HomeMy WebLinkAboutComments STAFF REVIEW COMMENTS NO. 1 Project: SITE PLAN, COMMERCIAL: BUSH'S CHICKEN TOWERPOINT (SP) PLANNING COMMENTS NO. 1 Site Plan 1. Provide a note on the Site Plan that states: Tower Point Phase 12, Block 2 lot3 is part of the Tower Point Phase 12 Building Plot (b). As identified on the approved Preliminary Plan for the Purposes of Signage, Landscaping, and Non-Residential Architecture Standards for building plots between 20,000 and 49,000 square feet. A. Provide a note on the Site Plan that state all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance L 3. Provide bike rack detail. As required by the City of College Station the bike rack must provide space for a minimum 4 bicycles. Please provide the City approved detail as site in the site design ptandards. . ' rovide the standard curb detail on the Site Plan. L�KAIL- -7 Cu�3 / 4 O CF r`'4Cvucn,) �. _5 2Curbing is required along the perimeter of all paved surfaces. Please revise the Site plan to illustrate this requirement. FYI... due to this requirement wheel stops are optional and can be removed from the site plan. CoVIAT c_,=\ 1_ :is . LE Nc C, fl 5 -tNTmc,E I,,% u_k 7 /C"/ .7 6. As can be determined on the Site Plan the Parking area facing Highway 6 Frontage road is setback approximately 15 feet. Due to the property lying within the Corridor Overlay, the parking lot must be setback a minimum of 20 feet from the property line. This distance is measured from the property line to the edge of pavement. Please revise the Site Plan so that it meets this requirement. 7. Please provide driveway details on the Site Plan.CI 1 . t 8. What material is the retaining wall made of? Also, due to restrictions within Tower Point the retaining wall cannot be located within an easement and must be treated with a natural stone aterial. Please revise accordingly. r/4E7r=)�N7i ic. ,)o (,cr\,a-) 9 Identify all easements and include their volume and page Where is the order box located for the drive thru? How many drive-thru lanes are there? ..---g. What is the half wall area at the rear of the building? 12 The dumpster enclosure dimensions need to be revised to meet a 12'x12' interior clearance. This arance must include bollards or any other structural component located within the enclosure. 13. Please provide a vicinity map showing the location of the subject property on both the site plan and landscape plan.Sk-1C \I --ClPt.—\2,Th ofv,.)- y '''14. There is an interior island located a near the American Lube dumpster enclosure. Please identify that this island is meeting the minimum size requirement of at least 180 square feet. .'15. The head-in parking spaces next to the American Lube dumpster enclosure, do they need to placed right next to the property line? Landscaping v 1. The point values identified in the plant schedule are incorrect, please revise. For canopy trees, if you are using a 3" caliper tree the point value is 150. If you are using any caliper larger than 3" the point value is 300. For Non-canopy trees the point value for 1.25" or larger caliper is 40, not 42. 2. Note 3 in the Landscape Plan states the use of 3" caliper trees while the plant schedule states the use of 4" caliper trees. Please revise to be consistent. ' 3. In reviewing the proposed streetscape along Hwy 6 Frontage, it appears to be deficient. As identified in the calculations, it is required to have 6 canopy trees along the frontage within 50 feet of Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE - COLLEGE STATION • TEXAS - 77842 PH. 979-764-3570 • FAX. 979-764-3496 ( r140 401;1111P' CITY OF COLIEt:E STATION MEMORANDUM Project Review Memo April 20, 2015 TO: TODD SCOTT; via: todd(a�rileyscotthomes.com FROM: Mark Bombek, Staff Planner SUBJECT: SITE PLAN, COMMERCIAL: BUSH'S CHICKEN TOWERPOINT (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review by going to the following link https://etrakit.cstx.gov/etrakit3 : City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) complete set of civil construction documents for the proposed development with the revised site and landscape plans attached. Two (2) 24"x36" revised Site Plans; One (1) 24"x36" revised Landscape Plan; One (1) 24"x36" Grading and Erosion Control Plan. Please note that this applications will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Todd Scott; via: todd(a�rileyscotthomes.com Abacus Engineering; via: abacus(agrandecom.net Steve Peters; via: steve(c�rileyscotthomes.com P&DS Project No. SP2015-900090 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION •TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 the property line. Currently there are 6 non-canopy trees. As per the requirements in the Unified Development Ordinance, two non-canopy trees count as one canopy tree. Please provide either 3 canopy trees or 6 non-canopy trees to meet the streetscape requirements. 4. Provide easement boundaries and widths, and topography lines/labels. Provide Building Plot note on the Landscape Plan: Tower Point Phase 12, Block 2 lot3 is part of the Tower Point Phase 12 Building Plot (b). As identified on the approved Preliminary Plan for the Purposes of Signage, Landscaping, and Non-Residential Architecture Standards for building plots between 20,000 and 49,000 square feet. ` 6. Provide a note on the Landscape Plan that states: all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of- way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. ✓7. Please merge notes 4&5 together and re-word it to state: 100% coverage of groundcover, decorative paving, decorative rock (not loose), or perennial grass is required in parking lots islands, swales, and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. 8. Please merge notes 7&8 together and word it to state: The contractor is responsible for designing, furnishing and installing a complete irrigation sprinkler system for the site provide empty conduit under drive and parking lot as required for full coverage. Irrigation system must be protected by either a pressure vacuum breaker, a reduced pressure principle back flow device, or a double-check back flow devise, and installed as per city ordinance 2394. v9. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. X10. Provide a note on the Landscape Plan that states all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of- way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Mark Bombek Date: 4/17/2015 ENGINEERING ENGINEERING COMMENTS NO. 1 1. Provide an electrical plan, fire flow letter, drainage letter, water & sanitary sewer letter, and TCEQ Notice of Intent. 2. CO3 — Please label all existing and proposed easements with their width and volume/page number. 3. CO3 — Please show existing and proposed water, sanitary sewer, and storm sewer. 4. CO3 —What is the unlabeled rectangular figure in the northern corner of the property? 5. CO3— Retaining walls and other vertical structures are typically not permitted in easements, however we understand the necessity for the small retaining wall along the front of the tract. If this wall has,to be removed in order to maintain our utilities, the owner will be responsible for replacing it at their expense. Please add a note regarding this requirement. 6. CO3 — Please add notes regarding the following items: • Location of the property in relation to the FEMA floodplain (include zone and panel number). Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 • Fire flow note (including building size, material type, whether the building is sprinkled or not, and fire flow requirement per the IFC). • Domestic water and sewer demands (minimum, average, and maximum). • This property is located within the Spring Creek Sanitary Sewer impact Fee Area ($144.01/LUE). 7. C04 — Please include inlet protection along the shared access drive inlets and around the grate inlets on-site. 8. C05 —Although the proposed storm sewer will be privately owned and maintained, we would recommend that you match soffits with the existing 24-inch storm pipe. 9. C07 — FYI...Retaining walls 24-in or taller will require a separate building permit. 10. C07 — It looks like some of your grading is proposed to be located on the adjacent tract. Please provide verification that the adjacent property owner is consenting to these modifications on their property. 11. C08 — Since sheets C10.2, 10.3, & 11.2 are referenced as having water and sewer details, please include those sheets in this civil construction set. 12. C08 —The water meters need to be located at the edge of the PUE. The irrigation double check should be outside of the easement. 13. C08 — Please label the waterline material and size between the existing valve and the proposed meters. (FYI...This line may not be Schedule 40 as referenced in Note #6.) 14. C09 — Canopy trees should be located at least 10-ft from public water and sanitary sewer lines. Reviewed by: Erika Bridges Date: 4/14/15 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 2. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 6. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 3/27/2015 FIRE 1) As long as a Fire Hydrant is within 450' of the entire structure. Reviewed by: Steve Smith Date: 3/30/2015 Planning & Development Services P.O. BOX 9960 - 1101 TEXAS AVENUE • COLLEGE STATION •TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 SANITATION 1. The dumpster enclosure needs to measure a 12'x12' inside dimension. Reviewed by: Wally Urrutia Date: 4/1/2015 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION •TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 (:.i OF( ou.Fx;E STATION MEMORANDUM Project Review Memo April 20, 2015 TO: TODD SCOTT; via: todd(a�rileyscotthomes.com FROM: Mark Bornbek, Staff Planner SUBJECT: SITE PLAN, COMMERCIAL: BUSH'S CHICKEN TOWERPOINT (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review by going to the following link https://etrakit.cstx.gov/etrakit3 : City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); One (1) complete set of civil construction documents for the proposed development with the revised site and landscape plans attached. Two (2) 24"x36" revised Site Plans; One (1) 24"x36" revised Landscape Plan; One (1) 24"x36" Grading and Erosion Control Plan. Please note that this applications will expire in 90 days from the date of this memo, if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments PC: Todd Scott; via: todd(a�rileyscotthomes.corn Abacus Engineering; via: abacusCa�grandecom.net Steve Peters; via: steve(a�rileyscotthomes.com P&DS Project No. SP2015-900090 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION •TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 STAFF REVIEW COMMENTS NO. 1 Project: SITE PLAN, COMMERCIAL: BUSH'S CHICKEN TOWERPOINT (SP) PLANNING COMMENT'S NO. 1 Site Plan 1. Provide a note on the Site Plan that states: Tower Point Phase 12, Block 2 lot3 is part of the Tower Point Phase 12 Building Plot (b). As identified on the approved Preliminary Plan for the Purposes of Signage, Landscaping, and Non-Residential Architecture Standards for building plots between 20,000 and 49,000 square feet. 2. Provide a note on the Site Plan that state all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance 3. Provide bike rack detail. As required by the City of College Station the bike rack must provide space for a minimum 4 bicycles. Please provide the City approved detail as site in the site design standards. 4. Provide the standard curb detail on the Site Plan. 5. Curbing is required along the perimeter of all paved surfaces. Please revise the Site plan to illustrate this requirement. FYI... due to this requirement wheel stops are optional and can be removed from the site plan. 6. As can be determined on the Site Plan the Parking area facing Highway 6 Frontage road is setback approximately 15 feet. Due to the property lying within the Corridor Overlay, the parking lot must be setback a minimum of 20 feet from the property line. This distance is measured from the property line to the edge of pavement. Please revise the Site Plan so that it meets this requirement. 7. Please provide driveway details on the Site Plan. 8. What material is the retaining wall made of? Also, due to restrictions within Tower Point the retaining wall cannot be located within an easement and must be treated with a natural stone material. Please revise accordingly. 9. Identify all easements and include their volume and page 10. Where is the order box located for the drive thru? How many drive-thru lanes are there? 11. What is the half wall area at the rear of the building? 12. The dumpster enclosure dimensions need to be revised to meet a 12'x12' interior clearance. This clearance must include bollards or any other structural component located within the enclosure. 13. Please provide a vicinity map showing the location of the subject property on both the site plan and landscape plan. 14. There is an interior island located on near the American Lube dumpster enclosure. Please identify that this island is meeting the minimum size requirement of at least 180 square feet. 15. The head-in parking spaces next to the American Lube dumpster enclosure, do they need to placed right next to the property line? Landscaping 1. The point values identified in the plant schedule are incorrect, please revise. For canopy trees, if you are using a 3" caliper tree the point value is 150. If you are using any caliper larger than 3" the point value is 300. For Non-canopy trees the point value for 1.25" or larger caliper is 40, not 42. 2. Note 3 in the Landscape Plan states the use of 3" caliper trees while the plant schedule states the use of 4" caliper trees. Please revise to be consistent. 3. In reviewing the proposed streetscape along Hwy 6 Frontage, it appears to be deficient. As identified in the calculations, it is required to have 6 canopy trees along the frontage within 50 feet of Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 the property line. Currently there are 6 non-canopy trees. As per the requirements in the Unified Development Ordinance, two non-canopy trees count as one canopy tree. Please provide either 3 canopy trees or 6 non-canopy trees to meet the streetscape requirements. 4. Provide easement boundaries and widths, and topography lines/labels. 5. Provide Building Plot note on the Landscape Plan: Tower Point Phase 12, Block 2 lot3 is part of the Tower Point Phase 12 Building Plot (b). As identified on the approved Preliminary Plan for the Purposes of Signage, Landscaping, and Non-Residential Architecture Standards for building plots between 20,000 and 49,000 square feet. 6. Provide a note on the Landscape Plan that states: all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of- way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 7. Please merge notes 4&5 together and re-word it to state: 100% coverage of groundcover, decorative paving, decorative rock (not loose), or perennial grass is required in parking lots islands, swales, and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. 8. Please merge notes 7&8 together and word it to state: The contractor is responsible for designing, furnishing and installing a complete irrigation sprinkler system for the site provide empty conduit under drive and parking lot as required for full coverage. Irrigation system must be protected by either a pressure vacuum breaker, a reduced pressure principle back flow device, or a double-check back flow devise, and installed as per city ordinance 2394. 9. Provide a general note on the site plan that states the following: Exterior building and site lighting will meet the standards of Section 7.11 of the Unified Development Ordinance. The light source shall not project below an opaque housing and no fixture shall directly project light horizontally. Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line. 10. Provide a note on the Landscape Plan that states all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of- way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Mark Bombek Date: 4/17/2015 ENGINEERING ENGINEERING COMMENTS NO. 1 1. Provide an electrical plan, fire flow letter, drainage letter, water & sanitary sewer letter, and TCEQ Notice of Intent. 2. CO3 — Please label all existing and proposed easements with their width and volume/page number. 3. CO3 — Please show existing and proposed water, sanitary sewer, and storm sewer. 4. CO3 —What is the unlabeled rectangular figure in the northern corner of the property? 5. CO3 — Retaining walls and other vertical structures are typically not permitted in easements, however we understand the necessity for the small retaining wall along the front of the tract. If this wall has to be removed in order to maintain our utilities, the owner will be responsible for replacing it at their expense.; Please add a note regarding this requirement. 6. CO3 — Please add notes regarding the following items: • Location of the property in relation to the FEMA floodplain (include zone and panel number). Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 • Fire flow note (including building size, material type, whether the building is sprinkled or not, and fire flow requirement per the IFC). • Domestic water and sewer demands (minimum, average, and maximum). • This property is located within the Spring Creek Sanitary Sewer Impact Fee Area ($144.01/LUE). 7. C04 — Please include inlet protection along the shared access drive inlets and around the grate inlets on-site. 8. C05 —Although the proposed storm sewer will be privately owned and maintained, we would recommend that you match soffits with the existing 24-inch storm pipe. 9. C07 — FYI...Retaining walls 24-in or taller will require a separate building permit. 10. C07 — It looks like some of your grading is proposed to be located on the adjacent tract. Please provide verification that the adjacent property owner is consenting to these modifications on their property. 11. C08 — Since sheets C10.2, 10.3, & 11.2 are referenced as having water and sewer details, please include those sheets in this civil construction set. 12. C08 —The water meters need to be located at the edge of the PUE. The irrigation double check should be outside of the easement. 13. C08 — Please label the waterline material and size between the existing valve and the proposed meters. (FYI...This line may not be Schedule 40 as referenced in Note #6.) 14. C09 — Canopy trees should be located at least 10-ft from public water and sanitary sewer lines. Reviewed by: Erika Bridges Date: 4/14/15 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 2. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 4. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 5. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. 6. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 3/27/2015 FIRE 1) As long as a Fire Hydrant is within 450' of the entire structure. Reviewed by: Steve Smith Date: 3/30/2015 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION •TEXAS • 77842 PH. 979-764-3570 - FAX. 979-764-3496 SANITATION 1. The dumpster enclosure needs to measure a 12'x12' inside dimension. Reviewed by: Wally Urrutia Date: 4/1/2015 Planning & Development Services P.O. BOX 9960 • 1101 TEXAS AVENUE • COLLEGE STATION • TEXAS • 77842 PH. 979-764-3570 • FAX. 979-764-3496 * 14, 40044- ''''' ,,, CITY OF COLIEGE STATION Home of Texas A&M University° 0./D MEMORANDUM DATE: March 26, 2015 TO: Todd Scott, via; todd@rileyscotthomes.com FROM: Mark Bornbek, Staff Planner SUBJECT: BUSH'S CHICKEN TOWERPOINT (SP) Thank you for the submittal of your Site Plan - Commercial application. Erika Bridges, Graduate Engineer II, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Thursday, April 9, 2015. If you have questions in the meantime, please feel free to contact us. PC: P&DS Project No. 15-00900090 Planning&Development Services P.O.BOX 996(3 • 1101 TEXAS AVENUE •COLLEGE E STATION •TEXAS •77847 ILL. 979.764.3570 •FAX. 979.764.34% cstx.govidevservices