Loading...
HomeMy WebLinkAboutStaff Review Staff Review Comments No. 1 Project: Castle Rock Splash Pad Addition (SP) — 15-00900099 Mark Bombek: Planning Comments 1. Please add a note stating the proposed canopy trees that are replacing the existing trees being removed for the construction of the splash pad will be 3.5" in caliper or larger in accordance with the requirements of the previously approved landscape plan. Proposed canopy trees have been labeled 3.5"caliper minimum. Carol Cotter: Engineering Comments 2. Please note and revise accordingly: The Splash Pad shall be a closed system(pump&filter system)with an isolation valve that can be opened to discharge water from the closed system to the sanitary sewer line. Isolation valve shall be kept closed to prevent rain/storm water from entering the sanitary sewer. (According to 2012 IPC, and indirect waste with an air gap is required for swimming pools,backwash filter systems,pool decks, and similar applications like the Splash Pad. Section 802.2.1 of the 2012 IPC: "The 'air gap' between the indirect waste pipe and the flood level rim of the waste receptor shall be not less than twice the effective opening of the indirect waste pipe". The waste receptor(sanitary sewer inlet) shall be trapped and protected from rainfall.) Note 6 has been added to site specific notes. Schultz Engineering, LLC Office: 979.764.3900 Fax: 979.764.3910 May 6, 2015 Mark Bombek Staff Planner City of College Station 1101 Texas Avenue College Station, TX 77840 Re: Castle Rock Splash Pad Additions— 15-00900099 Dear Mr. Bombek: Attached are the following items for the project referenced above: • One(1) 24"x 36" copy of the revised Construction Drawings • Response to Staff Comments If you have any questions, please do not hesitate to call. Sincerely, Schultz Engineering, LLC. (Deven Doyen, P.E. Civil Engineer P.O. Box 11995 • College Station,Texas 77842 schultzengineeringllc.com FOR OFFICE USE ONLY CASE NO.: 5 P 6.015-900409 DATE SUBMITTED: 5-164/1— TIME: i /JS-TIME: 4..60 CITY OF COLLEGE STATION Home of Texas A&M University' STAFF: f PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Incomplete Project Submittal -documents needed to complete an application. Case No.: 0 Existing Project Submittal. Case No.: 15-00900099 Project Name Castle Rock Splash Pad Additions Contact Name Deven Doyen Phone Number 979.764.3900 We are transmitting the following for Planning & Development Services to review and comment(check all that apply): ❑ Comprehensive Plan Amendment ❑ Non-Residential Architectural Standards ❑ Rezoning Application ❑ Irrigation Plan ❑ Conditional Use Permit ❑ Variance Request ❑ Preliminary Plan ❑ Development Permit ❑ Final Plat ❑ Development Exaction Appeal ❑ Development Plat ❑ FEMA CLOMA/CLOMR/LOMA/LOMR 0 Site Plan ❑ Grading Plan ❑ Special District Site Plan 0 Other-Please specify below ❑ Special District Building/Sign Response to comments ❑ Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Comprehensive Plan Amendment ❑ Waterline Construction Documents ❑ TxDOT Driveway Permit ❑ Sewerline Construction Documents ❑ TxDOT Utility Permit ❑ Street Construction Documents ❑ Drainage Letter or Report ❑ Easement Application ❑ Fire Flow Analysis ❑ Other- Please specify Special Instructions: 10/10 dii7frOrti Mark Bombek From: Mark Bombek Sent: Wednesday, May 06, 2015 8:49 AM To: 'Deven Doyen' Cc: Carol Cotter Subject: Castle Rock Splash Pad Addition Good Morning Deven, I sincerely apologize for the significant delay in getting comments out to you regarding this project. After reviewing the plans there is only one additional note I need added to the Landscape Plan. Please add a note stating the proposed canopy trees that are replacing the existing trees being removed for the construction of the splash pad will be 3.5" in caliper or larger in accordance with the requirements of the previously approved landscape plan. Carol also commented the following: Please note and revise accordingly:The Splash Pad shall be a closed system (pump &filter system)with an isolation valve that can be opened to discharge water from the closed system to the sanitary sewer line. Isolation valve shall be kept closed to prevent rain/storm water from entering the sanitary sewer. (According to 2012 IPC, and indirect waste with an air gap is required for swimming pools, backwash filter systems, pool decks, and similar applications like the Splash Pad. Section 802.2.1 of the 2012 IPC: "The 'air gap' between the indirect waste pipe and the flood level rim of the waste receptor shall be not less than twice the effective opening of the indirect waste pipe".The waste receptor (sanitary sewer inlet) shall be trapped and protected from rainfall.) Please address these comments and submit one revised set of the construction drawings including the revised site and landscape plans. If you have any further questions please feel free to contact me. Thank you, Mark Bombek Staff Planner Planning & Development Services City of College Station P.O. Box 9960 1101 Texas Avenue College Station , TX 77842 Office: 979-764-3763 Fax: 979-764-3496 Email: mbombek(c�cstx.gov Website: www.cstx.gov 1 ( , ,,,, ,,,,,7 ..s4"--- * ,7 CITY OF COLLEGE STATION Home of Texas Ad M University' MEMORANDUM Of) DATE: April 8, 2015 TO: Castle Rock Homeowners Association, Inc, via; sandie@hoapartners.com ✓ FROM: Mark Born bek, Staff Planner SUBJECT: CASTLE ROCK SPLASH PAD ADDITION (SP) t7. Thank you for the submittal of your Site Plan application. Carol Cotter, Assistant City Engineer, Laura Walker, Staff Planner, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Wednesday, April 22, 2015. If you have questions in the meantime, please feel free to contact us. PC: Deven Doyen, Schultz Engineering, LLC, via; deven@schultzengineeringllc.com V P&DS Project No. 15-00900099 Planning er Development Services P.O.BOX 9960 • 1101"FEXAS AVENUE •COLLEGE L S FATI() •TEXAS •7784') TEl r9. 64.3570 •FAX. 979.764.3496 cstx.govld evsarvi ce s ENGINEERING COMMENTS NO. 1 1. Please note: The Splash Pad shall be a closed system (pump & filter system) with an isolation valve that can be opened to discharge water from the closed system to the sanitary sewer line. Isolation valve shall be kept closed to prevent rain/storm water from entering the sanitary sewer. Reviewed by: Carol Cotter Date: April 13, 2015