Loading...
HomeMy WebLinkAboutFire Flow Report Fire Flow Analysis Report for ROANS CHAPEL COMMERCIAL SUBDIVISION College Station, Brazos County, Texas March 2015 Prepared By: Schultz Engineering, LLC TBPE Firm Registration No. 12327 2730 Longmire, Suite A College Station, Texas 77845 979.764.3900 •• *:� o :* w DEVEN L. DOYEN 41 109835 I •+...0 ' 330/ s--- FIRM FIRM # 12327 SCHULTZ ENGINEERING, LIS; General Information Location: The Roans Chapel Commercial Subdivision is an 8.123-acre commercial subdivision being developed immediately southwest of the existing intersection of State Highway 30 & Roans Chapel Road in Brazos County, Texas. The Final Plat shows a total of 6 lots in this section. Primary Water Supply: An existing 12" line running along State Highway 30. Land Use: Commercial Design Criteria/Analysis Primary Water Supply: Existing 12"water line along SH 30. Existing System Pressure Tests: Flow Hydrant - See Exhibit B Flowrate: 1,131 gpm Static Pressure: 85 psi Residual Pressure: 78 psi Exhibits: Exhibit A—Water Layout Exhibit B—Wickson Creek SUD Flow Test Report Exhibit C—Pipe &Junction Analysis Summary—Domestic Flow Exhibit D—Pipe& Junction Analysis Summary—Fire Flow Domestic Use 16.6 gpm per lot Total Domestic Demand= 100 gpm The proposed 8" & 12"waterlines are in accordance with the BCS Water Design Guidelines. This report provides the results of the water system analysis under the fire flow and domestic demand requirements, (2600 gpm) which produced the lowest pressure in the system. Water System Summary Summary of Calculations w/Minimum Required Line Sizes Domestic Demand Pressure Min. 78.5 psi Velocity Max. 3.94 fps Fire Flow and Domestic Pressure Min. 45.9 psi Demand Velocity Max. 7.38 fps As shown above the system exceeds the minimum required pressures of 35 psi for domestic flow and 20 psi for fire flow in both analyses. The maximum velocity of 7.38 fps is less than the required maximum of 12 fps. Conclusion The proposed water lines and fire hydrants provide the required fire flow. The proposed 8" & 12"waterlines meet or exceed all of the design criteria for the City of College Station and Brazos County. They will provide adequate water pressure, flowrate and velocity for domestic demands and fire flow. EXHIBIT A WATER LAYOUT EXHIBIT B WICKSON CREEK SUD FLOW TEST REPORT EX HraCer B F -4. y lir • 8 ��` fxc� ♦OM1, --'-,-,,,,_,,,,,,:r.--- #'.. 35+ Fhxn 3/4 S'�; y v. �- bO - y , 4.qq 40V \**0 ' ,k, , - .,- • !jw 1 • tiJ S'',b 04, ft4 - ea 04, �� �4� �koO �ti cb wA a.�J '1'b 2 3 �4,,4/':,... .,''''' ,r 4 Off' •L MC. l $ 4 ' ,s 4, C y�� __,7. 021 S3N4 NNl1NI 1 EXHIBIT C PIPE & JUNCTION ANALYSIS - DOMESTIC FLOW Exhibit C WaterCAD Analysis Summary Pipe Analysis- Domestic Demand Pipe Hazen- Flow Velocity Number Length (ft) Size (in) Material Williams C (gpm) (ft/s) P-1 3,607 12 PVC 150 -1,289 3.66 P-2 8,973 12 PVC 150 -1,389 3.94 P-3 526 12 PVC 150 100 0.28 P-4 289 12 PVC 150 100 0.28 P-5 291 12 PVC 150 100 0.28 P-7 23 12 PVC 150 1,389 3.94 P-res 21 12 PVC 150 -1,289 3.66 WaterCAD Analysis Summary Junction Analysis- Domestic Demand Junction Junction Elevation Demand Pressure (gpm) (psi) FH 12633 298 0 79.8 J-2 311 0 79.1 FH 10187 330 0 84.7 FH-1 312 0 78.6 FH-2 312.39 0 78.5 J-6 312 100 78.6 EXHIBIT D PIPE & JUNCTION ANALYSIS - FIRE FLOW Exhibit D WaterCAD Analysis Summary Pipe Analysis- Fire Flow Demand (FH-1 FH-2) Pipe Hazen- Flow Velocity Length (ft) Size (in) Material Number Williams C (gpm) (ft/s) P-1 3,607 12 PVC 150 1,380 3.91 P-2 8,973 12 PVC 150 -1,220 3.46 P-3 526 12 PVC 150 2,600 7.38 P-4 289 12 PVC 150 1,350 3.83 P-5 291 12 PVC 150 100 0.28 P-7 23 12 PVC 150 1,220 3.46 P-res 21 12 PVC 150 1,380 3.91 WaterCAD Analysis Summary Junction Analysis- Fire Flow Demand (FH-1 FH-2) Junction Junction Elevation Demand Pressure (gpm) (psi) FH 12633 298 0 60.6 J-2 311 0 49.5 FH 10187 330 0 52.2 FH-1 312 1,250 46.5 FH-2 312.39 1,250 45.9 J-6 312 100 46 SCHULTZ ENGINEERING,LLC. 2730 Longmire Drive,Suite A College Station,Texas 77845 Firm No.12327 4/22/2015 Roans Chapel Final Plat Engineer's Estimate for Public Infrastructure Construction Improvements Item Description Unit Estimated Unit Price Total Quantity 1 Mobilization,Overhead,General Conditions&Construction Staking LS 1 $ 7,500.00 $ 7,500.00 2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,500.00 $ 1,500.00 Filter Dam,etc.,complete in place 3 Hydromulch&Seeding,complete in place SY 2,874 $ 0.60 $ 1,724.40 General Items Subtotal S 10,724.40 `!I1Ira}t!' Ii Ittu18,' 3 Connect to Existing 12"Water Line EA 1 S 2,500.00 S 2,500.00 4 Connect to Existing 6"Water Line EA 2 $ 1,500.00 $ 3,000.00 5 12"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 640 $ 48.00 $ 30,720.00 6 12"45°Bend,complete in place EA 2 $ 900.00 $ 1,800.00 7 12"22.5°Bend complete in place EA I $ 900.00 S 900.00 8 12"11.25°Bend,complete in place EA 1 S 900.00 S 900.00 9 12"M.J.Gate Valve,complete in place EA 4 $ 2,200.00 $ 8,800.00 10 l2"x 12"M.J.Tee,complete in place EA I $ 950.00 $ 950.00 II 12"x 6"Tee,complete in place EA 1 $ 900.00 $ 900.00 12 12"x 6"Cross,complete in place EA 1 $ 1,000.00 $ 1,000.00 13 12"x 8"Reducer,complete in place EA 1 S 900.00 S 900.00 l4 6"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 50 S 26.00 $ 1,300.00 15 6"45°Bend,complete in place EA 4 $ 750.00 $ 3,000.00 16 6"MO Gate Valve,complete in place EA 2 $ 1,000.00 $ 2,000.00 17 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 305 $ 32.00 $ 9,760.00 18 8"MJ Gate Valve,complete in place EA 1 S 1,500.00 $ 1,500.00 19 8"x 6"Tee,complete in place EA 1 S 750.00 $ 750.00 20 Fire Hydrant Assembly,complete in place EA 2 $ 3,500.00 $ 7,000.00 2l 1.5"Water Service-single,complete in place LF 2 S 1,000.00 $ 2,000.00 22 l.5"Water Service-double,complete in place LF 2 $ 1,250.00 S 2,.500.00 23 2"Blowoff Valve Assembly,complete in place EA 1 S 1,500.00 S 1,500.00 24 Bore&Install 20"Casing,complete in place LF 150 $ 120.00 S 18,000.00 25 12"Pipe-Locking Joint w/End Seals&Spacers,complete in place LF 160 S 80.00 S 12,800.00 26 Water Line Testing LS 1 $ 1,500.00 $ 1,500.00 Water Construction Items Subtotal $ 115980.00 General Items Subtotal S 10,724.40 Water Construction Items Subtotal S 115,980.00 TOTAL CONSTRUCTIONI$ 126,704.40 ill„Ir ,l. . �! ••• Ii *. • • •... 4. * \ • C:F..VEN L. 1nyEN 101:98.55 l, ,I I� � ' L, .:.<.0.\ c 2Z ��IIII� V FIRM hi 12327 Page1of1 SCHULTZ ENGINEERING,LLC. 2730 Longmire Drive,Suite A College Station,Texas 77845 Firm No.12327 Roans Chapel Final Plat Engineer's Estimate for Public Infrastructure Construction Improvements Item Description Estimated P Unit Quantity Unit Price Total I Mobilization,Overhead,General Conditions&Construction Staking LS I S 7,500.00 $ 7,500.00 2 Erosion&Sediment Control-SWPPP Implementation&Maintenance,Silt Fence,Construction Exit,Rock LS 1 $ 1,500.00 S 1,500.00 Filter Dam,etc.,complete in place 3 Hydromulch&Seeding,complete m place SY 2,874 $ 0.60 $ 1,724.40 General Items Subtotal S 10,724,40 i �.,IS / ntiiE-'° r ��,>IitNr(o tst1'?IM1Et n .-'3 A ii r n 3 �. g ft ,��� ., .. ., .,,�,"y.., ��n c,. ,::: '�F, ... „/,,.Wim' ,, . 3 Connect to Existing 12"Water Line EA 1 $ 2,500.00 $ ,2,500.00 4 12"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 640 $ 45.00 $ 28,800.00 5 12"45°Bend,complete in place EA 2 S 600.00 S 1,200.00 6 12"22.5°Bend,complete in place EA 1 $ 600.00 $ 600.00 7 12"11.25°Bend,complete in place EA I S 600.00 $ 600.00 8 12"M.J.Gate Valve,complete in place EA 4 $ 2,200.00 S 8,800.00 9 12"x 12"M.J.Tee,complete in place EA 1 S 950.00 S 950.00 10 12"x 6"Tee,complete in place EA I $ 750.00 S 750.00 11 12"x 6"Cross,complete in place EA I $ 1,000.00 $ 1,000.00 12 12"x 8"Reducer,complete m place EA 1 $ 600.00 $ 600.00 13 8"C900 Water Pipe w/tracer wire-Structural Backfill,complete in place LF 305 S 30.00 S 9,150.00 14 8"MJ Gate Valve,complete in place EA I S 1,000.00 $ 1,000.00 15 8"x 6"Tee,complete in place EA 1 $ 500.00 S 500.00 16 Fire Hydrant Assembly,complete in place EA 2 $ 3,500.00 S 7,000.00 17 1.5"Water Service-single,complete in place LF 2 $ 1,000.00 $ 2,000.00 18 1.5"Water Service-double,complete in place LF 2 $ 1,250.00 S 2,500.00 19 2"Blowoff Valve Assembly,complete m place EA I $ 1,500.00 $ 1,500.00 20 Bore&Install 20"Casing,complete in place LF 150 $ 120.00 $ 18,000.00 2l 12"Pipe-Locking Joint w/End Seals&Spacers,complete in place LF 160 S 80.00 $ 12,800.00 22 Water Line Testing LS 1 S 1,000.00 $ 1,000.00 Water Construction Items Subtotal S 101,250.00 General Items Subtotal $ 10,724.40 Water Construction Items Subtotal S 101,250.00 TOTAL CONSTRUCTION'S 111,974.40 DEVEN ... DOYEN 74 1 15-- ; ;, 109 33o FIRM z 1232" `-SCI-IUI..17 L.:NGI^di:F.:.RING, !..i..0 Page 1 of 1