarification for Table 1 of the water report/letter. It is currently confusing.
Fire hydrant flow test were run and attached is a Water Report.
Seeing how the 6"parallel of SH 30 becomes a 2.5"line east of Roans Chapel, Is this line
going to be able to handle the flows during an event when the Fire Hydrants are being
used? Or is the Water tank that is feeding this line located northwest of Roans Chapel?
Yes, the system is fed from both directions.
X. Please provide a sealed engineer cost estimate. Attached is a copy of the engineer
estimate.
Reviewed by: Kevin Ferrer Date: March 16, 2015
SANITATION
1. Sanitation is ok with this project. Noted
Reviewed by: Wally Urrutia Date: March 4, 2015
` FOR OFFIC USE ONLY
(
Airlff
CASE NO.:
DATE FOR
• 21111L.
CITY OF COLLEGE STATION TIME:
Home of Texas A&M University' STAFF: ! ,,
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
❑ Incomplete Project Submittal -documents needed to complete an application. Case No.:
❑X Existing Project Submittal. Case No.: 15-00900064 ,x�� clott(.04
,
Project Name ROANS CHAPEL COMMERCIAL SUBDIVISION(FP)
Contact Name Kenn Walsh Phone Number 979.774.3600
We are transmitting the following for Planning & Development Services to review and comment(check all that apply):
❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
❑ Rezoning Application ❑ Irrigation Plan
❑ Conditional Use Permit ❑ Variance Request
❑ Preliminary Plan ❑ Development Permit
❑x Final Plat ❑ Development Exaction Appeal
❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan ❑ Grading Plan
❑ Special District Site Plan ❑X Other-Please specify below
❑ Special District Building /Sign Final Play Mylar
❑ Landscape Plan Water Record Drawings
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑ Comprehensive Plan Amendment ❑x Waterline Construction Documents
❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
❑ Drainage Letter or Report ❑ Easement Application
❑x Fire Flow Analysis ❑ Other- Please specify
Special Instructions:
10/10fC,1
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
August 3, 2015
Kevin Ferrer
Graduate Civil Engineer
City of College Station
1101 Texas Avenue
College Station,TX 77840
Roans Chapel Commercial Subdivision, Brazos County, Texas (15-00900064)
Dear Mr. Ferrer:
Attached are the following items for the project referenced above:
• CD with a PDF of the Mylar Final Plat and copy of the Final plat CAD
drawing.
• 24"x 36"Signed Mylar Final Plat
• Two (2) copies of 24" x 36" Water Record Drawings
Please let me know if you have any questions or need additional information.
Very truly yours,
Schultz Engineering,LLC.
/.31111
Deven Doyen, P.E.
Civil Engineer
Attachments
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
FOR OFFIE USE ONLY
fr
CASENO.:
DATE SUBMITTED: miGird
CITY OF COLLEGE STATION TIME:
Home of Texas A&M University' STAFF: R
PLANNING & DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Please check one of the options below to clearly define the purpose of your submittal.
❑ New Project Submittal
❑ Incomplete Project Submittal-documents needed to complete an application. Case No.:
❑ Existing Project Submittal. Case No.: 15-00900064
Project Name ROANS CHAPEL COMMERCIAL SUBDIVISION(FP)
Contact Name Kenn Walsh Phone Number 979.774.3600
We are transmitting the following for Planning & Development Services to review and comment(check all that apply):
❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards
❑ Rezoning Application ❑ Irrigation Plan
❑ Conditional Use Permit ❑ Variance Request
❑ Preliminary Plan ❑ Development Permit
X❑ Final Plat ❑ Development Exaction Appeal
❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR
❑ Site Plan ❑ Grading Plan
❑ Special District Site Plan x❑ Other-Please specify below
❑ Special District Building/Sign Construction Documents, Engineer's Estimate
❑ Landscape Plan
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
❑ Comprehensive Plan Amendment x❑ Waterline Construction Documents
❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents
❑ TxDOT Utility Permit ❑ Street Construction Documents
❑ Drainage Letter or Report ❑ Easement Application
❑ Fire Flow Analysis ❑ Other- Please specify
Special Instructions:
1oilo a,
Schultz Engineering, LLC
Office: 979.764.3900
Fax: 979.764.3910
April 23, 2015
Mark Bombek
Staff Planner
City of College Station
1101 Texas Avenue
College Station, TX 77840
Re: ROANS CHAPEL COMMERCIAL SUBDIVISION (FP) - (15-00900064)
Dear Mr. Bombek:
Attached are the following items for the project referenced above:
• One (1) 24"x 36" copy of the revised Final Plat; and
• Thirteen(13) 11"x 17" copies of the revised Final Plat
• Three(5) copies of the construction plans
If you have any questions,please do not hesitate to call.
Sincerely,
Schultz Engineering, LLC.
Deven Doyen, Pt.
Civil Engineer
P.O. Box 11995 • College Station,Texas 77842
schultzengineeringllc.com
Staff Review Comments No. 2
Project: Final Plat- Roans Chapel Commercial Subdivision.
PLANNING COMMENTS NO. 2
1. No further comments. Noted.
Reviewed by: Mark Bombek Date: April 10, 2015
ENGINEERING COMMENTS NO. 2
2. Please double check the sealed estimate, the 6" gate valves appear to be missing. Please
revise and resubmit sealed estimate.A revised engineer's estimate is attached.
3. Please provide a written documentation or correspondence with the pipe line company
regarding the proposed design over their easement once you guys worked everything out.
Attached is the correspondence with the pipeline company to date.
4. Are you guys planning to Bond or build infrastructure first? We are unsure at this time if
the owner is going to bond or build the infrastructure first.
5. One more item,the contractor needs to submit his NOI to the MS4 Operator. Is the County
the Operator?Noted.
Reviewed by: Kevin Ferrer Date: April 10, 2015
From: DiNorscia,Dianna
To: peven Doyen;Gunderman,Taylor
Cc: Waterwall.Celeste
Subject: RE:Roans Chapel Commercial Subdivision
Date: Thursday,March 19,2015 5:55:10 PM
Attachments: image002.onq
Deven,
Thanks for sending the attachments. I appreciate your help.
Dianna
Dianna DiNorscia
Energy Transfer PartnerslHPL
(o) 713-989-2831
(c) 713-503-9063
(f) 713-989-1136
dianna.dinorscia@energytransfer.com
From: Deven Doyen [mailto:deven@schultzengineeringllc.com] �
Sent:Thursday, March 19, 2015 5:25 PM
To: DiNorscia, Dianna; Gunderman,Taylor
Cc: Waterwall, Celeste
Subject: RE: Roans Chapel Commercial Subdivision
Dianna,
Attached are the files for Roans Chapel.
Thanks,
Deven
From: DiNorscia, Dianna Jmailto:Dianna.DiNorscia(energytransfer.coml
Sent:Thursday, March 19, 2015 4:59 PM
To:Gunderman,Taylor
Cc:devenPschultz.engineeringlic.com; Waterwall, Celeste
Subject: FW: Roans Chapel Commercial Subdivision
Taylor,
This has been added to the DL — Project #15123 and assigned to you.
Guinan,Taylor
Energy Transfer Partners,LLC
Project Manager
Engineering
)281)8324394 Mobile
Taylor.Gundennaneenercgytransfer.c...
1340 Main Street
Houston,TX 71002
Taylor.Gunderiiian@ enertgytransf er,C...
Please contact Deven Doyen with project status.
Also, see email below I sent to John regarding attachments. I will
forward plans and final plat to you as soon as I receive them.
Thanks,
dd
Dianna DiNorscia
Energy Transfer Partners/HPL
(o) 713-989-2831
(c) 713-503-9063
(f) 713-989-1136
dianna.dinorscia@energytransfer.com
From: DiNorscia, Dianna
Sent:Thursday, March 19, 2015 4:42 PM
To: Stevenson,John; 'Deven Doyen'
Subject: RE: Roans Chapel Commercial Subdivision
John,
Email below says there are attachments. I did not get any attachments
with your email. Please send them to me if you have them.
Thanks,
dd
Dianna DiNorscia
Energy Transfer Partners/HPL
(o) 713-989-2831
(c) 713-503-9063
( 713-989-1136
dianna.dinorscia@energytransfer.com
From: Stevenson,John
Sent:Thursday, March 19, 2015 1:14 PM
To: 'Deven Doyen'; DiNorscia, Dianna
Subject: RE: Roans Chapel Commercial Subdivision
Dianna, please add to the report and assign to a PM.
Thank you,
John D.Stevenson
Project Manager
Energy Transfer/Houston Pipe Line Company LP
1300 Main Street 13 Floor
Houston, Texas 77002
Office:713-989-2833
Cell:713-292-8949
Fax:713-988-1136
john,stevensonPenergvtransfer.corn
From: Deven Doyen jmailto:devenOschultzengineeri gllc.comj �
Sent:Thursday, March 19, 2015 12:55 PM
To: Stevenson,John
Subject: Roans Chapel Commercial Subdivision
John,
We have a new project that will be crossing one of your pipelines. It is in Brazos County off of SH
30. We are proposing an 8" water line cross your pipeline easement, see the attached plans and
Final Plat. Please, let me know who we need to contact to get this crossing reviewed.
Thanks,
Deven Doyen, P.E.
Civil Engineer
2730 Longmire Drive,Suite A
College.Station, TX 77845
(979)764-3900—Office
(979)764-3910—Fax
deven(aschultzengineeringlic.com
Private and confidential as detailed here. If you cannot access hyperlink,please e-mail sender.
Private and confidential as detailed here. If you cannot access hyperlink,please e-mail sender.