Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
$668 processing fee for the next round of three (3) staff reviews
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Easement Dedication Sheet and required documents
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments a `°
O
pc: Amir Ostami via email: amirrostami@yahoo.com `
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 3
Project: Aquarium (Sp) - 08-00500222
PLANNING
1. A public access easement must be dedicated to the City along University Drive. The
easement should extend from the property line to the building façade.
2. As discussed previously, Staff has not received documentation regarding the ownership
of the lot north of Aquarium Bar. An easement cannot be dedicated on this property until
the ownership is resolved. There are also utility improvements being made to this
property, and so the owner should be involved.
3. The staircase at the rear of Schotzi's extends outside of the access easement.
4. Is the bench along University Drive being installed? A waiver was approved by the
Design Review Board.
5. Mechanical equipment must be screened 100% from view. The staircase will not
adequately screens the air conditioning units.
6. Please show the property line of the subject property. There does seem to be a space
between Schotzi's and Aquarium Bar that will require groundcover.
7. Please indicate the distance to the near fire hydrant.
8. Has it been discovered that the existing sewer line is claytile?
9. Please identify the building height and square footage.
10. Four bicycle parking spaces are required, plus one additional spaces per 1000 square
feet of building area when the building exceeds 2000 square feet.
11. All new planting must be irrigated. Irrigation plans must be sealed by a licensed irrigator.
12. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren Hovde, Staff Planner Date: July 6, 2010
Please contact me at your earliest convenience to schedule a facilitation meeting: We
recommend not submitting copies for stamping until after this meeting.
ENGINEERING COMMENTS NO. 3
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
• The development permit fee and fire flow report have not been submitted. Also,
the fire line has not been included in the Patricia St. Waterline Design and will
need to be included with this project.
11. (Repeat Comment) Construction Docs — FYI...In addition to meeting all requirements in
BCS Design Guidelines, the fire flow report will need to show that the velocity within existing
or proposed mains does not exceed the 12 ft/s maximum limit.
• The Fire Flow report needs to be submitted with this project.
12. (Repeat Comment) Construction Docs — The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
Reviewed by: Erika Bridges Date: 7/7/10
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. By the nature of the design the Owner/ Developer will be responsible for maintaining the
overhead electrical service wiring to Zapatos and City Barber Shop.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 26 weeks.
5. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
6. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 6-29-10
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: June 29, 2010
FIRE
1) The FDC is not shown on the site plan.
2) Alarm is required the extent will be determined upon review of the building plans.
3) Knox Box is required on this structure.
1101 Texas Avenue, P.O. Box 9960
�� College Station, Texas 77842
/—� Phone 979.764.3570 I Fax 979.764.3496
CITv or.Coi.i,rci*.STATION
Home ofT,m Ao-M Uaivrr,ity'
MEMORANDUM
September 22, 2010
TO: Bill Scarmardo via email: bill@scarmardo.com4
iV
FROM: Lauren Hovde, Staff Planner L'1
SUBJECT: Aquarium (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Amir Ostami via email: amirrostami@yahoo.com\/
/
200 U Drive L.L.0 via fax: 713-314-351k)C L.. l
Joe Gattis via email: joe@gattisengineering.com jC(I c 1
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 4
Project: Aquarium (SP) - 08-00500222
PLANNING
Screening materials must coordinate in material and color to those use on the building. A
plain od fence does not meet this ordinance.
. at does "P.P." stand for?
Please label the electric and irrigation meters.
. Ir igation must be on an automated system.
1,5!Please provide the building height.
04/hat is the transparency formula on the bottom of the sheet for? If it is for the front facade,
then that facade isn't meeting minimum requirements.
1. ' se label the knox box.
avers must be installed between the building and the sidewalk. The only place this doesn't
appjyis on the building sides between Zapatos and Schotzi's, as discussed.
1,9(P ase label the access easement for the staircase as a "Public Access Easement".
he volume and page numbers must be provided for each easement. Since the easements
won't be filed by the time we need to approve the plans, please leave a blank that can be filled
in prior to CO.
Reviewed by: Lauren Hovde, Staff Planner Date: September 20, 2010
ENGINEERING COMMENTS NO. 4
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
• A development permit fee was not yet been submitted with this project or the
Patricia St. Waterline Improvement project.
2. (Repeat Comment) Site Plan — Please provide water and sanitary sewer demands on the
site plan.
• Based on the 2009 International Plumbing Code - Table E103.3(3) that was
provided to you, it looks like the average water demand would be about 49
gallons per minute. This would make the peak demand 196 gpm. Please look at
the International Plumbing Code and confirm these numbers.
3. (Repeat Comment) Site Plan — Please show the full extent of proposed waterline including
where it ties into the existing main on Boyette St.
• The fire line has not been designed and needs to be shown on the site plan as
well.
5. (Repeat Comment) Site Plan — Please label all proposed waterlines with size and material
and the existing main on Boyette St. with its size. Please also clearly label the fire hydrant
as proposed.
• The domestic waterline and fire line need to be labeled with size and material.
6. (Repeat Comment) Site Plan —The FDC connection needs to be shown and labeled on the
site plan at the back of the building facing the fire lane.
• This needs to be shown and labeled on the site plan. The current location is not
facing a fire lane and will not be accessible for the fire department.
• The FDC must be connected to a separate waterline from the proposed fire line
as shown. Please revise.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• Please provide blank spaces for the volume and page number to be filled in after
they are filed. As a reminder, they must be filed prior to CO.
• The Electrical Dept. has indicated to me that a 5-ft Public Utility Easement on the
adjacent property and along the back of the Aquarium Bar lot will be sufficient to
provide access to public infrastructure. The private fire line should not encroach
in this easement.
8. (Repeat Comment) Site Plan — Please provide a letter stating that you have been granted
permission to place the proposed utilities (public and private) on private property.
• Please provide a private utility easement for the private fire line or a letter from
the property owner granting permission for utilities to be placed on his property.
9. (Repeat Comment) Construction Docs — Please provide engineer signed and sealed
construction drawings (including plan and profile) for the proposed waterline extension and
fire hydrant.
• As a reminder, the Patricia St. Waterline will need to be built and accepted prior
to issuance of CO.
10. (Repeat Comment) Construction Docs — Please submit the Public Infrastructure Inspection
Fee, Engineer's Cost Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire
Flow Report.
• The development permit fee and fire flow report have not been submitted. Also,
the fire line has not been included in the Patricia St. Waterline Design and will
need to be included with this project.
11. (Repeat Comment) Construction Docs — FYI...In addition to meeting all requirements in
BCS Design Guidelines, the fire flow report will need to show that the velocity within
existing or proposed mains does not exceed the 12 ft/s maximum limit.
• The Fire Flow report needs to be submitted with this project.
12. (Repeat Comment) Construction Docs — The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
• Please provide a note on the site plan stating this information.
Reviewed by: Erika Bridges Date: September 21, 2010
• A development permit fee was not yet been submitted with this project or the
Patricia St. Waterline Improvement project.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
• Please remove the 10-ft PUE across Lots 6, 13, and 14. We have requested that
you secure a private utility easement across those lots or at least a letter granting
you access to install and maintain your private services on private property
owned by others.
3. (Repeat Comment) Site Plan — Please provide water and sanitary sewer demands on the
site plan.
• The average and maximum water and sewer demands should be provided in
accordance with the BCS Unified Design Guidelines. One of the methods for
determining these demands is "Method 1 — Fixture Count Determination," which
will give you a peak demand based on the City's adopted Plumbing Code. Please
let me know if you need help determining these demands.
4. (Repeat Comment) Site Plan — Please show the full extent of proposed waterline including
where it ties into the existing main on Boyette St.
• Please coordinate with Gattis Engineering to show the proposed waterline tie—in
correctly.
• The fire line has not been designed and needs to be shown on the site plan as
well.
5. (Repeat Comment) Site Plan — Please label all proposed waterlines with size and material
and the existing main on Boyette St. with its size. Please also clearly label the fire hydrant
as proposed.
• The domestic waterline, fire line, and water meter needs to be labeled with size
and material. The fire hydrant needs to be shown correctly, too.
6. (Repeat Comment) Site Plan — The FDC connection needs to be shown and labeled on the
site plan at the back of the building facing the fire lane.
• This needs to be shown and labeled on the site plan.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• The proposed 10'x15' Public Utility Easement needs to be shown and labeled with
volume and page number. Please coordinate with Gattis Engineering.
8. (Repeat Comment) Site Plan — Please provide a letter stating that you have been granted
permission to place the proposed utilities (public and private) on private property.
9. (Repeat Comment) Construction Docs — Please provide engineer signed and sealed
construction drawings (including plan and profile) for the proposed waterline extension and
fire hydrant.
• The construction documents are still under review.
10. (Repeat Comment) Construction Docs — Please submit the Public Infrastructure inspection
Fee, Engineer's Cost Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire
Flow Report.
Reviewed by: Eric Dotson Date: 7/1/10
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
CITY OF COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 14, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Four (4) revised site plans.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Amir Ostami via email: amirrostami@yahoo.com
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 2
Project: AQUARIUM (SP) - 08-00500222
PLANNI G
1 Please provide a letter of confirmation from 200 U Drive LLC, that they are aware of the
alternations being made to 209 University Drive.
Attached
2.; As discussed over the phone on November 13, 2008, please provide written permission
\— from the abutting property owner to allow the exit stair, screening, and utility lines to
extend onto or through their property. Also, written permission must be granted from the
\} � `j. Boyett property to extend the utility lines through it.
' d>is Access Easement Agreement Document 01019626 Book DR Volume 8952 page
/ 199 grants access for stair onto adjacent property.
•
' The 8-ft Access Easement Agreement needs to be filed with Brazos County and a
volume and page number provided on the site plan. Please also submit a copy of the
recorded document. This agreement shows that the easement extends onto land that is
not owned by either party. Please revise this agreemeno remove any portion that is
owned by a non-participating party, or please include the owner of said property in the
agreement.
Access Easement Agreement Document 01019626 Book DR Volume 8952 page
199 grants access for stair onto adjacent property.
4. )Since alterations are being made to the W.C. Boyett property, please show how that
'�..J property will be brought into compliance with the NG-1 standards. This property owner
must be brought into the site plan process. The Site Plan Application must be revised to
include this property owner's contact information and signature.
Easement is already dedicated and in the process of being signed by Judge
Boyette.
\ Please provide a copy of the shared bicycle parking agreement, along with the number
of spaces provided. Staff will need to determine if there are an adequate number of
spaces to serve both properties.
Bicycle parking will be provided on Next to Schotzi's as shown on Drawing.
Attached is an agreement from the owner of Schotzi's to allow Bicycle Parking.
On his property.
7. During a previous phone conversation, it was stated that the planter on the front facade
was being left in place as an alternative to the street tree requirement. The site plan
notes that the planter will be removed. Please clarify.
Planter remains as per DRB.
Please confirm that they is no 100-year floodplain on the property by providing a
FEMA/FIRM map number.
FEMA map no. 48041C0143C effective date 07/02/1992. Reference General Notes
Item 1.
03:1 Repeat Comment - Please show the ownership of the abutting properties. The business
'---. name is helpful, but the owner name is required.
Property owners shown tA,jC\i\ r•
h
9. When the scale is increased, as requested in the engineering comments, please show
the near-by driveways.
, See water line engineering drawings submitted by Gattis Engineering.
V1/0. Repeat Comment - Please label the fire lane on the site plan.
After discussion with Fire Marshall, a fire line is not require. The Fire Dept. will
use Patricia Street.
,11. Repeat Comment - Please show a c ,rnd pavement detail, along with the pattern for
V the pavers. A selection of patten'; can be found on page 29 of the Site Design
Standards. Even if the pavers are existing, please show a detail of the pattern. Thanks.
it1tAi Ie/LL (:)1 ,L
The drawings show the existing Pavers as previously Installed.
12. Repeat Comment - The second page of the Site Plan Application needs to be
,/, completed. Staff can make these changes per your request.
Lauren Hovde has agreed to make the needed Changes.
13. Repeat Comment - Please identify what ground cover will be used at the base of the
�'building on the rear and side facades.
There is no property on the sides to plant groundoover since the building shares
a common wall with Schotzi's and Zapata's. I /
There is 3'8" of property at the rear of thebc4Lono
which is paved to provide
access to the electrical service and the rear exit. This will be paved with
L e rative paving.
14, peat Comment - Provide a general note that 100% coverage of groundcover,
decorative paving, decorative rock (not loose), or a perennial grass is required in parking
/ lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and
adjacent property disturbed during construction.
The parking lot to the North of the building does not belong to the owner.
1.8: An application to DRB has been received for:
a. 12' sidewalk along University Drive, the existing sidewalk varies from 8'-10'.
b. Street treesr\v (114'..i 1
c. Street benches
Submitted
,93.Reminder: Please re-submit elevations for staff review.
Submitted
17. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 14, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee. •cee
Submitted with Patricia Street water line modification—Gattis Engineering
rfta
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
The 8 foot access easement is Document 01019626, Bk.DR, Vol. 8952,. Pg 203lo rec,
{
Electricial service was modified and does not require and easement. c -(d.opV(I
3. Site Plan—Please provide water and sanitary sewer demands on the site plan.
11114
The Water and Sewer Demand is 19 Fixture units. ---3.�t3,v1114d� �, 1�'Z 2` , ?1117ea vi khat(
, ' '�btY11 ��r r��
4. Site Plan — Please show the full extent of proposed waterline n 1�c 1r Yib��2r�' �ies�Fi ,tie '� )(102
existing main on Boyette St. cfri k bi., ( -•
•
Reference Patricia Street Water Line modification—Gattis Eng needing
5. Site Plan—Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed. `moo w✓i i 1Coaec-tki
Reference Patricia Street Water Line modification—Gattis Engineering
4/ Site Plan — Our records indicate a 5-ft PUE (Vol.7462/Pg.246) along Patricia St. Please
verify and show on site plan if it is on the property.
Reference Patricia Street Water Line modification—Gattis Engineering
Site Plan — Our records indicate an existing sanitary sewer line running parallel to the
proposed water line and crossing Patricia into the parking lot. Please show and label on the
site plan.
Sewer Line is drawn on Site Plan.
8. Site Plan—The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane. N 1
Will be submitted with Sprinkler Drawings -1/10uv
9. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval. l ok,) kA))
Reference Patricia Street Water Line modification—Gattis Engineering \id
10. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
Domestic water and sewer or existing. For the fire line reference the Patricia
Street modification—Gattis Engineeiring a< 1� �,rz ��Cf .)
Dov\ �-
11. Construction Docs — Please provide engineer signed ana sealed co sTr iorrr drawings
(including plan and profile) for the proposed waterline extension and fire hydrant. 1\1, + '/-1/t,,'DJ j
Reference Patricia Street Water Line modification—Gattis Engineering
12. Construction Docs—Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report. -� _Nov.)
Reference Patricia Street Water Line modification—Gattis Engineering \ y y or k
13. Construction Docs—FYI...In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit. _
Will be submitted with the Fire Sprinkler Drawings ld!'✓ \0\;`)•
14. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee.
Will be Submitted with the Fire Sprinkler Drawings.
15. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
Providing new water line. Reference Patricia Street water modification — Gattis
Engineering.
!Construction Docs — Please provide all applicable City standard details with your
construction drawings.
Reference Patricia Street Water Line modification—Gattis Engineering
Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reference Patricia Street Water Line modification—Gattis Engineering
Reviewed by: Erika Bridges Date: 11/13/08
FIRE (Repeat)
1) Building is required to have a fire alarm system.
Will submit Sprinkler drawings.
2) F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant
and located on the "road side" of a structure.
Providing new Fire Hydrant on Patricia Street.
Reviewed by: Eric Dotson Date: 9/22/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION (Repeat)
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
Electrical Design was changes and an easement is not required.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
Will provide legal description of easement after the new underground electrical
line is installed.
Reviewed by: Sam Weido Date: 9-17-08
Irff‘ 1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Crrvot COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 14, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Four (4) revised site plans.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Amir Ostami via email: amirrostami@yahoo.com
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 2
Project: AQUARIUM (SP) - 08-00500222
PLANNING
1. Please provide a letter of confirmation from 200 U Drive LLC, that they are aware of the
alternations being made to 209 University Drive.
2. As discussed over the phone on November 13, 2008, please provide written permission
from the abutting property owner to allow the exit stair, screening, and utility lines to
extend onto or through their property. Also, written permission must be granted from the
Boyett property to extend the utility lines through it.
3. The 8-ft Access Easement Agreement needs to be filed with Brazos County and a
volume and page number provided on the site plan. Please also submit a copy of the
recorded document. This agreement shows that the easement extends onto land that is
not owned by either party. Please revise this agreement to remove any portion that is
owned by a non-participating party, or please include the owner of said property in the
agreement.
4. Since alterations are being made to the W.C. Boyett property, please show how that
property will be brought into compliance with the NG-1 standards. This property owner
must be brought into the site plan process. The Site Plan Application must be revised to
include this property owner's contact information and signature.
5. Please provide a copy of the shared bicycle parking agreement, along with the number
of spaces provided. Staff will need to determine if there are an adequate number of
spaces to serve both properties.
6. During a previous phone conversation, it was stated that the planter on the front façade
was being left in place as an alternative to the street tree requirement. The site plan
notes that the planter will be removed. Please clarify.
7. Please confirm that they is no 100-year floodplain on the property by providing a
FEMA/FIRM map number.
8. Repeat Comment - Please show the ownership of the abutting properties. The business
name is helpful, but the owner name is required.
9. When the scale is increased, as requested in the engineering comments, please show
the near-by driveways.
10. Repeat Comment - Please label the fire lane on the site plan.
11. Repeat Comment - Please show a curb and pavement detail, along with the pattern for
the pavers. A selection of patterns can be found on page 29 of the Site Design
Standards. Even if the pavers are existing, please show a detail of the pattern. Thanks.
12. Repeat Comment - The second page of the Site Plan Application needs to be
completed. Staff can make these changes per your request.
13. Repeat Comment - Please identify what ground cover will be used at the base of the
building on the rear and side facades.
14. Repeat Comment - Provide a general note that 100% coverage of groundcover,
decorative paving, decorative rock (not loose), or a perennial grass is required in parking
lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and
adjacent property disturbed during construction.
15. An application to DRB has been received for:
a. 12' sidewalk along University Drive, the existing sidewalk varies from 8'-10'.
b. Street trees
c. Street benches
d. Reduction in transparency requirement
16. Reminder: Please re-submit elevations for staff review.
17. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 14, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
3. Site Plan— Please provide water and sanitary sewer demands on the site plan.
4. Site Plan — Please show the full extent of proposed waterline including where it ties into the
existing main on Boyette St.
5. Site Plan — Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
6. Site Plan — Our records indicate a 5-ft PUE (Vol.7462/Pg.246) along Patricia St. Please
verify and show on site plan if it is on the property.
7. Site Plan — Our records indicate an existing sanitary sewer line running parallel to the
proposed water line and crossing Patricia into the parking lot. Please show and label on the
site plan.
8. Site Plan—The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane.
9. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
10. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
11. Construction Docs — Please provide engineer signed and sealed construction drawings
(including plan and profile) for the proposed waterline extension and fire hydrant.
12. Construction Docs— Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
13. Construction Docs— FYI...In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
14. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee.
15. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
16. Construction Docs — Please provide all applicable City standard details with your
construction drawings.
17. Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reviewed by: Erika Bridges Date: 11/13/08
FIRE (Repeat)
1) Building is required to have a fire alarm system.
2) F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and
located on the "road side" of a structure.
Reviewed by: Eric Dotson Date: 9/22/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION (Repeat)
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
Reviewed by: Sam Weido Date: 9-17-08
(0.111"4"114
CITY OF COLLEGE STATION
Planning d Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 13, 2008
TO: Bill Scarmardo via email: bill@scarmardo
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP) Engineering Comments Only
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
Two (2) revised site plans, only to be submitted after receiving full Planning
comments as well.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
cc: Amir Ostami via email amirrostami@yahoo.com
Case file #08-00500222
STAFF REVIEW COMMENTS
Project: AQUARIUM (SP) - 08-00500222
PLANNING
1. Planning is still reviewing this site plan.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 13, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
3. Site Plan — Please provide water and sanitary sewer demands on the site plan.
4. Site Plan — Please show the full extent of proposed waterline including where it ties into the
existing main on Boyette St.
5. Site Plan — Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
6. Site Plan —The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
8. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
9. Construction Docs — Please provide engineer signed and sealed construction drawings
(including plan and profile) for the proposed waterline extension and fire hydrant.
10. Construction Docs — Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
11. Construction Docs — FYI...In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
12. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee.
13. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
14. Construction Docs — Please provide all applicable City standard details with your
construction drawings.
15. Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reviewed by: Erika Bridges Date: 11/13/08
September 22, 2008
Amirr Ostami via postal: 5729 North Scout Island Circle
Austin, TX 78731
Case file #08-00500222
TO: Lauren A. Hovde, Staff Planner
FROM: Bill Scarmardo via email: bill@scarmardo.com
SUBJECT: AQUARIUM (SP)- Site Plan
STAFF REVIEW COMMENTS NO. 1
Project: AQUARIUM (SP) —08-00500222
PLANNING
1, The second page of the Site Plan Application needs to be completed.
Itis attached. A-
- 2. The building does not meet the minimum setback which is 10' from the back of the curb.
See attached appeals and waiver application. I,, i. F'
a. Please show a curb and pavement detail, along with the pattern for the pavers. A selection
of patterns can be found on page 29 of the Site Design Standards.
Brick Pavers and curcb are existing, i t
. 4. Bald Cypress is not an approved tree for Northgate street trees. A selection of street trees
can be found on page 30 of the Site Design Standards. FYI...CU-Structural Soil by
Amereq,lnc. must be utilized for street tree plantings.
See attached appeals and waiver application. `t - -`
.5.` The relationship between the University Drive right-of-way and the edge of pavement in
unclear. Please clarify, and provide written confirmation from TxDOT that the sidewalk is
out of their right-of-way.
R.O.W.. and curb are noted.
- 6. The sidewalk along University Drive must be at least 12' deep, unless a variance is granted.
It must then be dedicated by the owner to the City of College Station as a public access
easement.
See attached appeals and waiver application. + -
7. Please identify what ground cover will be used at the base of the building on the rear and
side facades. t °
k,
See attached PIP
8. The site must have a minimum of 4 bicycle parking spaces, unless a variance is granted.
You may also coordinate bicycle parking with abutting properties. In such a case,
documentation of the agreement must be provided with the site plan.
See attached appeals and waiver application. • '
9. Please show a detail of the tree grate along with the model name and number.
See attached appeals and waiver application. r4_
1A.All equipment, such as air conditioning units, that serve this site should be shown on the site
plan.
Added Air Conditioning units on plan.
11. Please show the fire department connections, fire lanes, and fire hydrants on the site plan.
'Drawing _ shows lay ofhoue and fire lanes.
12)Ownership, legal description;,and zoning information need to be shown for the abutting
properties, as well as the zoning for the subject property. In addition, the legal description
should be added to the title block area.
- Added information
12. Please amend Note #5 to state, "All roof and ground-mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance."
See attached PIP
14. FYI...Both the front and back facades face a right-of-way, and will therefore need to meet to
requirements for architectural relief elements on both stories of the building.
Added Awning over door and added Cornice at second floor line. `' a"
15. Please change "new steel exist stair" to"new steel exit stair". ' '
Changed Note.
-Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
17Please provide a written agreement with 205 University Drive that states that access to the
stairway in the rear can not be blocked or removed by any future owner.
Attached Agreement
1.8:Please provide a copy of any Private Access Agreement relating to 209 University Drive.
Attached
1,9. It appears that parallel parking is currently allowed along University Drive. Staff is currently
conversing with TxDOT and the City of College Station Public Works Department regarding
the discontinuation of this parking.
Parallel parking along University is shown
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
STREETSCAPING
1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights-of-way, and adjacent property disturbed during
construction.
See attached appeals and waiver application.
2. An irrigation plan for all new plantings must be shown on the site plan.
Not Applicable k
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed
as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
Not Applicable
TXDOT
--Since no additional access is required, no comment.
Review by: Karl Nelson Date: September 19, 2008
ENGINEERING COMMENTS NO. 1
1. Please submit a development permit and associated fee.
Attached
2. Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's. If the easements are
proposed, they will need to be dedicated by separate instrument and recorded prior to site
plan approval.
3. What easement does"Vol 101, Page 204" shown on the site plan pertain to?
See attached Pages
4. If any proposed construction along University Dr. is within TxDOT's right-of-way, a TxDOT
Driveway Permit will need to be obtained.
Not Applicable
5. Please show the limits and provide the widths of the right-of-way for University Dr. and
Patricia St.
Shown
6. Please provide all applicable City standard details with your site plan.
Not Applicable
Reviewed by: Erika Bridges Date: 9/22/08
FIRE
i-) A "Knox Box" security key system is required on the building.
Shown on the front o f the building
2) Building is required to have a fire sprinkle'and fire alarm system.
Sprinkler system will be provided. Drawings will be submitted for approval as they are
complete.
3) F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and
located on the "road side" of a structure.
Shown on site plan
Reviewed by: Eric Dotson Date: 9/22/08
SANITATION
I. Sanitation is ok with this project.
Reviewed by: Wally Urrutia/ Rodney Harris Date: September 17, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes per CSU specs and design (pull provided by CSU).
8. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
9. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
Added all notes to Site plan.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 9-17-08
(.*ff1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
Cr1Y OF COLLEGE STATION
MEMORANDUM
September 22, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
Four (4) revised site plans;
One (1) 11x17 erosion control plan;
Easement Dedication Sheet and required documents (please note that the Site
Plan will not be stamped approved until the Blanket Easement, or all other
appropriate easements, have been dedicated to the City of College Station).
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
contact Lauren A. Hovde at 979.764.3570.
Attachments: Staff review comments
pc: Amirr Ostami via postal: 5729 North Scout Island Circle
Austin, TX 78731
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 1
Project: AQUARIUM (SP) —08-00500222
PLANNING
1. The second page of the Site Plan Application needs to be completed.
2. The building does not meet the minimum setback which is 10' from the back of the curb.
3. Please show a curb and pavement detail, along with the pattern for the pavers. A selection
of patterns can be found on page 29 of the Site Design Standards.
4. Bald Cypress is not an approved tree for Northgate street trees. A selection of street trees
can be found on page 30 of the Site Design Standards. FYI...CU-Structural Soil by
Amereq,Inc. must be utilized for street tree plantings.
5. The relationship between the University Drive right-of-way and the edge of pavement in
unclear. Please clarify, and provide written confirmation from TxDOT that the sidewalk is
out of their right-of-way.
6. The sidewalk along University Drive must be at least 12' deep, unless a variance is granted.
It must then be dedicated by the owner to the City of College Station as a public access
easement.
7. Please identify what ground cover will be used at the base of the building on the rear and
side facades.
8. The site must have a minimum of 4 bicycle parking spaces, unless a variance is granted.
You may also coordinate bicycle parking with abutting properties. In such a case,
documentation of the agreement must be provided with the site plan.
9. Please show a detail of the tree grate along with the model name and number.
10. All equipment, such as air conditioning units, that serve this site should be shown on the site
plan.
11. Please show the fire department connections, fire lanes, and fire hydrants on the site plan.
12. Ownership, legal description, and zoning information need to be shown for the abutting
properties, as well as the zoning for the subject property. In addition, the legal description
should be added to the title block area.
13. Please amend Note #5 to state, "All roof and ground-mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance."
14. FYI...Both the front and back facades face a right-of-way, and will therefore need to meet to
requirements for architectural relief elements on both stories of the building.
15. Please change "new steel exist stair" to "new steel exit stair".
16. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
17. Please provide a written agreement with 205 University Drive that states that access to the
stairway in the rear can not be blocked or removed by any future owner.
18. Please provide a copy of any Private Access Agreement relating to 209 University Drive.
19. It appears that parallel parking is currently allowed along University Drive. Staff is currently
conversing with TxDOT and the City of College Station Public Works Department regarding
the discontinuation of this parking.
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
STREETSCAPING
1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights-of-way, and adjacent property disturbed during
construction.
2. An irrigation plan for all new plantings must be shown on the site plan.
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed
as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
TXDOT
Since no additional access is required, no comment.
Review by: Karl Nelson Date: September 19, 2008
ENGINEERING COMMENTS NO. 1
1. Please submit a development permit and associated fee.
2. Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's. If the easements are
proposed, they will need to be dedicated by separate instrument and recorded prior to site
plan approval.
3. What easement does "Vol 101, Page 204" shown on the site plan pertain to?
4. If any proposed construction along University Dr. is within TxDOT's right-of-way, a TxDOT
Driveway Permit will need to be obtained.
5. Please show the limits and provide the widths of the right-of-way for University Dr. and
Patricia St.
6. Please provide all applicable City standard details with your site plan.
Reviewed by: Erika Bridges Date: 9/22/08
FIRE
1) A "Knox Box" security key system is required on the building.
2) Building is required to have a fire sprinkler and fire alarm system.
3) F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and located
on the "road side" of a structure.
Reviewed by: Eric Dotson Date: 9/22/08
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia / Rodney Harris Date: September 17, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes per CSU specs and design (pull provided by CSU).
8. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
9. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 9-17-08
MEMORANDUM
September 16, 2010
TO: Lauren Hovde, Staff Planner
FROM: Bill Scarmardo via email: bill@scarmardo.com
SUBJECT: Aquarium (SP) - Site Plan
The following page is a response to the staff review comments detailing items that needed to be
addressed.
$668 processing fee for the next round of three (3) staff reviews
` ' not. Amir to submit to City
1)o •
Li/rA Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will.14 AO" be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Easement Dedication Sheet and required documents
•�., s`A, ,'��t . ..
Case file #u8-005002 •
5abnitiii-eol ins OY
t(6 •
'cam, dove, Ldit\loS � GonS'hrGlGfiaP
Weal picw , itkoryktfut
• of '?'
01 .0. 10
: 6v
l�
STAFF REVIEW COMMENTS NO. 3
Project: Aquarium (Sp) - 08-00500222
PLANNING
A public access easement must be dedicated to the City along University Drive. The
easement should extend from the property line to the building façade.
This easement has been prepared and has been given to Debrah Grace.
. As discussed previously, Staff has not received documentation regarding the ownership
of the lot north of Aquarium Bar. An easement cannot be dedicated on this property until
the ownership is resolved. There are also utility improvements being made to this
property, and so the owner should be involved.
An easement has been dedicated as indicated on the site plan along the north
east property line of lot 1 block 8 of 200 University Drivwe, LLC
. The staircase at the rear of Schotzi's extends outside of the access easement.
Stairway was re-designed to fit within owner's existing property on lot1. The,. f
existing Access Easement was redone to include the larger stair. . I . y j f '• •
• ,1, '
V" Is the bench along University Drive being installed? A waiver was approved by the `
Design Review Board.
Bench was removed.
® Mechanical equipment must be screened 100% from view. The staircase will not
adequately screens the air conditioning units.
A 6' wd privacy fence was added ith a6'' douub ``K►vYl le�gate for access.to p screen
existing mechanical equipment. n
IIJ�t 1 r " ') 1 �n w bu llct•(i
Please show the property line of the subject property. There does seem to be a space
between Schotzi's and Aquarium Bar that will require groundcover.
The existing,paving between the building and the, drive will be cleaned and
repaired. . , ; . . • .I . 1 , 1 ,
7 Please•indibateihe distance`to the iearfire hydrant, t . • • ' r
Distartee:is"llsbwr£
.Y :y
.Has it been discovered that the existing sewe'r line is claytile? . •
• :Vote removed. '
•
9, Pleas4 identify th building height nd square ootage.
- ; The building height an s wialh are shown.
• '
4
MEMORANDUM
September 16, 2010
TO: Lauren Hovde, Staff Planner
FROM: Bill Scarmardo via email: bill@scarmardo.com
SUBJECT: Aquarium (SP) - Site Plan
The following page is a response to the staff review comments detailing items that needed to be
addressed.
$668 processing fee for the next round of three (3) staff reviews
` ' not. Amir to submit to City
1)o •
Li/rA Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will.14 AO" be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Easement Dedication Sheet and required documents
•�., s`A, ,'��t . ..
Case file #u8-005002 •
5abnitiii-eol ins OY
t(6 •
'cam, dove, Ldit\loS � GonS'hrGlGfiaP
Weal picw , itkoryktfut
• of '?'
01 .0. 10
: 6v
l�
. Four bicycle parking spaces are required, plus one additional spaces per 1000 square
1
feet of building area when the building exceeds 2000 square feet.
6 bicycle spaces are shown.
11. All new planting must be irrigated. Irrigation plans must be sealed by a licensed irrigator.
A hose bib is provided at the front bed.
12. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren Hovde, Staff Planner Date: July 6, 2010
Please contact me at your earliest convenience to schedule a facilitation meeting. We
recommend not submitting copies for stamping until after this meeting.
NGINEERING COMMENTS NO. 3
WI- 1. Please submit a Development Permit and Development Permit Application Fee.
Amir to submit the development permit seperatly.
\
Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's.
10 ft. PUE is removed and added the new easement along the north east
property line of lot 1 of 200 university Drive, LLC.
a e @ Site Plan—Please provide water and sanitary sewer demands on the site plan.
The number of Fixture units is 47. Table 2 from the chart. It was not clear as to
how we are to convert the fixture units to gpm. �
Irk
�/ %�
.
• . Site Plan -- Please show the full extent of proposed waterline i c •'n• ' ' here it ties into the
existing main on Boyette St.
Fire Line is shown on,site plan.
i.i; 5.\ Site Plan —Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
The domestic waterline, firegline, and water meter and fire hydrant are shown on
'V
drawing. �1� 1C 1 -1r oi c { YvIt-ienLi
n11124_ p6. Site Plan —The FDC connection needs to be shown and labeled on the site plan at the back
f"- )/ of the building facing the fire lane.
This needs to be shown and labeled on the site plan.
FU �' ick ) u�- QGZSiI9 (iCCo3L1 '
-k-1)*' ir 6,-,e, /
- I 1 N ) ,()NA i(' OA a i1d
- 7,k 7.'`' Site Plan — The fire hydrant is required to be within a public utility easement. Easement
')• t
dedication
documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• The proposed 10'x15' Public Utility Easement is shown and labeled. Volume and
page number or not know yet. feiNALV \, 'L\,,,,,.,,,,,,, es . ft =k
', ,, qj. Site Plan — Please provide a letter stating that you have been granted permission to pla e (l i 10,1
the proposed utilities (public and private) on private property.
All new utilities lie pyitth(in the owners property V`` "f
t-e.X6( 1()(Nt'et use.
\V Construction Docs — Please provide engineer signed and seal construction drawings
ii
(including plan and profile) for the proposed waterline extension and fire hydrant.
A sealed set of construction documents have been submitted separately.
,� 'Ik'EConstruction
Docs—Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
CY Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
The development permit fee and the fuire report is to be submitted by Gattis
Engineering with the construction Estimate of the proposed waterline
construction.
1 ` (JConstruction Docs—FYI...In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
This will be included in the Fire Flow report from Gattis Engineering..
•4c) 12. Repeat Comment) Construction Docs —The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
T�hiiss is shown on the gattis Engineering Construction Drawings.
,y'r-
1 kt : Loa illC% 1-{c 2 ttr
Reviewed by: Erika Bridges Date: 7/7/10
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. By the nature of the design the Owner/ Developer will be responsible for maintaining the
overhead electrical service wiring to Zapatos and City Barber Shop.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 26 weeks.
5. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
. Four bicycle parking spaces are required, plus one additional spaces per 1000 square
1
feet of building area when the building exceeds 2000 square feet.
6 bicycle spaces are shown.
11. All new planting must be irrigated. Irrigation plans must be sealed by a licensed irrigator.
A hose bib is provided at the front bed.
12. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren Hovde, Staff Planner Date: July 6, 2010
Please contact me at your earliest convenience to schedule a facilitation meeting. We
recommend not submitting copies for stamping until after this meeting.
NGINEERING COMMENTS NO. 3
WI- 1. Please submit a Development Permit and Development Permit Application Fee.
Amir to submit the development permit seperatly.
\
Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's.
10 ft. PUE is removed and added the new easement along the north east
property line of lot 1 of 200 university Drive, LLC.
a e @ Site Plan—Please provide water and sanitary sewer demands on the site plan.
The number of Fixture units is 47. Table 2 from the chart. It was not clear as to
how we are to convert the fixture units to gpm. �
Irk
�/ %�
.
• . Site Plan -- Please show the full extent of proposed waterline i c •'n• ' ' here it ties into the
existing main on Boyette St.
Fire Line is shown on,site plan.
i.i; 5.\ Site Plan —Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
The domestic waterline, firegline, and water meter and fire hydrant are shown on
'V
drawing. �1� 1C 1 -1r oi c { YvIt-ienLi
n11124_ p6. Site Plan —The FDC connection needs to be shown and labeled on the site plan at the back
f"- )/ of the building facing the fire lane.
This needs to be shown and labeled on the site plan.
FU �' ick ) u�- QGZSiI9 (iCCo3L1 '
-k-1)*' ir 6,-,e, /
- I 1 N ) ,()NA i(' OA a i1d
- 7,k 7.'`' Site Plan — The fire hydrant is required to be within a public utility easement. Easement
')• t
dedication
documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• The proposed 10'x15' Public Utility Easement is shown and labeled. Volume and
page number or not know yet. feiNALV \, 'L\,,,,,.,,,,,,, es . ft =k
', ,, qj. Site Plan — Please provide a letter stating that you have been granted permission to pla e (l i 10,1
the proposed utilities (public and private) on private property.
All new utilities lie pyitth(in the owners property V`` "f
t-e.X6( 1()(Nt'et use.
\V Construction Docs — Please provide engineer signed and seal construction drawings
ii
(including plan and profile) for the proposed waterline extension and fire hydrant.
A sealed set of construction documents have been submitted separately.
,� 'Ik'EConstruction
Docs—Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
CY Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
The development permit fee and the fuire report is to be submitted by Gattis
Engineering with the construction Estimate of the proposed waterline
construction.
1 ` (JConstruction Docs—FYI...In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
This will be included in the Fire Flow report from Gattis Engineering..
•4c) 12. Repeat Comment) Construction Docs —The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
T�hiiss is shown on the gattis Engineering Construction Drawings.
,y'r-
1 kt : Loa illC% 1-{c 2 ttr
Reviewed by: Erika Bridges Date: 7/7/10
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. By the nature of the design the Owner/ Developer will be responsible for maintaining the
overhead electrical service wiring to Zapatos and City Barber Shop.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 26 weeks.
5. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
Shown on Site Plan
6. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 6-29-10
SANITATION
0/Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: June 29, 2010
FIR
1 The FDC is not shown on the site plan.
A FDC is shown on the north west corner of building.
ii
Alarm is required the extent will be determined upon review of the building plans.
A sprinkler system and fire alarm will be provided.
0 Knox Box is required on this structure.
A knox will be provided
Reviewed by: Eric Dotson Date: 7/1/10
14. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee. CQ�
Will be Submitted with the Fire Sprinkler Drawings.
15. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
Providing new water line. Reference Patricia Street water modification — Gattis
Engineering.
Construction Docs — Please provide all applicable City standard details with your
construction drawings.
Reference Patricia Street Water Line modification — Gattis Engineering
.47. Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reference Patricia Street Water Line modification — Gattis Engineering
Reviewed by: Erika Bridges Date: 11/13/08
FIRE (Repeat)
1) Building is required to have a fire alarm system.
Will submit Sprinkler drawings.
2) F.D.C. locations will be within one hundred and fifty feet (150) of a fire hydrant
and located on the "road side" of a structure.
Providing new Fire Hydrant on Patricia Street.
Reviewed by: Eric Dotson Date: 9/22/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION (Repeat)
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
Electrical Design was changes and an easement is not required.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
Will provide legal description of easement after the new underground electrical
line is installed.
Reviewed by: Sam Weido Date: 9-17-08
(*— /J'�� 1101 Texas Avenue, P.O. Box 9960
1� College Station, Texas 77842
CII' OF COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 14, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP) - Site Plan
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Four (4) revised site plans.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Amir Ostami via email: amirrostami@yahoo.com
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 2
Project: AQUARIUM (SP) - 08-00500222
PLANNING
1. Please provide a letter of confirmation from 200 U Drive LLC, that they are aware of the
alternations being made to 209 University Drive.
2. As discussed over the phone on November 13, 2008, please provide written permission
from the abutting property owner to allow the exit stair, screening, and utility lines to
extend onto or through their property. Also, written permission must be granted from the
Boyett property to extend the utility lines through it.
3. The 8-ft Access Easement Agreement needs to be filed with Brazos County and a
volume and page number provided on the site plan. Please also submit a copy of the
recorded document. This agreement shows that the easement extends onto land that is
not owned by either party. Please revise this agreement to remove any portion that is
owned by a non -participating party, or please include the owner of said property in the
agreement.
4. Since alterations are being made to the W.C. Boyett property, please show how that
property will be brought into compliance with the NG-1 standards. This property owner
must be brought into the site plan process. The Site Plan Application must be revised to
include this property owner's contact information and signature.
5. Please provide a copy of the shared bicycle parking agreement, along with the number
of spaces provided. Staff will need to determine if there are an adequate number of
spaces to serve both properties.
6. During a previous phone conversation, it was stated that the planter on the front fagade
was being left in place as an alternative to the street tree requirement. The site plan
notes that the planter will be removed. Please clarify.
7. Please confirm that they is no 100-year floodplain on the property by providing a
FEMA/FIRM map number.
8. Repeat Comment - Please show the ownership of the abutting properties. The business
name is helpful, but the owner name is required.
9. When the scale is increased, as requested in the engineering comments, please show
the near -by driveways.
10. Repeat Comment - Please label the fire lane on the site plan.
11. Repeat Comment - Please show a curb and pavement detail, along with the pattern for
the pavers. A selection of patterns can be found on page 29 of the Site Design
Standards. Even if the pavers are existing, please show a detail of the pattern. Thanks.
12. Repeat Comment - The second page of the Site Plan Application needs to be
completed. Staff can make these changes per your request.
13. Repeat Comment - Please identify what ground cover will be used at the base of the
building on the rear and side facades.
14. Repeat Comment - Provide a general note that 100% coverage of groundcover,
decorative paving, decorative rock (not loose), or a perennial grass is required in parking
lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and
adjacent property disturbed during construction.
15. An application to DRB has been received for:
a. 12' sidewalk along University Drive, the existing sidewalk varies from 8'-10'.
b. Street trees
c. Street benches
d. Reduction in transparency requirement
16. Reminder: Please re -submit elevations for staff review.
17. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 14, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
3. Site Plan — Please provide water and sanitary sewer demands on the site plan.
4. Site Plan — Please show the full extent of proposed waterline including where it ties into the
existing main on Boyette St.
5. Site Plan — Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
6. Site Plan — Our records indicate a 5-ft PUE (Vol.7462/Pg.246) along Patricia St. Please
verify and show on site plan if it is on the property.
7. Site Plan — Our records indicate an existing sanitary sewer line running parallel to the
proposed water line and crossing Patricia into the parking lot. Please show and label on the
site plan.
8. Site Plan — The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane.
9. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
10. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
11. Construction Docs — Please provide engineer signed and sealed construction drawings
(including plan and profile) for the proposed waterline extension and fire hydrant.
12. Construction Docs— Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
13. Construction Docs — FYI... In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
14. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee.
15. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
16. Construction Docs — Please provide all applicable City standard details with your
construction drawings.
17. Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reviewed by: Erika Bridges Date: 11/13/08
FIRE (Repeat)
1) Building is required to have a fire alarm system.
2) F.D.C. locations will be within one hundred and fifty feet (150) of a fire hydrant and
located on the "road side" of a structure.
Reviewed by: Eric Dotson Date: 9/22/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION (Repeat)
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
Reviewed by: Sam Weido Date: 9-17-08
STAFF REVIEW COMMENTS
Project: AQUARIUM (SP) - 08-00500222
PLANNING
1. Planning is still reviewing this site plan.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 13, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
3. Site Plan — Please provide water and sanitary sewer demands on the site plan.
4. Site Plan — Please show the full extent of proposed waterline including where it ties into the
existing main on Boyette St.
5. Site Plan — Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed.
6. Site Plan — The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
8. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
9. Construction Docs — Please provide engineer signed and sealed construction drawings
(including plan and profile) for the proposed waterline extension and fire hydrant.
10. Construction Docs — Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report.
11. Construction Docs — FYI... In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft/s maximum limit.
12. Construction Docs — The fire suppression line is required to have an isolation valve just
within the PUE. Please note on the plans that the fire suppression line shall have a lockable
lid on the isolation valve. The lockable lid shall supply the same protection as the AMP or
USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved by
College Station Utilities Director or his designee.
13. Construction Docs — If you are anticipating utilizing the proposed 6-in waterline for fire
suppression and domestic water service, it will need to tee off into two separate lines after
the fire hydrant. The isolation valve and meter box are required to be just within a PUE, and
the remainder of the lines private.
14. Construction Docs — Please provide all applicable City standard details with your
construction drawings.
15. Construction Docs — Please provide a Temporary Traffic Control Plan for Boyette St. and
Patricia St. to be utilized during the waterline construction.
Reviewed by: Erika Bridges Date: 11/13/08
September 22, 2008
Amirr Ostami via postal: 5729 North Scout Island Circle
Austin, TX 78731
Case file #08-00500222
TO: Lauren A. Hovde, Staff Planner
FROM: Bill Scarmardo via email: bill@scarmardo.com
SUBJECT: AQUARIUM (SP)- Site Plan
STAFF REVIEW COMMENTS NO. 1
Project: AQUARIUM (SP)-08-00500222
PLANNING
1 The second page of the Site Plan Application needs to be completed.
Itis attached. — !;roi,s s (-
- 2. The building does not meet the minimum setback which is 10' from the back of the curb.
See attached appeals and waiver application. �" -D-2-6
43. Please show a curb and pavement detail, along with the pattern for the pavers. A selection
of patterns can be found on page 29 of the 1Site Design Standards.
Brick Pavers and curcb are existing]
_. 4. Bald Cypress is not an approved tree for Northgate street trees. A selection of street trees
can be found on page 30 of the Site Design Standards. FYI ... CU-Structural Soil by
Amereq,lnc. must be utilized for street tree plantings.
See attached appeals and waiver application. Z
The relationship between the University Drive right-of-way and the edge of pavement in
unclear. Please clarify, and provide written confirmation from TxDOT that the sidewalk is
out of their right-of-way.
R.O.W. and curb are noted
6. The sidewalk along University Drive must be at least 12' deep, unless a variance is granted.
It must then be dedicated by the owner to the City of College Station as a public access
easement.
See attached appeals and waiver application. i--'
7, Please identify what ground cover will be used at the base of the building on the rear and
side facades. `
See attached PIP G 400 lr�d( 6Ye �C r Ge ri� raj
8 The site must have a minimum of 4 bicycle parking spaces, unless a variance is granted.
You may also coordinate bicycle parking with abutting properties. In such a case,
documentation of the agreement must be provided with the site plan.
See attached appeals and waiver application. -DybV iG'C G CCye -I U'F Q ti
--. # - o-f Spac-p-.S
9. Please show a detail of the tree grate along with the model name and number.
See attached appeals and waiver application. 1
11 . All equipment, such as air conditioning units, that serve this site should be shown on the site
plan.
Added Air Conditioning units on plan.
C1.,Please show the fire department connections, fire lanes, and fire hydr"n on the site plan.
1Drawing —shows lay ofhoue and fire lanes. � � �G A_el, *-
Y� V
12.Owners legal description; and zoning4formation need to be shown for the abutting
properties as well as the zoning for the subject property. In addition, the legal description
should be added to the title block area.
Added information ` I Y i�Q Yi d btw (1Q�11-Q. is
13: Please amend Note #5 to state, "All roof and ground -mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance."
See attached PIP
�14. FYI... Both the front and back facades face a right-of-way, and will therefore need to meet to
requirements for architectural relief elements on both stories of the building. 1
Added Awning over door and added Comice at second Boor line. S�,l M i-v &C VCk-h dV-
6. Please change "new steel exist stair" to "new steel exit stair'. PI cA66
Changed Note.
W. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
4' Please provide a written agreement with 205 University Drive that states that access to the
stairway in the rear can not be blocked or removed by any future owner.
Attached Agreement
1.8: Please provide a copy of any Private Access Agreement relating to 209 University Drive.
Attached
�10. It appears that parallel parking is currently allowed along University Drive. Staff is currently
conversing with TxDOT and the City of College Station Public Works Department regarding
the discontinuation of this parking.
Parallel parking along University is shown
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
STREETSCAPING
1 Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights -of -way, and adjacent property disturbed during
construction.
See attached appeals and waiver application.
2. An irrigation plan for all new plantings must be shown on the site plan.
Not Applicable
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
MISCELLANEOUS
1.- Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed
as per City Ordinance 2394.
2i All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
NotApplicable
TXDOT
Since no additional access is required, no comment.
Review by: Karl Nelson Date: September 19, 2008
ENGINEERING COMMENTS NO. 1
1. Please submit a development permit and associated fee.
Attached
2. Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's. If the easements are
proposed, they will need to be dedicated by separate instrument and recorded prior to site
plan approval.
3. What easement does "Vol 101, Page 204" shown on the site plan pertain to?
See attached Pages
4. If any proposed construction along University Dr. is within TxDOT's right-of-way, a TxDOT
Driveway Permit will need to be obtained.
NotApplicable
5. Please show the limits and provide the widths of the right-of-way for University Dr. and
Patricia St.
Shown
6. Please provide all applicable City standard details with your site plan.
NotApp&cable
Reviewed by: Erika Bridges Date: 9/22/08
FIRE
4f A "Knox Box" security key system is required on the building.
Shown on the front o fthe building
22) Building is required to have a fire sprinkler andfire alarm system.
Sprinkler system will be provided. Drawings will be submitted for approval as they are
complete.
3). F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and
located on the "road side" of a structure.
Shown on site plan
Reviewed by: Eric Dotson
SANITATION
/ Sanitation is ok with this project.
Reviewed by: Wally Urrutia / Rodney Harris
Date: 9/22/08
Date: September 17, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1 Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2 Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes per CSU specs and design (pull provided by CSU).
8. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
9. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
Added all notes to Site plan.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 9-17-08
♦ /�1 1101 Texas Avenue, P.O. Box
9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
September 22, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP)- Site Plan
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
Four (4) revised site plans;
One (1) 11x17 erosion control plan;
Easement Dedication Sheet and required documents (please note that the Site
Plan will not be stamped approved until the Blanket Easement, or all other
appropriate easements, have been dedicated to the City of College Station).
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
contact Lauren A. Hovde at 979.764.3570.
Attachments: Staff review comments
PC: Amirr Ostami via postal: 5729 North Scout Island Circle
Austin, TX 78731
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 1
Project: AQUARIUM (SP) — 08-00500222
PLANNING
1. The second page of the Site Plan Application needs to be completed.
2. The building does not meet the minimum setback which is 10' from the back of the curb.
3. Please show a curb and pavement detail, along with the pattern for the pavers. A selection
of patterns can be found on page 29 of the Site Design Standards.
4. Bald Cypress is not an approved tree for Northgate street trees. A selection of street trees
can be found on page 30 of the Site Design Standards. FYI...CU-Structural Soil by
Amereq,Inc. must be utilized for street tree plantings.
5. The relationship between the University Drive right-of-way and the edge of pavement in
unclear. Please clarify, and provide written confirmation from TxDOT that the sidewalk is
out of their right-of-way.
6. The sidewalk along University Drive must be at least 12' deep, unless a variance is granted.
It must then be dedicated by the owner to the City of College Station as a public access
easement.
7. Please identify what ground cover will be used at the base of the building on the rear and
side facades.
8. The site must have a minimum of 4 bicycle parking spaces, unless a variance is granted.
You may also coordinate bicycle parking with abutting properties. In such a case,
documentation of the agreement must be provided with the site plan.
9. Please show a detail of the tree grate along with the model name and number.
10. All equipment, such as air conditioning units, that serve this site should be shown on the site
plan.
11. Please show the fire department connections, fire lanes, and fire hydrants on the site plan.
12. Ownership, legal description, and zoning information need to be shown for the abutting
properties, as well as the zoning for the subject property. In addition, the legal description
should be added to the title block area.
13. Please amend Note #5 to state, "All roof and ground -mounted mechanical equipment shall
be screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance."
14. FYI... Both the front and back facades face a right-of-way, and will therefore need to meet to
requirements for architectural relief elements on both stories of the building.
15. Please change "new steel exist stair" to "new steel exit stair".
16. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
17. Please provide a written agreement with 205 University Drive that states that access to the
stairway in the rear can not be blocked or removed by any future owner.
18. Please provide a copy of any Private Access Agreement relating to 209 University Drive.
19. It appears that parallel parking is currently allowed along University Drive. Staff is currently
conversing with TxDOT and the City of College Station Public Works Department regarding
the discontinuation of this parking.
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
STREETSCAPING
1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage
areas, the parking lot setback, rights -of -way, and adjacent property disturbed during
construction.
2. An irrigation plan for all new plantings must be shown on the site plan.
Reviewed by: Lauren A. Hovde, Staff Planner Date: September 18, 2008
MISCELLANEOUS
1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed
as per City Ordinance 2394.
2. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394.
TXDOT
Since no additional access is required, no comment.
Review by: Karl Nelson
ENGINEERING COMMENTS NO. 1
Date: September 19, 2008
1. Please submit a development permit and associated fee.
2. Please provide volume and page number of the existing 10-ft Electrical Easement and the 8-
ft Access Easement shown between your property and Schotzi's. If the easements are
proposed, they will need to be dedicated by separate instrument and recorded prior to site
plan approval.
3. What easement does "Vol 101, Page 204" shown on the site plan pertain to?
4. If any proposed construction along University Dr. is within TxDOT's right-of-way, a TxDOT
Driveway Permit will need to be obtained.
5. Please show the limits and provide the widths of the right-of-way for University Dr. and
Patricia St.
6. Please provide all applicable City standard details with your site plan.
Reviewed by: Erika Bridges Date: 9/22/08
FIRE
1) A "Knox Box' security key system is required on the building.
2) Building is required to have a fire sprinkler and fire alarm system.
3) F.D.C. locations will be within one hundred and fifty feet (150') of a fire hydrant and located
on the "road side" of a structure.
Reviewed by: Eric Dotson Date: 9/22/08
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia / Rodney Harris Date: September 17, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines.
2. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes per CSU specs and design (pull provided by CSU).
8. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
9. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 9-17-08
-pasodad se
;ueipAq an; ay; Iagel AIJealO osle aseald azls S;I q;lnn ;S 9;1940e uo ulew bul;Slxa ay; pue
leua;ew pue azls pm sauipelem pasodoad Ile lapel aseald — ueld a;IS (;uawwoo;eada�j) .9
'llann
se ueld a;ls ay; uo UMOLIS aq o; spaau pue pau6lsap uaaq ;ou seq aull an; aql
;S a;;aAo8 uo ulew 6ul;slxa aq; o;ul sal;;I aJagnA
6ulpnloul eullje;em pesodoid;o;ua;xa Iln; aq; AAogs aseald — ueld a;IS (;uawwoo;eedab) .£
-saagwnu asaq; wjl;uoO pue apoO 6ulgwnld Ieuol;euJa;ul aq;
;e Tool aseald •wd6 96; puewap dead aq; a)lew pinom s141 •a;nulw jad suolle6
6y ;noqe aq pinonn puewap ja;enn eBeaane ay; 81l1 s)lool ;1 `nog( o; paplAoid
seen Ml (£)£'£0O algel - epoO 6ulgwnld leuol;eWOM 60OZ ay; uo pase8
ueld a;ls
ay; uo spuewap aannas tie;hies pue Ja;enn apinad aseald — Ueld a;IS (;uawwo0;eadaZl) Z
;oafoid;uawanoadwl au11184eM';S e1314ed
aq; jo ;aafold slq; 44IM popwgns uaaq jeA ;ou Senn eel ;lwaad ;uawdolanap y
-aad uol;eollddy
;lwJad ;uewdOlanaO pue ;lwaad ;uawdOlana(] a ;lwgns aseald (;uawwoO ;eada�j)
VON S1N3WWOO ONIN33NION3
060Z 'OZ aagwa;daS :a;ea Jauueld }ye;S 'apnoH uaane] :Aq pannalAay
00 o; joud ul
palll; eq ueo;eq; � uelq a aneal aseald 'sueld aq; anoadde o; peau am awl; aq; Aq pall} aq;,uom
s;uawasea ay; SOuIS -;uawasea goes Jq} papinad aq;snw sjegwnu abed pue awnloA aq
„;uawase3 ssaooy ollgnd„ a se aseOne;s aq; jo;;uawasea ss000e aq; lapel aseofd
'pessnoslp se 's,lz;ogoS pue so;edeZ ueampq saps buipllnq aq; uo sl IA aae
;,usaop slq; eoeld Aluo aql Nemapls eq; pue 6uwppnq aq; uaann;aq palle;sul aq;snw sjeAe
xoq xou>I aq; Iagei as I
s;uawannbei wnwlulw 6upoew;,usl apeoe;;eq; u
'apeoe;;uoa; aq; jo; sl;l;I �,io;;aags ay;;o wo;;oq ag; uo elnwjo; Aouaiedsuei; eq; sl;eq�
;g6laq 6ulplmq aq; apinad aseald
wa;sAs pa;ewo;ne ue uo eq;snw uol;e61 jI
-sia;aw u014e61in pue Ou;oala aq; legel aseald li 1
aaO; PUe;s . d d,, saop;e
aoueulp�o slg;;aawIOU seop aoua; po Meld
y '6ulplmq ag; uo asn esoq; o; joloo pue leua;ew ul a;eulpi000;snw sleua;ew buluaa�S
ONINNVId
ZZZ00900-90 - (dS) wnljenby :;OafoJd
VON S1N3WWOO M31A3N dd`d1S
• The domestic waterline and fire line need to be labeled with size and material.
6. (Repeat Comment) Site Plan — The FDC connection needs to be shown and labeled on the
site plan at the back of the building facing the fire lane.
• This needs to be shown and labeled on the site plan. The current location is not
facing a fire lane and will not be accessible for the fire department.
• The FDC must be connected to a separate waterline from the proposed fire line
as shown. Please revise.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• Please provide blank spaces for the volume and page number to be filled in after
they are filed. As a reminder, they must be filed prior to CO.
• The Electrical Dept. has indicated to me that a 5-ft Public Utility Easement on the
adjacent property and along the back of the Aquarium Bar lot will be sufficient to
provide access to public infrastructure. The private fire line should not encroach
in this easement.
8. (Repeat Comment) Site Plan — Please provide a letter stating that you have been granted
permission to place the proposed utilities (public and private) on private property.
• Please provide a private utility easement for the private fire line or a letter from
the property owner granting permission for utilities to be placed on his property.
9. (Repeat Comment) Construction Does — Please provide engineer signed and sealed
construction drawings (including plan and profile) for the proposed waterline extension and
fire hydrant.
• As a reminder, the Patricia St. Waterline will need to be built and accepted prior
to issuance of CO.
10. (Repeat Comment) Construction Does — Please submit the Public Infrastructure Inspection
Fee, Engineer's Cost Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire
Flow Report.
• The development permit fee and fire flow report have not been submitted. Also,
the fire line has not been included in the Patricia St. Waterline Design and will
need to be included with this project.
11. (Repeat Comment) Construction Does — FYI ... In addition to meeting all requirements in
BCS Design Guidelines, the fire flow report will need to show that the velocity within
existing or proposed mains does not exceed the 12 ft/s maximum limit.
• The Fire Flow report needs to be submitted with this project.
12. (Repeat Comment) Construction Does — The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
• Please provide a note on the site plan stating this information.
Reviewed by: Erika Bridges Date: September 21, 2010
1101 Texas Avenue, P.O. Box
9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OP COU k.Gi'. STATION
Nomen/T.MMW( '-
MEMORANDUM
July 7, 2010 11.0
TO: Bill Scarmardo via email: bill scarmardo.com\ .
FROM: Lauren Hovde, Staff Planner
SUBJECT: Aquarium (SP) - Site Plan
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by any Monday at 10:00 a.m. for further staff review:
$668 processing fee for the next round of three (3) staff reviews
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
Easement Dedication Sheet and required documents
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining.the details. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments `Z
PC: Amir Ostami via email: amirrostami@yahoo.comJ QU)
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO. 3
Project: Aquarium (Sp) - 08-00500222
PLANNING
1. A public access easement must be dedicated to the City along University Drive. The
easement should extend from the property line to the building fagade.
2. As discussed previously, Staff has not received documentation regarding the ownership
of the lot north of Aquarium Bar. An easement cannot be dedicated on this property until
the ownership is resolved. There are also utility improvements being made to this
property, and so the owner should be involved.
3. The staircase at the rear of Schotzi's extends outside of the access easement.
4. Is the bench along University Drive being installed? A waiver was approved by the
Design Review Board.
5. Mechanical equipment must be screened 100% from view. The staircase will not
adequately screens the air conditioning units.
6. Please show the property line of the subject property. There does seem to be a space
between Schotzi's and Aquarium Bar that will require groundcover.
7. Please indicate the distance to the near fire hydrant.
8. Has it been discovered that the existing sewer line is claytile?
9. Please identify the building height and square footage.
10. Four bicycle parking spaces are required, plus one additional spaces per 1000 square
feet of building area when the building exceeds 2000 square feet.
11. All new planting must be irrigated. Irrigation plans must be sealed by a licensed irrigator.
12. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren Hovde, Staff Planner Date: July 6, 2010
Please contact me at your earliest convenience to schedule a facilitation meeting We
recommend not submitting copies for stamping until after this meeting.
ENGINEERING COMMENTS NO. 3
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.
• A development permit fee was not yet been submitted with this project or the
Patricia St. Waterline Improvement project.
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
• Please remove the 10-ft PUE across Lots 6, 13, and 14. We have requested that
you secure a private utility easement across those lots or at least a letter granting
you access to install and maintain your private services on private property
owned by others.
3. (Repeat Comment) Site Plan — Please provide water and sanitary sewer demands on the
site plan.
• The average and maximum water and sewer demands should be provided in
accordance with the BCS Unified Design Guidelines. One of the methods for
determining these demands is "Method 1 — Fixture Count Determination," which
will give you a peak demand based on the City's adopted Plumbing Code. Please
let me know if you need help determining these demands.
4. (Repeat Comment) Site Plan — Please show the full extent of proposed waterline including
where it ties into the existing main on Boyette St.
• Please coordinate with Gattis Engineering to show the proposed waterline tie—in
correctly.
• The fire line has not been designed and needs to be shown on the site plan as
well.
5. (Repeat Comment) Site Plan — Please label all proposed waterlines with size and material
and the existing main on Boyette St. with its size. Please also clearly label the fire hydrant
as proposed.
• The domestic waterline, fire line, and water meter needs to be labeled with size
and material. The fire hydrant needs to be shown correctly, too.
6. (Repeat Comment) Site Plan — The FDC connection needs to be shown and labeled on the
site plan at the back of the building facing the fire lane.
• This needs to be shown and labeled on the site plan.
7. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval.
• The proposed 10'x15' Public Utility Easement needs to be shown and labeled with
volume and page number. Please coordinate with Gattis Engineering.
8. (Repeat Comment) Site Plan — Please provide a letter stating that you have been granted
permission to place the proposed utilities (public and private) on private property.
9. (Repeat Comment) Construction Docs — Please provide engineer signed and sealed
construction drawings (including plan and profile) for the proposed waterline extension and
fire hydrant.
• The construction documents are still under review.
10. (Repeat Comment) Construction Docs — Please submit the Public Infrastructure Inspection
Fee, Engineer's Cost Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire
Flow Report.
• The development permit fee and fire flow report have not been submitted. Also,
the fire line has not been included in the Patricia St. Waterline Design and will
need to be included with this project.
11. (Repeat Comment) Construction Docs — FYI... In addition to meeting all requirements in
BCS Design Guidelines, the fire flow report will need to show that the velocity within existing
or proposed mains does not exceed the 12 ft/s maximum limit.
• The Fire Flow report needs to be submitted with this project.
12. (Repeat Comment) Construction Docs — The fire line is required to have an isolation valve
just within the PUE. Please note on the plans that the fire suppression line shall have a
lockable lid on the isolation valve. The lockable lid shall supply the same protection as the
AMP or USA, LL562 Locking Lid at a minimum. An alternate lockable lid shall be approved
by College Station Utilities Director or his designee.
Reviewed by: Erika Bridges Date: 7/7110
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. By the nature of the design the Owner / Developer will be responsible for maintaining the
overhead electrical service wiring to Zapatos and City Barber Shop.
3. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
4. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 26 weeks.
5. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
6. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 6-29-10
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: June 29, 2010
FIRE
1) The FDC is not shown on the site plan.
2) Alarm is required the extent will be determined upon review of the building plans.
3) Knox Box is required on this structure.
Reviewed by: Eric Dotson Date: 7/1/10
1101 Texas Avenue, P.O. Box 9960
(*— College Station, Texas 77842
CrfY0FC0TTVGESXnON Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 14, 2008
TO: Bill Scarmardo via email: bill@scarmardo.com
FROM: Lauren A. Hovde, Staff Planner
SUBJECT: AQUARIUM (SP) - Site Plan
Staff reviewed the above -mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Four (4) revised site plans.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Amir Ostami via email: amirrostami@yahoo.com
200 U Drive L.L.0 via fax: 713-314-3510
Case file #08-00500222
STAFF REVIEW COMMENTS NO.2
Project: AQUARIUM (SP) - 08-00500222
PLA
1 Please provide a letter of confirmation from 200 U Drive LLC, that they are aware of the
alternations being made to 209 University Drive.
G2 "
Attached
As discussed over the phone on November 13, 2008, please provide written permission
from the abutting property owner to allow the exit stair, screening, and utility lines to
extend onto or through their property. Also, written permission must be granted from the
Boyett property to extend the utility lines through it.
Access Easement Agreement Document 01019626 Book DR Volume 8952 page
199 grants access for stair onto adjacent property.
�3 The 8-ft Access Easement Agreement needs to be filed with Brazos County and a
volume and page number provided on the site plan. Please also submit a copy of the
recorded document. This agreement shows that the easement extends onto land that is
not owned by eitherpaa_rty. Please revise this agreement to remove any portion that is
owned by a non-partiapating party, or please include the owner of said property in the
agreement.
Access Easement Agreement Document 01019626 Book DR Volume 8952 page
199 grants access for stair onto adjacent property.
04-Since alterations are being made to the W.C. Boyett property, please show how that
property will be brought into compliance with the NG-1 standards. This property owner
must be brought into the site plan process. The Site Plan Application must be revised to
include this property owner's contact information and signature.
Easement is already dedicated and in the process of being signed by Judge
Boyette.
Please provide a copy of the shared bicycle parking agreement, along with the number
of spaces provided. Staff will need to determine if there are an adequate number of
spaces to serve both properties.
Bicycle parking will be provided on Next to Schotzi's as shown on Drawing.
Attached is an agreement from the owner of Schotzi's to allow Bicycle Parking.
On his property.
During a previous phone conversation, it was stated that the planter on the front fagade
was being left in place as an alternative to the street tree requirement. The site plan
notes that the planter will be removed. Please clarity.
Planter remains as per DRB.
Please confirm that they is no 100-year floodplain on the property by providing a
FEMA/FIRM map number.
FEMA map no. 48041C0143C effective date 0710211992. Reference General Notes
Item 1.
Repeat Comment - Please show the ownership of the abutting properties. The business
name is helpful, but the owner name
,.issr.required.
Property owners shown l�jOvkt v� ?
When the scale is increased, as requested in the engineering comments, please show
the near -by driveways.
� See water line engineering drawings submitted by Gattis Engineering.
D Repeat Comment - Please label the fire lane on the site plan.
After discussion with Fire Marshall, a fire line is not require. The Fire Dept. will
use Patricia Street.
� 1�1. Repeat Comment - Please show a cur nd pavement detail, along with the pattern for
the pavers. A selection of patteFnT can be found on page 29 of the Site Design
Standards. Even if the pavers are existing, please show a detail of the pattern., Thanks.
The drawings show the existing Pavers as previously Installed. W � t /l.t f94A 43
VRepeat Comment - The second page of the Site Plan Application needs to be
completed. Staff can make these changes per your request.
Lauren Hovde has agreed to make the needed Changes.
13 Repeat Comment - Please identify what ground cover will be used at the base of the
building on the rear and side facades.
There is no property on the sides to plant groundopver since the building shares
a common wall with Schotzi's and Zapata's. "-fld�
Thereis 38" of property at the rear of thewhich is paved to provide
access to the electrical service and the rear exit. This will be paved with
DD rative paving.
14- epeat Comment - Provide a general note that 100% coverage of groundcover,
decorative paving, decorative rock (not loose), or a perennial grass is required in parking
lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and
adjacent property disturbed during construction.
The parking lot to the North of the building does not belong to the owner.
15 An application to DRIB has been received for:
1/ a. 12' sidewalk along University Drive, the existing sidewalk varies from 8'-10'.
b. Street trees
c. Street benches
Submitted
Reminder: Please re -submit elevations for staff review.
Submitted
17. Please note that any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and "bubbled" on
your plans. Any additional changes on these plans that the City has not been made
aware of will constitute a completely new review.
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 14, 2008
ENGINEERING COMMENTS NO. 2
1. (Repeat Comment) Please submit a Development Permit and Development Permit
Application Fee.? tiGt
Submitted with Patricia Street water line modification — Gattis Engineering�Gb
2. (Repeat Comment) Please provide volume and page number of the existing 10-ft Electrical
Easement and the 8-ft Access Easement shown between your property and Schotzi's.
The 8 foot access easement is Document 01019626, Bk.DR, Vol. 8952,. Pg 203
Electricial service was modified and does not require and easement Iv0 ilu --Ffi
3. Site Plan —Please provide water and sanitary sewer demands on the site plan.
11
The Water and Sewer Demand is 19 Fixture units.�yY1�hJJ,ytt tc� fir/ Oil h�lgMi
4. Site Plan — Please show the full extent of proposed waterline�-nWina fib efeh Mies t 'V"' A� '
existing main on Boyette St. �QCt `iGG"1 31tC
Reference Patricia Street Water Line modification — Gattis Engineering*
5. Site Plan — Please label all proposed waterlines with size and material and the existing main
on Boyette St. with its size. Please also clearly label the fire hydrant as proposed. oWV-) 1'0C6aeMj
Reference Patricia Street Water Line modification — Gattis Engineering
Site Plan — Our records indicate a 5-ft PUE (Vol.7462/Pg.246) along Patricia St. Please
verify and show on site plan if it is on the property.
Reference Patricia Street Water Line modification — Gattis Engineering
�. Site Plan — Our records indicate an existing sanitary sewer line running parallel to the
proposed water line and crossing Patricia into the parking lot. Please show and label on the
site plan.
Sewer Line is drawn on Site Plan.
8. Site Plan — The FDC connection needs to be shown and labeled on the site plan at the back
of the building facing the fire lane.
Will be submitted with Sprinkler Drawings
9. Site Plan — The fire hydrant is required to be within a public utility easement. Easement
dedication documents will need to be submitted and executed by the private property owner
prior to site plan approval. :�;qc�Lo ZP w)
Reference Patricia Street Water Line modification — Gattis Engineering I61"1
10. Site Plan — Please provide a letter stating that you have been granted permission to place
the proposed utilities (public and private) on private property.
Domestic water and sewer or existing. For the fire line reference the Patricia
Street modification — Gattis Engineeiring New Ory Q; -v vrt ifvJt �i(e. �[,n2- �o CrbsS
SonnZ� � e 2 S �r Cr ' drh'
11. Construction Docs —Please provide engineer signed and se�l'ed co�hs �i drawings
(including plan and profile) for the proposed waterline extension and fire hydrant. i,!, 2 -LLD ILL(X�-
Reference Patricia Street Water Line modification — Gattis Engineering c;♦ vu- OjA wvA&��A
12. Construction Docs — Please submit the Public Infrastructure Inspection Fee, Engineer's Cost
Estimate, Letter of Acknowledgement, Erosion Control Plan, and Fire Flow Report. 1,1 �C�LIUk,�)
Reference Patricia Street Water Line modification — Gattis Engineering }
13. Construction Docs — FYI ... In addition to meeting all requirements in BCS Design Guidelines,
the fire flow report will need to show that the velocity within existing or proposed mains does
not exceed the 12 ft1s maximum limit. _
Will be submitted with the Fire Sprinkler Drawings�� i� v10W