HomeMy WebLinkAboutFire Flow Report Fire Flow Analysis Report
for
ROANS CHAPEL COMMERCIAL SUBDIVISION
College Station, Brazos County, Texas
March 2015
Prepared By:
Schultz Engineering, LLC
TBPE Firm Registration No. 12327
2730 Longmire, Suite A
College Station, Texas 77845
979.764.3900
•• *:� o :* w
DEVEN L. DOYEN 41
109835
I
•+...0
' 330/ s---
FIRM
FIRM # 12327
SCHULTZ ENGINEERING, LIS;
General Information
Location: The Roans Chapel Commercial Subdivision is an 8.123-acre
commercial subdivision being developed immediately southwest of
the existing intersection of State Highway 30 & Roans Chapel
Road in Brazos County, Texas. The Final Plat shows a total of 6
lots in this section.
Primary Water Supply: An existing 12" line running along State Highway 30.
Land Use: Commercial
Design Criteria/Analysis
Primary Water Supply: Existing 12"water line along SH 30.
Existing System Pressure Tests:
Flow Hydrant - See Exhibit B
Flowrate: 1,131 gpm
Static Pressure: 85 psi
Residual Pressure: 78 psi
Exhibits: Exhibit A—Water Layout
Exhibit B—Wickson Creek SUD Flow Test Report
Exhibit C—Pipe &Junction Analysis Summary—Domestic Flow
Exhibit D—Pipe& Junction Analysis Summary—Fire Flow
Domestic Use 16.6 gpm per lot
Total Domestic Demand= 100 gpm
The proposed 8" & 12"waterlines are in accordance with the BCS
Water Design Guidelines. This report provides the results of the
water system analysis under the fire flow and domestic demand
requirements, (2600 gpm) which produced the lowest pressure in
the system.
Water System Summary
Summary of Calculations
w/Minimum Required Line Sizes
Domestic Demand Pressure Min. 78.5 psi
Velocity Max. 3.94 fps
Fire Flow and Domestic Pressure Min. 45.9 psi
Demand Velocity Max. 7.38 fps
As shown above the system exceeds the minimum required
pressures of 35 psi for domestic flow and 20 psi for fire flow in
both analyses. The maximum velocity of 7.38 fps is less than the
required maximum of 12 fps.
Conclusion
The proposed water lines and fire hydrants provide the required
fire flow. The proposed 8" & 12"waterlines meet or exceed all of
the design criteria for the City of College Station and Brazos
County. They will provide adequate water pressure, flowrate and
velocity for domestic demands and fire flow.
EXHIBIT A
WATER LAYOUT
EXHIBIT B
WICKSON CREEK SUD FLOW TEST REPORT
EX HraCer B
F -4. y
lir
•
8 ��` fxc�
♦OM1, --'-,-,,,,_,,,,,,:r.---
#'.. 35+ Fhxn
3/4
S'�; y v.
�- bO -
y ,
4.qq 40V \**0 ' ,k, ,
- .,-
•
!jw
1
•
tiJ
S'',b
04,
ft4 -
ea
04, �� �4�
�koO
�ti
cb
wA a.�J '1'b 2
3
�4,,4/':,... .,'''''
,r 4 Off'
•L
MC. l
$ 4
' ,s 4,
C
y�� __,7. 021 S3N4 NNl1NI
1
EXHIBIT C
PIPE & JUNCTION ANALYSIS - DOMESTIC FLOW
Exhibit C
WaterCAD Analysis Summary
Pipe Analysis- Domestic Demand
Pipe Hazen- Flow Velocity
Number Length (ft) Size (in) Material Williams C (gpm) (ft/s)
P-1 3,607 12 PVC 150 -1,289 3.66
P-2 8,973 12 PVC 150 -1,389 3.94
P-3 526 12 PVC 150 100 0.28
P-4 289 12 PVC 150 100 0.28
P-5 291 12 PVC 150 100 0.28
P-7 23 12 PVC 150 1,389 3.94
P-res 21 12 PVC 150 -1,289 3.66
WaterCAD Analysis Summary
Junction Analysis- Domestic Demand
Junction
Junction Elevation Demand Pressure
(gpm) (psi)
FH 12633 298 0 79.8
J-2 311 0 79.1
FH 10187 330 0 84.7
FH-1 312 0 78.6
FH-2 312.39 0 78.5
J-6 312 100 78.6
EXHIBIT D
PIPE & JUNCTION ANALYSIS - FIRE FLOW
Exhibit D
WaterCAD Analysis Summary
Pipe Analysis- Fire Flow Demand (FH-1 FH-2)
Pipe Hazen- Flow Velocity
Length (ft) Size (in) Material
Number Williams C (gpm) (ft/s)
P-1 3,607 12 PVC 150 1,380 3.91
P-2 8,973 12 PVC 150 -1,220 3.46
P-3 526 12 PVC 150 2,600 7.38
P-4 289 12 PVC 150 1,350 3.83
P-5 291 12 PVC 150 100 0.28
P-7 23 12 PVC 150 1,220 3.46
P-res 21 12 PVC 150 1,380 3.91
WaterCAD Analysis Summary
Junction Analysis- Fire Flow Demand (FH-1 FH-2)
Junction
Junction Elevation
Demand Pressure
(gpm) (psi)
FH 12633 298 0 60.6
J-2 311 0 49.5
FH 10187 330 0 52.2
FH-1 312 1,250 46.5
FH-2 312.39 1,250 45.9
J-6 312 100 46
SCHULTZ ENGINEERING,LLC.
2730 Longmire Drive,Suite A
College Station,Texas 77845
Firm No.12327
4/22/2015
Roans Chapel Final Plat
Engineer's Estimate for
Public Infrastructure Construction Improvements
Item Description Unit Estimated Unit Price Total
Quantity
1 Mobilization,Overhead,General Conditions&Construction Staking LS 1 $ 7,500.00 $ 7,500.00
2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,500.00 $ 1,500.00
Filter Dam,etc.,complete in place
3 Hydromulch&Seeding,complete in place SY 2,874 $ 0.60 $ 1,724.40
General Items Subtotal S 10,724.40
`!I1Ira}t!' Ii Ittu18,'
3 Connect to Existing 12"Water Line EA 1 S 2,500.00 S 2,500.00
4 Connect to Existing 6"Water Line EA 2 $ 1,500.00 $ 3,000.00
5 12"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 640 $ 48.00 $ 30,720.00
6 12"45°Bend,complete in place EA 2 $ 900.00 $ 1,800.00
7 12"22.5°Bend complete in place EA I $ 900.00 S 900.00
8 12"11.25°Bend,complete in place EA 1 S 900.00 S 900.00
9 12"M.J.Gate Valve,complete in place EA 4 $ 2,200.00 $ 8,800.00
10 l2"x 12"M.J.Tee,complete in place EA I $ 950.00 $ 950.00
II 12"x 6"Tee,complete in place EA 1 $ 900.00 $ 900.00
12 12"x 6"Cross,complete in place EA 1 $ 1,000.00 $ 1,000.00
13 12"x 8"Reducer,complete in place EA 1 S 900.00 S 900.00
l4 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 50 S 26.00 $ 1,300.00
15 6"45°Bend,complete in place EA 4 $ 750.00 $ 3,000.00
16 6"MO Gate Valve,complete in place EA 2 $ 1,000.00 $ 2,000.00
17 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 305 $ 32.00 $ 9,760.00
18 8"MJ Gate Valve,complete in place EA 1 S 1,500.00 $ 1,500.00
19 8"x 6"Tee,complete in place EA 1 S 750.00 $ 750.00
20 Fire Hydrant Assembly,complete in place EA 2 $ 3,500.00 $ 7,000.00
2l 1.5"Water Service-single,complete in place LF 2 S 1,000.00 $ 2,000.00
22 l.5"Water Service-double,complete in place LF 2 $ 1,250.00 S 2,.500.00
23 2"Blowoff Valve Assembly,complete in place EA 1 S 1,500.00 S 1,500.00
24 Bore&Install 20"Casing,complete in place LF 150 $ 120.00 S 18,000.00
25 12"Pipe-Locking Joint w/End Seals&Spacers,complete in place LF 160 S 80.00 S 12,800.00
26 Water Line Testing LS 1 $ 1,500.00 $ 1,500.00
Water Construction Items Subtotal $ 115980.00
General Items Subtotal S 10,724.40
Water Construction Items Subtotal S 115,980.00
TOTAL CONSTRUCTIONI$ 126,704.40
ill„Ir ,l. . �! •••
Ii *. • • •...
4. * \
•
C:F..VEN L. 1nyEN
101:98.55 l, ,I I� �
' L, .:.<.0.\ c 2Z
��IIII� V
FIRM hi 12327
Page1of1
SCHULTZ ENGINEERING,LLC.
2730 Longmire Drive,Suite A
College Station,Texas 77845
Firm No.12327
Roans Chapel Final Plat
Engineer's Estimate for
Public Infrastructure Construction Improvements
Item Description
Estimated
P Unit Quantity Unit Price Total
I Mobilization,Overhead,General Conditions&Construction Staking LS I S 7,500.00 $ 7,500.00
2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,500.00 S 1,500.00
Filter Dam,etc.,complete in place
3 Hydromulch&Seeding,complete m place SY 2,874 $ 0.60 $ 1,724.40
General Items Subtotal S 10,724,40
i �.,IS / ntiiE-'° r ��,>IitNr(o tst1'?IM1Et n .-'3 A ii r n 3 �. g ft
,��� ., .. ., .,,�,"y.., ��n c,. ,::: '�F, ... „/,,.Wim' ,, .
3 Connect to Existing 12"Water Line EA 1 $ 2,500.00 $ ,2,500.00
4 12"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 640 $ 45.00 $ 28,800.00
5 12"45°Bend,complete in place EA 2 S 600.00 S 1,200.00
6 12"22.5°Bend,complete in place EA 1 $ 600.00 $ 600.00
7 12"11.25°Bend,complete in place EA I S 600.00 $ 600.00
8 12"M.J.Gate Valve,complete in place EA 4 $ 2,200.00 S 8,800.00
9 12"x 12"M.J.Tee,complete in place EA 1 S 950.00 S 950.00
10 12"x 6"Tee,complete in place EA I $ 750.00 S 750.00
11 12"x 6"Cross,complete in place EA I $ 1,000.00 $ 1,000.00
12 12"x 8"Reducer,complete m place EA 1 $ 600.00 $ 600.00
13 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 305 S 30.00 S 9,150.00
14 8"MJ Gate Valve,complete in place EA I S 1,000.00 $ 1,000.00
15 8"x 6"Tee,complete in place EA 1 $ 500.00 S 500.00
16 Fire Hydrant Assembly,complete in place EA 2 $ 3,500.00 S 7,000.00
17 1.5"Water Service-single,complete in place LF 2 $ 1,000.00 $ 2,000.00
18 1.5"Water Service-double,complete in place LF 2 $ 1,250.00 S 2,500.00
19 2"Blowoff Valve Assembly,complete m place EA I $ 1,500.00 $ 1,500.00
20 Bore&Install 20"Casing,complete in place LF 150 $ 120.00 $ 18,000.00
2l 12"Pipe-Locking Joint w/End Seals&Spacers,complete in place LF 160 S 80.00 $ 12,800.00
22 Water Line Testing LS 1 S 1,000.00 $ 1,000.00
Water Construction Items Subtotal S 101,250.00
General Items Subtotal $ 10,724.40
Water Construction Items Subtotal S 101,250.00
TOTAL CONSTRUCTION'S 111,974.40
DEVEN ... DOYEN 74 1 15--
; ;, 109 33o
FIRM z 1232"
`-SCI-IUI..17 L.:NGI^di:F.:.RING, !..i..0
Page 1 of 1